![]() |
Bridge Statistics for Whitestown, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Whitestown, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 15 Total length: 114 meters (374ft) Total costs: $40,500,000 Total average daily traffic: 159,864 Total average daily truck traffic: 23,701 National Bridge Inventory (NBI) Registered Bridges for Whitestown
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 1051429, Location: JCT RTS 5A+69 (Lat: 43.115425, Lng: -75.287731), Route carried "on" structure: State highway 5A, Year Built: 1969, Status: Open, Structure Length: 3.96m (12.99ft), Average Daily Traffic: 10,148 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 12,395 (year 2027), Design Load: HS 20, Features Intersected: RTE 69 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.097, Lanes on structure: 3, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 23 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 38.1m (125.0ft), Curb-To-Curb Width: 17.8m (58.4ft), Out-to-Out Width: 19.6m (64.3ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 51.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.96m (12.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $4,606,000, Roadway Improvement Cost: $2,672,000, Total Project Cost: $7,278,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 105176, Location: .2 MI NE JCT RTS 69 & 291 (Lat: 43.139308, Lng: -75.303694), Route carried "on" structure: State highway 291, Year Built: 1994, Status: Open, Structure Length: 10.45m (34.28ft), Average Daily Traffic: 9,812 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 12,225 (year 2026), Design Load: HS 25, Features Intersected: CSX TRANS/AMTRAK, MOHAWK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.077, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.8m (38.7ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 54.8m (179.8ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 12.9m (42.3ft) Condition: Deck: Very good, Superstructure: Excellent, Substructure: Very good, Channel: Good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 57.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Superior to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.45m (34.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $1,148,000, Roadway Improvement Cost: $683,000, Total Project Cost: $1,831,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 22063, Location: AT ORISKANY (Lat: 43.155814, Lng: -75.330578), Route carried "on" structure: City street , Year Built: 1955, Status: Open, Structure Length: 3.16m (10.37ft), Average Daily Traffic: 1,479 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 1,842 (year 2018), Design Load: H 20, Features Intersected: ORISKANY CR, Facility Carried by Structure: UTICA STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 30.4m (99.7ft), Curb or Sidewalk Widths: Left: 1.6m (5.2ft), Right: 0.0m, Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.6m (31.5ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 59.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.16m (10.37ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $259,000, Roadway Improvement Cost: $148,000, Total Project Cost: $407,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331141, Location: .75 MI S OF ORISKANY (Lat: 43.142933, Lng: -75.337764), Route carried "on" structure: County highway , Year Built: 1986, Status: Open, Structure Length: 3.99m (13.09ft), Average Daily Traffic: 1,176 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 1,464 (year 2025), Design Load: HS 20, Features Intersected: ORISKANY CREEK, Facility Carried by Structure: COUNTY ROAD 32 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 38.1m (125.0ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Channel: Satisfactory, Operating Rating: 99.7 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.99m (13.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $179,000, Roadway Improvement Cost: $106,000, Total Project Cost: $285,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 331142, Location: 2 MI E ONEIDA CO. AIRPORT (Lat: 43.138075, Lng: -75.344956), Route carried "on" structure: County highway , Year Built: 1965, Status: Open, Structure Length: 6.97m (22.87ft), Average Daily Traffic: 5,178 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 6,448 (year 2018), Design Load: HS 20, Features Intersected: ORISKANY CREEK, Facility Carried by Structure: CR 40 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 34.7m (113.8ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 9.5m (31.2ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Very good, Operating Rating: 58.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 6.97m (22.87ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $1,434,000, Roadway Improvement Cost: $853,000, Total Project Cost: $2,287,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 331143, Location: 3.5 MI SE OF ORISKANY (Lat: 43.115603, Lng: -75.366203), Route carried "on" structure: County highway , Year Built: 1950, Year Reconstructed: 1993, Status: Open, Structure Length: 2.89m (9.48ft), Average Daily Traffic: 1,440 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 1,793 , Features Intersected: ORISKANY CREEK, Facility Carried by Structure: STONE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 26.8m (87.9ft), Curb-To-Curb Width: 7.6m (24.9ft), Out-to-Out Width: 8.2m (26.9ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.89m (9.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $1,434,000, Roadway Improvement Cost: $853,000, Total Project Cost: $2,287,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 442603, Location: OVER BARGE C N ORISKANY (Lat: 43.167719, Lng: -75.323728), Route carried "on" structure: Other road , Year Built: 1991, Status: Open, Structure Length: 8.90m (29.20ft), Average Daily Traffic: 3,843 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 4,786 (year 2027), Design Load: HS 20, Features Intersected: ERIE BARGE CANAL, Facility Carried by Structure: RIVER STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.167, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 2 degrees, Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 31.6m (103.7ft)), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 42.6m (139.8ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 10.9m (35.8ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Channel: Good, Operating Rating: 87.