![]() |
Bridge Statistics for Yorktown, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Yorktown, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 51 Total length: 240 meters (787ft) Total costs: $79,850,000 Total average daily traffic: 933,402 Total average daily truck traffic: 56,268 National Bridge Inventory (NBI) Registered Bridges for Yorktown
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 100343, Location: 0.3 MI W JCT US 6 + TSP (Lat: 41.331519, Lng: -73.823614), Route carried "on" structure: US 6, Year Built: 1963, Status: Open, Structure Length: 1.52m (4.99ft), Average Daily Traffic: 17,208 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 24,091 (year 2026), Design Load: H 20, Features Intersected: SHRUB OAK BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.073, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.4m (40.7ft), Skew: 20 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 4.5m (14.8ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 31.0m (101.7ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 73.1 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.52m (4.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $1,046,000, Roadway Improvement Cost: $622,000, Total Project Cost: $1,668,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 102339, Location: 0.8 MI W JCT RTE 202+TSP (Lat: 41.290747, Lng: -73.834842), Route carried "on" structure: State highway 35, Year Built: 1933, Year Reconstructed: 1973, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 21,357 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 29,900 (year 2026), Design Load: HS 20, Features Intersected: HUNTER BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.982, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.3m (24.0ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 10.6m (34.8ft), Out-to-Out Width: 11.4m (37.4ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 65.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.85m (2.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $602,000, Roadway Improvement Cost: $358,000, Total Project Cost: $960,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 103614, Location: .2 MI S.JCT RTS 100 & 118 (Lat: 41.229036, Lng: -73.766392), Route carried "on" structure: State highway 100, Year Built: 1989, Status: Open, Structure Length: 18.37m (60.27ft), Average Daily Traffic: 10,859 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 15,203 (year 2022), Design Load: HS 20, Features Intersected: NEW CROTON RESVOR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 26.135, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.8m (51.8ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 70.1m (230.0ft), Curb-To-Curb Width: 15.8m (51.8ft), Out-to-Out Width: 16.4m (53.8ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Channel: Very good, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 18.37m (60.27ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2007, Underwater Inspection Date: August 2005, Bridge Improvement Cost: $2,168,000, Roadway Improvement Cost: $1,258,000, Total Project Cost: $3,426,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 103758, Location: 2 MI W JCT SH100 & SH118 (Lat: 41.237400, Lng: -73.841925), Route carried "on" structure: State highway 129, Year Built: 1990, Status: Open, Structure Length: 26.27m (86.19ft), Average Daily Traffic: 6,572 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 9,201 (year 2025), Design Load: HS 20, Features Intersected: CROTON LAKE RESER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.418, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 73.1m (239.8ft), Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 11.5m (37.7ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Channel: Very good, Inventory Rating: 64.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 26.27m (86.19ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: August 2007, Underwater Inspection Date: September 2007, Bridge Improvement Cost: $3,931,000, Roadway Improvement Cost: $2,241,000, Total Project Cost: $6,172,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 103771, Location: 0.4 MI S JCT RTE 6+TSP (Lat: 41.327506, Lng: -73.819681), Route carried "on" structure: State highway 132, Year Built: 2007, Status: Open, Structure Length: 3.84m (12.60ft), Average Daily Traffic: 8,168 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 11,435 (year 2025), Design Load: HS 25, Features Intersected: RTE 987G Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.998, Lanes on structure: 2, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.0m (49.2ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 18.0m (59.1ft), Curb-To-Curb Width: 15.0m (49.2ft), Out-to-Out Width: 16.7m (54.8ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Very good, Operating Rating: 91.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.84m (12.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $1,416,000, Roadway Improvement Cost: $842,000, Total Project Cost: $2,258,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Galvanized Reinforcing Find on map >>
Structure Number: 103772, Location: 0.2MI W TSP+0.1MI S RTEG (Lat: 41.329511, Lng: -73.821008), Route carried "on" structure: State highway 132, Year Built: 1923, Status: Posted for load-capacity, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 17,096 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 22,274 (year 2022), Features Intersected: SHRUB OAK BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 165.164, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.3m (24.0ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 8.0m (26.2ft), Out-to-Out Width: 8.6m (28.2ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 44.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.76m (2.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $1,416,000, Roadway Improvement Cost: $842,000, Total Project Cost: $2,258,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1037771, Location: JCT TSP & RTE 134 (Lat: 41.214511, Lng: -73.810144), Route carried "on" structure: Other road 987G, Year Built: 1968, Status: Open, Structure Length: 1.61m (5.28ft), Average Daily Traffic: 29,450 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 41,230 (year 2022), Design Load: HS 20, Features Intersected: RTE 134 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 17.369, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 17.9m (58.7ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.1m (52.8ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 14.8m (48.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 84.1 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.61m (5.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $530,000, Roadway Improvement Cost: $315,000, Total Project Cost: $845,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1037772, Location: JCT TSP & RTE 134 (Lat: 41.214511, Lng: -73.810144), Route carried "on" structure: Other road 987G, Year Built: 1930, Status: Open, Structure Length: 2.07m (6.79ft), Average Daily Traffic: 29,450 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 41,230 (year 2022), Design Load: HS 20+Mod, Features Intersected: RTE 134 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 22.034, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 13.9m (45.6ft), Out-to-Out Width: 16.7m (54.8ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 83.8 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.07m (6.