Bridge Statistics for Winooski, Vermont (VT) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Winooski, VT, Vermont, Vermont forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 10 Total length: 39 meters (128ft) Total costs: $14,486,000 Total average daily traffic: 159,550 Total average daily truck traffic: 13,044 National Bridge Inventory (NBI) Registered Bridges for Winooski
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Find on map >>
Structure Number: 100418000104181, Location: .05 MI TO JCT W ALLEN ST (Lat: 44.491944, Lng: -73.189722), Route carried "on" structure: Other road C30WE, Year Built: 1916, Status: Open, Structure Length: 1.71m (5.61ft), Average Daily Traffic: 750 (year 1999), Truck Traffic: 2%, Average Future Daily Traffic: 1,125 (year 2019), Features Intersected: NEW ENGLAND CENTRAL RR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.6m (38.1ft), Curb or Sidewalk Widths: Left: 2.4m (7.9ft), Right: 2.3m (7.5ft), Curb-To-Curb Width: 16.2m (53.1ft), Out-to-Out Width: 17.0m (55.8ft) Condition: Culverts: Fair, Operating Rating: 54.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.38m (7.81ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $1,293,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,443,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 200089071N04182, Location: 0.2 MI S EXIT 15 (Lat: 44.490556, Lng: -73.173056), Route carried "on" structure: Interstate 89, Year Built: 1962, Status: Open, Structure Length: 4.33m (14.21ft), Average Daily Traffic: 24,550 (year 1998), Truck Traffic: 8%, Average Future Daily Traffic: 36,825 (year 2018), Design Load: HS 20, Features Intersected: I 89 OVER NECRR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 145.277, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 13 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 14.3m (46.9ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Satisfactory, Operating Rating: 69.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.18m (16.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $2,106,000, Roadway Improvement Cost: $150,000, Total Project Cost: $2,256,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200089071S04182, Location: 0.2 MI S EXIT 15 (Lat: 44.490556, Lng: -73.173333), Route carried "on" structure: Interstate 89, Year Built: 1962, Status: Open, Structure Length: 4.33m (14.21ft), Average Daily Traffic: 24,550 (year 1998), Truck Traffic: 8%, Average Future Daily Traffic: 36,825 (year 2018), Design Load: Railroad, Features Intersected: I 89 OVER NECRR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 145.277, Lanes on structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 2.4m (7.9ft), Skew: 13 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 14.3m (46.9ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Satisfactory, Operating Rating: 69.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.18m (16.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $2,106,000, Roadway Improvement Cost: $150,000, Total Project Cost: $2,256,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200089072N04182, Location: I89 EXIT 15 (Lat: 44.493333, Lng: -73.173056), Route carried "on" structure: Interstate 89, Year Built: 1962, Status: Open, Structure Length: 5.09m (16.70ft), Average Daily Traffic: 14,250 (year 1998), Truck Traffic: 8%, Average Future Daily Traffic: 21,375 (year 2018), Design Load: HS 20, Features Intersected: I 89 OVER VT 15 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 145.582, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 10 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 28.0m (91.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Fair, Superstructure: Very good, Substructure: Satisfactory, Operating Rating: 62.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.10m (20.01ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $1,845,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,995,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 200089072S04182, Location: I89 EXIT 15 (Lat: 44.493333, Lng: -73.173333), Route carried "on" structure: Interstate 89, Year Built: 1962, Status: Open, Structure Length: 5.09m (16.70ft), Average Daily Traffic: 14,250 (year 1998), Truck Traffic: 8%, Average Future Daily Traffic: 21,375 (year 2018), Design Load: HS 20, Features Intersected: I 89 OVER VT 15 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 145.582, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 10 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 28.0m (91.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Satisfactory, Operating Rating: 62.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.10m (20.01ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $1,845,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,995,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200089073N04182, Location: 0.1 MI N EXIT 15 (Lat: 44.495278, Lng: -73.173333), Route carried "on" structure: Interstate 89, Year Built: 1962, Status: Open, Structure Length: 3.87m (12.70ft), Average Daily Traffic: 14,250 (year 1998), Truck Traffic: 8%, Average Future Daily Traffic: 21,375 (year 2018), Design Load: HS 20, Features Intersected: I 89 OVER LAFOUNTAIN Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 145.791, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 10 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 17.4m (57.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 66.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.63m (15.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $1,723,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,873,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200089073S04182, Location: 0.1 MI N EXIT 15 (Lat: 44.495278, Lng: -73.173611), Route carried "on" structure: Interstate 89, Year Built: 1962, Status: Open, Structure Length: 3.72m (12.20ft), Average Daily Traffic: 14,250 (year 1998), Truck Traffic: 8%, Average Future Daily Traffic: 21,375 (year 2018), Design Load: HS 20, Features Intersected: I 89 OVER LAFOUNTAIN Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 145.791, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 10 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 66.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.45m (14.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $1,656,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,806,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 205100015104182, Location: 0.1 MI N JCT. VT.15 (Lat: 44.492222, Lng: -73.186389), Route carried "on" structure: US 7, Year Built: 1952, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 10,100 (year 1998), Truck Traffic: 7%, Average Future Daily Traffic: 15,150 (year 2018), Design Load: H 20, Features Intersected: US 7 OVER N.E.C. RR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 217.814, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 17.6m (57.7ft), Out-to-Out Width: 18.3m (60.0ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 46.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 27.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.37m (4.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $712,000, Roadway Improvement Cost: $150,000, Total Project Cost: $862,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 200089072N04182, Location: 0.6 MI E JCT US 7 (Lat: 44.493333, Lng: -73.173056), Route carried "under" structure: State highway 15, Year Built: 1962, Structure Length: 5.09m (16.70ft), Average Daily Traffic: 21,300 (year 1996), Truck Traffic: 9%, Features Intersected: I 89 OVER VT15, Facility Carried by Structure: I 00089 ML Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 1.094, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.0m (91.9ft) Find on map >>
Structure Number: 200089072S04182, Location: 0.6 MI E JCT US 7 (Lat: 44.493333, Lng: -73.173333), Route carried "under" structure: State highway 15, Year Built: 1962, Structure Length: 5.09m (16.70ft), Average Daily Traffic: 21,300 (year 1996), Truck Traffic: 9%, Features Intersected: I 89 OVER VT15, Facility Carried by Structure: I 00089 ML Minimum Vertical Clearance: 0.47m (1.54ft), Kilometerpoint: 1.094, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.0m (91.9ft) Discuss this city on our hugely popular Vermont forum Back to: Winooski, VT, Vermont, All US cities.
|
![]() |