Bridge Statistics for Yates, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Yates, NY, New York, New York forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 10
Total length: 15 meters (49ft)
Total costs: $4,354,000
Total average daily traffic: 2,736
Total average daily truck traffic: 162
Total future (year 2014) average daily traffic: 3,933
National Bridge Inventory (NBI) Registered Bridges for Yates

New bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 4
  • 1940-1949: 1
  • 1950-1959: 1
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 1
  • 1990-1999: 2

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 10147,  Location: 3.0MI E JCT RTS 18 + 269 (Lat: 43.347486,  Lng: -78.405975),  Route carried "on" structure: State highway 18,  Year Built: 1929,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 833 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,188 (year 2027),  Features Intersected: MARSH CREEK WEST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.256,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $154,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $245,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 33188,  Location: 1.2 MI N ASHWOOD (Lat: 43.345383,  Lng: -78.309489),  Route carried "on" structure: County highway ,  Year Built: 1933,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 430 (year 2000),  Truck Traffic: 6%,  Average Future Daily Traffic: 706 (year 2020),  Features Intersected: JOHNSON CREEK,  Facility Carried by Structure: YATES CARLTON TLR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $466,000,  Roadway Improvement Cost: $277,000,  Total Project Cost: $743,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331882,  Location: 1.5 MI E OF YATES CENTER (Lat: 43.335422,  Lng: -78.358703),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 3.50m (11.48ft),  Average Daily Traffic: 246 (year 2000),  Truck Traffic: 5%,  Average Future Daily Traffic: 340 (year 2020),  Design Load: HS 20,  Features Intersected: JOHNSON CREEK,  Facility Carried by Structure: BLOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $651,000,  Roadway Improvement Cost: $387,000,  Total Project Cost: $1,038,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331883,  Location: 1.5 MI SW OF LYNDONVILLE (Lat: 43.306053,  Lng: -78.407564),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 166 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 230 (year 2023),  Features Intersected: JOHNSON CREEK,  Facility Carried by Structure: ANGLING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $493,000,  Roadway Improvement Cost: $293,000,  Total Project Cost: $786,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 331884,  Location: 1.8 MI SW OF LYNDONVILLE (Lat: 43.306447,  Lng: -78.417881),  Route carried "on" structure: City street ,  Year Built: 1949,  Status: Open,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 211 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 292 (year 2023),  Features Intersected: JOHNSON CREEK,  Facility Carried by Structure: MARSHALL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 81.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2006,  Underwater Inspection Date: September 2005,  Bridge Improvement Cost: $308,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $491,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331908,  Location: 1.3 MI E SHADIGEE (Lat: 43.370031,  Lng: -78.363903),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 151 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 209 (year 2014),  Features Intersected: MARSH CREEK,  Facility Carried by Structure: LAKE SHORE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 71.9 metric tons,  Inventory Rating: 28.3 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $164,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $262,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 331909,  Location: 1.7 MI W SHADIGEE (Lat: 43.371953,  Lng: -78.422292),  Route carried "on" structure: County highway ,  Year Built: 1939,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 265 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 367 (year 2026),  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: LAKESHORE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 47.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $119,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $190,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 3362,  Location: 2.7 MI NNW ASHWOOD (Lat: 43.366097,  Lng: -78.322783),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 161 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 223 (year 2027),  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: LAKE SHORE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 73.9 metric tons,  Inventory Rating: 29.3 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $182,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336706,  Location: QTR MILE NORTH OF RTE 18 (Lat: 43.362408,  Lng: -78.339253),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 89 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 123 (year 2022),  Features Intersected: MARSH CREEK,  Facility Carried by Structure: MORRISON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 74.9 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $182,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336796,  Location: 1.0 MI NORTH OF S.H.18 (Lat: 43.359847,  Lng: -78.465569),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 184 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 255 (year 2027),  Features Intersected: UNKNOWN CREEK,  Facility Carried by Structure: NIAG-ORL CO LN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 74.9 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $147,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $235,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New York forum

Back to: Yates, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.