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.90m (29.20ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: June 2007, Underwater Inspection Date: August 2007, Bridge Improvement Cost: $1,474,000, Roadway Improvement Cost: $877,000, Total Project Cost: $2,351,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 44261, Location: 0.5MI N RTE69 IN ORISKANY (Lat: 43.165167, Lng: -75.325475), Route carried "on" structure: Other road , Year Built: 1991, Status: Open, Structure Length: 4.51m (14.80ft), Average Daily Traffic: 3,843 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 4,786 (year 2027), Design Load: HS 20, Features Intersected: MOHAWK RIVER, Facility Carried by Structure: RIVER STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.867, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 44.1m (144.7ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 10.9m (35.8ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Good, Channel: Good, Operating Rating: 78.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.51m (14.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $2,217,000, Roadway Improvement Cost: $1,463,000, Total Project Cost: $3,680,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 551298, Location: 7.63 MI W INT 31 ON I-90 (Lat: 43.127392, Lng: -75.344647), Route carried "on" structure: County highway , Year Built: 1952, Status: Open, Structure Length: 6.28m (20.60ft), Average Daily Traffic: 5,179 (year 1998), Truck Traffic: 6%, Average Future Daily Traffic: 6,449 (year 2018), Design Load: H 20, Features Intersected: RTE I90, Facility Carried by Structure: JUDD ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Toll Authority, Approaching Roadway Width: 7.6m (24.9ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 18.0m (59.1ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 84.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 6.28m (20.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,360,000, Roadway Improvement Cost: $809,000, Total Project Cost: $2,169,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 5512999, Location: 5.24 MI W INT 31 ON I-90 (Lat: 43.130753, Lng: -75.298044), Route carried "on" structure: Interstate 90, Year Built: 1955, Status: Open, Structure Length: 17.53m (57.51ft), Average Daily Traffic: 23,436 (year 2007), Truck Traffic: 21%, Average Future Daily Traffic: 36,028 (year 2027), Design Load: HS 20+Mod, Features Intersected: MAIN ST EXTENSION, CSX R Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 29.519, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 23.2m (76.1ft), Skew: 20 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 33.5m (109.9ft), Curb-To-Curb Width: 34.4m (112.9ft), Out-to-Out Width: 34.7m (113.8ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Fair, Operating Rating: 58.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 17.53m (57.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $1,360,000, Roadway Improvement Cost: $809,000, Total Project Cost: $2,169,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 5513009, Location: 4.48 MI W INT 31 ON I-90 (Lat: 43.135211, Lng: -75.284792), Route carried "on" structure: Interstate 90, Year Built: 1953, Status: Open, Structure Length: 11.70m (38.39ft), Average Daily Traffic: 23,436 (year 2007), Truck Traffic: 21%, Average Future Daily Traffic: 36,028 (year 2027), Design Load: HS 20+Mod, Features Intersected: MOHAWK RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 31.157, Lanes on structure: 4, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 29.2m (95.8ft), Skew: 30 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 36.5m (119.8ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 29.8m (97.8ft), Out-to-Out Width: 34.4m (112.9ft) Condition: Deck: Fair, Superstructure: Poor, Substructure: Fair, Channel: Good, Operating Rating: 91.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.70m (38.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $8,678,000, Roadway Improvement Cost: $5,035,000, Total Project Cost: $13,713,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 5513069, Location: 8 MI W EXIT 31 OF I90 (Lat: 43.127369, Lng: -75.350836), Route carried "on" structure: Interstate 90, Year Built: 2000, Status: Open, Structure Length: 6.28m (20.60ft), Average Daily Traffic: 23,806 (year 2006), Truck Traffic: 21%, Average Future Daily Traffic: 36,597 (year 2026), Design Load: HS 25, Features Intersected: ORISKANY CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 26.357, Lanes on structure: 4, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 32.9m (107.9ft), Skew: 24 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 31.4m (103.0ft), Curb-To-Curb Width: 32.9m (107.9ft), Out-to-Out Width: 34.4m (112.9ft) Condition: Deck: Very good, Superstructure: Excellent, Substructure: Very good, Channel: Good, Operating Rating: 72.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.28m (20.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $1,281,000, Roadway Improvement Cost: $762,000, Total Project Cost: $2,043,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Galvanized Reinforcing Find on map >>
Structure Number: 1051429, Location: JCT RTS 5A+69 (Lat: 43.115425, Lng: -75.287731), Route carried "under" structure: State highway 69, Year Built: 1969, Structure Length: 3.96m (12.99ft), Average Daily Traffic: 19,452 (year 2007), Truck Traffic: 6%, Features Intersected: RTE 69, Facility Carried by Structure: RTE 5A Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 0.107, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft) Find on map >>
Structure Number: 551298, Location: 7.63 MI W INT 31 ON I-90 (Lat: 43.127392, Lng: -75.344647), Route carried "under" structure: Interstate 90, Year Built: 1952, Structure Length: 6.28m (20.60ft), Average Daily Traffic: 23,436 (year 2007), Truck Traffic: 21%, Features Intersected: RTE I90, Facility Carried by Structure: JUDD ROAD Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 2.568, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.0m (59.1ft) Find on map >>
Structure Number: 5512999, Location: 5.24 MI W INT 31 ON I-90 (Lat: 43.130753, Lng: -75.298044), Route carried "under" structure: City street , Year Built: 1955, Structure Length: 17.53m (57.51ft), Average Daily Traffic: 4,200 (year 2007), Truck Traffic: 6%, Features Intersected: MAIN ST EXTENSION, CSX R, Facility Carried by Structure: RTE I90 Minimum Vertical Clearance: 6.96m (22.83ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Toll: On toll road, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 33.5m (109.9ft) Discuss this city on our hugely popular New York forum Back to: Whitestown, NY, New York, All US cities.
|
![]() |