National Bridge Inventory (NBI) Statistics
Number of bridges: 21
Total length: 38 meters (125ft)
Total costs: $17,425,000
Total average daily traffic: 51,058
Total average daily truck traffic: 4,292
Total future (year 2015) average daily traffic: 76,587
National Bridge Inventory (NBI) Registered Bridges for Wilmington

New bridges - Historical Statistics

  • 1930-1939: 14
  • 1940-1949: 0
  • 1950-1959: 2
  • 1960-1969: 1
  • 1970-1979: 1
  • 1980-1989: 1
  • 1990-1999: 2

Reconstructed bridges - Historical Statistics

  • 1960-1969: 3
  • 1970-1979: 0
  • 1980-1989: 2
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 101322000913221,  Location: 0.05 MI TO JCT W C3 TH19 (Lat: 42.897500,  Lng: -72.832500),  Route carried "on" structure: Other road C2003,  Year Built: 1936,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,120 (year 1999),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,680 (year 2019),  Design Load: H 15,  Features Intersected: BILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $422,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $572,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 101322001013221,  Location: 0.2 MI TO JCT W CL2 TH4 (Lat: 42.893333,  Lng: -72.820278),  Route carried "on" structure: Other road C2003,  Year Built: 1939,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,120 (year 1997),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,680 (year 2017),  Design Load: H 15,  Features Intersected: HALL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $569,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 101322001113221,  Location: 0.3 MI TO JCT W CL3 TH17 (Lat: 42.898333,  Lng: -72.809167),  Route carried "on" structure: Other road C2003,  Year Built: 1939,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,120 (year 1997),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,680 (year 2017),  Design Load: H 15,  Features Intersected: HALL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $465,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $615,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 101322001413221,  Location: 0.1 MI TO JCT W CL3 TH17 (Lat: 42.896111,  Lng: -72.813056),  Route carried "on" structure: Other road C2003,  Year Built: 1939,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 1,120 (year 1999),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,680 (year 2019),  Design Load: H 20,  Features Intersected: MEADOW BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $589,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $739,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 101322001513221,  Location: 0.01 MI TO JCT W CL2 TH3 (Lat: 42.891944,  Lng: -72.823333),  Route carried "on" structure: Other road C2004,  Year Built: 1939,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 260 (year 1997),  Truck Traffic: 3%,  Average Future Daily Traffic: 390 (year 2017),  Features Intersected: BILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.96m (9.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $746,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $896,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 101322001613221,  Location: 0.1 MI E JCT VT 100 (Lat: 42.905556,  Lng: -72.849722),  Route carried "on" structure: Other road C2003,  Year Built: 1939,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 1,148 (year 2004),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,722 (year 2024),  Design Load: HS 20,  Features Intersected: N BR DEERFIELD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,173,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,323,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 101322001713221,  Location: @ JCT OF TH33 & TH56 (Lat: 42.867778,  Lng: -72.873333),  Route carried "on" structure: Other road C3033,  Year Built: 1939,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 900 (year 1997),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,350 (year 2017),  Design Load: H 20,  Features Intersected: BEAVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $801,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $951,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 101322005113221,  Location: 0.02 MI TO JCT W CL2 TH2 (Lat: 42.921667,  Lng: -72.836944),  Route carried "on" structure: Other road C3054,  Year Built: 1970,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 30 (year 2004),  Truck Traffic: 2%,  Average Future Daily Traffic: 45 (year 2024),  Features Intersected: ELLIS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $237,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $387,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 101322005513221,  Location: 0.1 MI TO JCT W VT9 (Lat: 42.865278,  Lng: -72.856667),  Route carried "on" structure: Other road C3023,  Year Built: 1954,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 100 (year 1997),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2017),  Features Intersected: BEAVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 21.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $389,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $539,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>

