Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Woodbury Heights, New Jersey (NJ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 167ft / 50.7mTotal length
  • $9,344,000Total costs
  • 433,542Total average daily traffic
  • 25,551Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Woodbury Heights
  • No street view available for this location

New bridges in Woodbury Heights, NJ - historical statistics
  • New bridges - historical statistics
  • 61950-1959
  • 41980-1989
  • 22000-2009
Average Bridge Daily Traffic in Woodbury Heights, NJ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 50.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 33.3%Good
  • 50.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 832162,  Location: .26 miles SE. of CR 647 (Lat: 39.794811,  Lng: -75.114961),  Route carried "on" structure: State highway 47,  Year Built: 1985,  Status: Open,  Structure Length: 11.31m (37.11ft),  Average Daily Traffic: 12,618 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 17,815 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: NJ 55
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 111.640,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 44.2m (145.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 832164,  Location: 1.5 MILES N OF NJ 47 (Lat: 39.813161,  Lng: -75.105581),  Route carried "on" structure: County highway 534,  Year Built: 1984,  Status: Open,  Structure Length: 11.22m (36.81ft),  Average Daily Traffic: 7,765 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,320 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: NJ 55
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.331,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 44.2m (145.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: M02023R,  Location: 7 MI NORTH OF EXIT 2 (Lat: 39.815828,  Lng: -75.164094),  Route carried "on" structure: State highway 45,  Year Built: 2007,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 29,733 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 35,679 (year 2040),  Design Load: HS 20,  Features Intersected: NJ TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.027,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 27.1m (88.9ft),  Skew: 34 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.2m (122.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 26.0m (85.3ft),  Out-to-Out Width: 31.1m (102.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.62m (25.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $212,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $318,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: M02047,  Location: 6 MI SOUTH OF EXIT 3 (Lat: 39.817511,  Lng: -75.160044),  Route carried "on" structure: County highway 652,  Year Built: 1951,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 5,310 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,371 (year 2040),  Design Load: H 20,  Features Intersected: NJ TURNPIKE,  Facility Carried by Structure: ELM AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $5,406,000,  Roadway Improvement Cost: $1,136,000,  Total Project Cost: $9,026,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: M02096,  Location: 5.2 MI SOUTH OF EXIT 3 (Lat: 39.820881,  Lng: -75.152633),  Route carried "on" structure: Other road NJTPK,  Year Built: 1950,  Status: Open,  Structure Length: 8.20m (26.90ft),  Average Daily Traffic: 54,953 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 67,053 (year 2040),  Design Load: HS 20,  Features Intersected: WEST JERSEY AVE & PRSL,  Facility Carried by Structure: NJ TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.070,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 32 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.0m,  Curb-To-Curb Width: 27.8m (91.2ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 22.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: M02108,  Location: 5 MI SOUTH OF EXIT 3 (Lat: 39.821861,  Lng: -75.150539),  Route carried "on" structure: Other road NJTPK,  Year Built: 1951,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 54,952 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 67,052 (year 2040),  Design Load: HS 20,  Features Intersected: N. GLASSBORO RD,  Facility Carried by Structure: NJ TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.279,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 31 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 27.7m (90.9ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 832162,  Location: .26 miles SE. of CR 647 (Lat: 39.794811,  Lng: -75.114961),  Route carried "under" structure: State highway 55,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 74,482 (year 2021),  Truck Traffic: 5%,  Features Intersected: NJ 55,  Facility Carried by Structure: NJ 47
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 90.719,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 832164,  Location: 1.5 MILES N OF NJ 47 (Lat: 39.813161,  Lng: -75.105581),  Route carried "under" structure: State highway 55,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 67,715 (year 2021),  Truck Traffic: 5%,  Features Intersected: NJ 55,  Facility Carried by Structure: GOOD INTENT RD-534
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 93.117,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: M02023R,  Location: 7 MI NORTH OF EXIT 2 (Lat: 39.815828,  Lng: -75.164094),  Route carried "under" structure: Other road NJTPK,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 54,953 (year 2020),  Truck Traffic: 5%,  Features Intersected: NJ TURNPIKE,  Facility Carried by Structure: NJ 45 (MANTUA PIK)
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 32.895,  Lanes on structure: 4,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: M02047,  Location: 6 MI SOUTH OF EXIT 3 (Lat: 39.817511,  Lng: -75.160044),  Route carried "under" structure: Other road NJTPK,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 54,954 (year 2020),  Truck Traffic: 7%,  Features Intersected: NJ TURNPIKE,  Facility Carried by Structure: ELM AVE
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 33.281,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: M02096,  Location: 5.2 MI SOUTH OF EXIT 3 (Lat: 39.820881,  Lng: -75.152633),  Route carried "under" structure: Alternate City street ,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 656 (year 2020),  Truck Traffic: 1%,  Features Intersected: WEST JERSEY AVE & PRSL,  Facility Carried by Structure: NJ TURNPIKE
Minimum Vertical Clearance: 7.32m (24.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: M02108,  Location: 5 MI SOUTH OF EXIT 3 (Lat: 39.821861,  Lng: -75.150539),  Route carried "under" structure: County highway 553,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 15,451 (year 2020),  Truck Traffic: 4%,  Features Intersected: N. GLASSBORO RD,  Facility Carried by Structure: NJ TURNPIKE
Minimum Vertical Clearance: 6.65m (21.82ft),  Kilometerpoint: 78.729,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Discuss Woodbury Heights, New Jersey (NJ) on our hugely popular New Jersey forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.