Bridge Statistics for Williamsburg, Massachusetts (MA) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Williamsburg, MA, Massachusetts, Massachusetts forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 16
Total length: 26 meters (85ft)
Total costs: $6,715,000
Total average daily traffic: 50,900
Total average daily truck traffic: 4,586
Total future (year 2027) average daily traffic: 78,650
National Bridge Inventory (NBI) Registered Bridges for Williamsburg

New bridges - Historical Statistics

  • 1910-1919: 2
  • 1920-1929: 3
  • 1930-1939: 4
  • 1940-1949: 0
  • 1950-1959: 2
  • 1960-1969: 0
  • 1970-1979: 2
  • 1980-1989: 0
  • 1990-1999: 2
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: W360010K2MHDNBI,  Location: .2 M W JCT ST 9 (Lat: 42.392664,  Lng: -72.740983),  Route carried "on" structure: State highway 143,  Year Built: 1931,  Year Reconstructed: 1964,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 1,800 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,843 (year 2028),  Design Load: H 20,  Features Intersected: WATER MEEKINS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.260,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.0m (26.2ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $161,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $242,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: W360030JBMUNNBI,  Location: 100 FT S. JCT ASHFIELD RD (Lat: 42.430753,  Lng: -72.743306),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 1966,  Status: Posted for load,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 200 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 316 (year 2028),  Features Intersected: WATER BRADFORD BROOK,  Facility Carried by Structure: HWY HEMENWAY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.8m (22.3ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $170,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: W360040JRMHDNBI,  Location: .2 M W JCT NORTH ST. (Lat: 42.393333,  Lng: -72.734722),  Route carried "on" structure: State highway 9,  Year Built: 1971,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 8,400 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,056 (year 2027),  Design Load: H 20,  Features Intersected: WATER W BR MILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.183,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $739,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: W360060FFMUNNBI,  Location: AT JCT RTE 9 (Lat: 42.392947,  Lng: -72.730922),  Route carried "on" structure: City street ,  Year Built: 1913,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 800 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,263 (year 2028),  Features Intersected: WATER W BR MILL RIVER,  Facility Carried by Structure: HWY NORTH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 29.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $249,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $374,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: W360080J8MUNNBI,  Location: NE OF RT9 .5MI S OF RT143 (Lat: 42.393256,  Lng: -72.728550),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 200 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 316 (year 2027),  Design Load: H 20,  Features Intersected: WATER E BR MILL RIVER,  Facility Carried by Structure: HWY E MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 72.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $172,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: W360100B9MHDNBI,  Location: AT JCT OF RIVER RD (Lat: 42.389444,  Lng: -72.721111),  Route carried "on" structure: State highway 9,  Year Built: 1933,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 8,700 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,740 (year 2028),  Features Intersected: WATER MILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.866,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $665,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $998,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: W360110FEMUNNBI,  Location: JUST S OF RTE 9 (Lat: 42.373425,  Lng: -72.703089),  Route carried "on" structure: City street ,  Year Built: 1918,  Year Reconstructed: 1968,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 6,000 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,476 (year 2028),  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY BRIDGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 25.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $555,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $833,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: W360120FGMUNNBI,  Location: JUST N OF NORTHAMPTON (Lat: 42.368889,  Lng: -72.701667),  Route carried "on" structure: City street ,  Year Built: 1922,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 1,200 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,895 (year 2028),  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY S MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $397,000 ( Estimate for 2006),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: W360130JUMHDNBI,  Location: 300' E JCT OLD GOSHEN RD. (Lat: 42.402222,  Lng: -72.746111),  Route carried "on" structure: State highway 9,  Year Built: 1926,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 6,000 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,528 (year 2027),  Design Load: H 15,  Features Intersected: WATER W BR MILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.751,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $216,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $325,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: W360140JVMHDNBI,  Location: JCT NICHOLS RD. (Lat: 42.403333,  Lng: -72.749167),  Route carried "on" structure: State highway 9,  Year Built: 1926,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 6,000 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,528 (year 2027),  Design Load: H 15,  Features Intersected: WATER W BR MILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.456,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 57.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $451,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: W36015ANBMHDNBI,  Location: .1 M W JCT ST 143 (Lat: 42.395586,  Lng: -72.740103),  Route carried "on" structure: State highway 9,  Year Built: 2002,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 8,200 (year 2000),  Truck Traffic: 10%,  Average Future Daily Traffic: 12,950 (year 2027),  Design Load: HS 20,  Features Intersected: WATER W BR MILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.620,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.0m (65.6ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 94.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: W360170J9MUNNBI,  Location: SW OF RT9 .5MI N OF NHPTN (Lat: 42.374569,  Lng: -72.704564),  Route carried "on" structure: City street ,  Year Built: 1957,  Status: Posted for load,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 600 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 948 (year 2028),  Design Load: H 15,  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY S MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.660,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $342,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $514,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: W360180J7MUNNBI,  Location: W OF RT9 1MI N OF NHPTN (Lat: 42.381944,  Lng: -72.714444),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Posted for load,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 200 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 316 (year 2028),  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY SKNRVLLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 8.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2007,  Other Special Inspection Date: Febuary 2008,  Bridge Improvement Cost: $780,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $1,171,000 ( Estimate for 2006),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: W360210K1MHDNBI,  Location: JCT ST 9 (Lat: 42.394444,  Lng: -72.737500),  Route carried "on" structure: State highway 143,  Year Built: 1931,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 2,200 (year 2004),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,843 (year 2027),  Design Load: H 20,  Features Intersected: WATER W BR MILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.669,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 44.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2008,  Bridge Improvement Cost: $219,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $329,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: W36027AF5MUNNBI,  Location: NEAR GOSHEN TOWN LINE (Lat: 42.419722,  Lng: -72.762500),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 1.50m (4.92ft),  Average Daily Traffic: 200 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 316 (year 2028),  Design Load: HS 20,  Features Intersected: WATER W BR MILL RIVER,  Facility Carried by Structure: HWY OLD GOSHEN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: W36028AF6MUNNBI,  Location: AT RTE 9 WEST OF TOWN (Lat: 42.404444,  Lng: -72.750556),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 200 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 316 (year 2028),  Design Load: HS 20,  Features Intersected: WATER W BR MILL RIVER,  Facility Carried by Structure: HWY VILLAGE HILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.8m (48.6ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing

Discuss this city on our hugely popular Massachusetts forum

Back to: Williamsburg, MA, Massachusetts, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.