Structure Number: 101322005613221,  Location: @ JCT OF TH6 & TH77 (Lat: 42.902222,  Lng: -72.865833),  Route carried "on" structure: Other road C3006,  Year Built: 1954,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 100 (year 1997),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2017),  Features Intersected: COLD BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 20.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $546,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 101322005713221,  Location: 0.02 MI TO JCT W VT9 (Lat: 42.870833,  Lng: -72.919444),  Route carried "on" structure: Other road C3031,  Year Built: 1985,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 80 (year 1997),  Truck Traffic: 2%,  Average Future Daily Traffic: 120 (year 2017),  Design Load: HS 20,  Features Intersected: DEERFIELD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $909,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,059,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200010003013222,  Location: 0.8 MI W JCT. VT.100 N (Lat: 42.872222,  Lng: -72.885556),  Route carried "on" structure: State highway 9,  Year Built: 1939,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 4,300 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,450 (year 2018),  Design Load: H 15,  Features Intersected: BINNEY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.255,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.93m (9.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $784,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $934,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200010003113222,  Location: 0.1 MI W JCT VT 100 N (Lat: 42.868611,  Lng: -72.871389),  Route carried "on" structure: State highway 9,  Year Built: 1934,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 4,300 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,450 (year 2018),  Design Load: H 15,  Features Intersected: N. BR. DEERFIELD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.542,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $917,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,067,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200010003213222,  Location: 0.4 MI E JCT. VT.100 N (Lat: 42.865833,  Lng: -72.864722),  Route carried "on" structure: State highway 9,  Year Built: 1939,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 8,500 (year 2000),  Truck Traffic: 10%,  Average Future Daily Traffic: 12,750 (year 2020),  Design Load: HS 25,  Features Intersected: BEAVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.169,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,269,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,419,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200010003413222,  Location: 0.1 MI E JCT. VT.100 S (Lat: 42.860556,  Lng: -72.851111),  Route carried "on" structure: State highway 9,  Year Built: 1934,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 5,100 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,650 (year 2018),  Design Load: H 15,  Features Intersected: BEAVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.553,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $789,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $939,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200010003613222,  Location: 0.9 MI E JCT VT 100 S (Lat: 42.855278,  Lng: -72.837778),  Route carried "on" structure: State highway 9,  Year Built: 1990,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 5,100 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,650 (year 2018),  Design Load: HS 25,  Features Intersected: BEAVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.905,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $482,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $632,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 200010003913222,  Location: 2.1 MI E JCT VT 100S (Lat: 42.854722,  Lng: -72.816944),  Route carried "on" structure: State highway 9,  Year Built: 1990,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 4,400 (year 1998),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,600 (year 2018),  Design Load: HS 25,  Features Intersected: BEAVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.734,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $204,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $229,000 ( Estimate for 2007)
Find on map >>

Structure Number: 200013005113222,  Location: 1.6 MI N JCT. VT.9 W (Lat: 42.886111,  Lng: -72.865000),  Route carried "on" structure: State highway 100,  Year Built: 1933,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 5,400 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,100 (year 2018),  Design Load: H 20,  Features Intersected: N. BR. DEERFIELD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.873,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,260,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,410,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200013005313222,  Location: 2.6 MI N JCT. VT.9 W (Lat: 42.897778,  Lng: -72.855278),  Route carried "on" structure: State highway 100,  Year Built: 1967,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 5,400 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,100 (year 2018),  Design Load: H 20,  Features Intersected: COLD BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.530,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $649,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $799,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200106001913222,  Location: 0.2 MI E JCT. VT.100 (Lat: 42.914444,  Lng: -72.837778),  Route carried "on" structure: County highway 2,  Year Built: 1938,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 730 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,095 (year 2015),  Design Load: H 15,  Features Intersected: DEERFIELD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $971,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,121,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 200106013W13222,  Location: 0.1 MI E JCT. VT.100 (Lat: 42.913611,  Lng: -72.838889),  Route carried "on" structure: County highway 2,  Year Built: 1939,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 730 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,095 (year 2015),  Design Load: H 15,  Features Intersected: OVERFLOW BR. DEERFIELD R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $529,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $679,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric

Discuss this city on our hugely popular Vermont forum