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $764,000, Roadway Improvement Cost: $455,000, Total Project Cost: $1,219,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1077691, Location: JCT TSP - US 202 & 35 (Lat: 41.292361, Lng: -73.821114), Route carried "on" structure: City street 987G, Year Built: 2003, Status: Open, Structure Length: 2.89m (9.48ft), Average Daily Traffic: 20,024 (year 2000), Truck Traffic: 6%, Average Future Daily Traffic: 29,069 (year 2020), Design Load: HS 25, Features Intersected: RTE 35 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 188.478, Lanes on structure: 3, Lanes under structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 14.4m (47.2ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.9m (94.8ft), Curb-To-Curb Width: 14.7m (48.2ft), Out-to-Out Width: 16.3m (53.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 77.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.89m (9.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $1,042,000, Roadway Improvement Cost: $620,000, Total Project Cost: $1,662,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1077692, Location: JCT TSP-US 202 & 35 (Lat: 41.292403, Lng: -73.821006), Route carried "on" structure: Other road 987G, Year Built: 2003, Status: Open, Structure Length: 2.89m (9.48ft), Average Daily Traffic: 23,473 (year 2000), Truck Traffic: 6%, Average Future Daily Traffic: 34,076 (year 2020), Design Load: HS 25, Features Intersected: RTE 35 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 188.478, Lanes on structure: 3, Lanes under structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 14.4m (47.2ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.9m (94.8ft), Curb-To-Curb Width: 14.7m (48.2ft), Out-to-Out Width: 16.3m (53.5ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 79.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.89m (9.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $1,042,000, Roadway Improvement Cost: $620,000, Total Project Cost: $1,662,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1077701, Location: .5 MI N JCT TSP & US 202 (Lat: 41.298844, Lng: -73.822522), Route carried "on" structure: Other road 987G, Year Built: 2003, Status: Open, Structure Length: 2.24m (7.35ft), Average Daily Traffic: 20,024 (year 2000), Truck Traffic: 6%, Average Future Daily Traffic: 29,069 (year 2020), Design Load: HS 25, Features Intersected: RAMP N TO BMP Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 189.058, Lanes on structure: 3, Lanes under structure: 1, Owner: State Highway Agency, Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.4m (73.5ft), Curb-To-Curb Width: 14.9m (48.9ft), Out-to-Out Width: 16.3m (53.5ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 82.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.24m (7.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Bridge Improvement Cost: $801,000, Roadway Improvement Cost: $477,000, Total Project Cost: $1,278,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1077702, Location: .5 MI N JCT TSP & US 202 (Lat: 41.298836, Lng: -73.822400), Route carried "on" structure: Other road 987G, Year Built: 2003, Status: Open, Structure Length: 2.24m (7.35ft), Average Daily Traffic: 20,024 (year 2000), Truck Traffic: 6%, Average Future Daily Traffic: 29,069 (year 2020), Design Load: HS 25, Features Intersected: RAMP N TO BEAR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 189.058, Lanes on structure: 3, Lanes under structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 14.8m (48.6ft), Skew: 22 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.4m (73.5ft), Curb-To-Curb Width: 14.9m (48.9ft), Out-to-Out Width: 16.3m (53.5ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 82.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.24m (7.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Bridge Improvement Cost: $801,000, Roadway Improvement Cost: $477,000, Total Project Cost: $1,278,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 1077711, Location: 0.8 MI N JCT Rt.202 & TSP (Lat: 41.303056, Lng: -73.824081), Route carried "on" structure: State highway , Year Built: 2006, Status: Open, Structure Length: 0.76m (2.49ft), Design Load: HS 25, Features Intersected: HUNTER BROOK, Facility Carried by Structure: 987G 987G87011178 Minimum Vertical Clearance: 99.00m (324.80ft), Kilometerpoint: 0.000, Lanes on structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 15.0m (49.2ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb-To-Curb Width: 14.4m (47.2ft), Out-to-Out Width: 15.9m (52.2ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Very good, Operating Rating: 77.1 metric tons, Inventory Rating: 40.8 metric tons, Structural Evaluation: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.76m (2.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $268,000, Roadway Improvement Cost: $159,000, Total Project Cost: $427,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1077712, Location: .8 MI N JCT Rt. 202 & TSP (Lat: 41.303081, Lng: -73.824000), Route carried "on" structure: State highway , Year Built: 2006, Status: Open, Structure Length: 0.83m (2.72ft), Design Load: HS 25, Features Intersected: HUNTER BROOK, Facility Carried by Structure: 987G 987G87011178 Minimum Vertical Clearance: 99.00m (324.80ft), Kilometerpoint: 0.000, Lanes on structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 15.0m (49.2ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.5m (24.6ft), Curb-To-Curb Width: 14.4m (47.2ft), Out-to-Out Width: 15.9m (52.2ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Very good, Operating Rating: 78.0 metric tons, Inventory Rating: 40.8 metric tons, Structural Evaluation: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.83m (2.72ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $289,000, Roadway Improvement Cost: $172,000, Total Project Cost: $461,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 107773, Location: 0.3 MI S OF JCT US6 & TSP (Lat: 41.330000, Lng: -73.818000), Route carried "on" structure: Other road , Year Built: 2005, Status: Open, Structure Length: 0.93m (3.05ft), Average Daily Traffic: 60,795 (year 2000), Truck Traffic: 6%, Average Future Daily Traffic: 88,256 (year 2020), Design Load: HS 25, Features Intersected: SHRUB OAK CREEK, Facility Carried by Structure: 987G 987G87011198 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 44.1m (144.7ft), Skew: 27 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.5m (27.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 44.1m (144.7ft), Out-to-Out Width: 52.4m (171.9ft) Condition: Deck: Excellent, Superstructure: Very good, Substructure: Excellent, Channel: Excellent, Structural Evaluation: High priority of corrective action, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.93m (3.05ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $1,092,000, Roadway Improvement Cost: $650,000, Total Project Cost: $1,742,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 107774, Location: JCT Rts. 6 & 987G(TSP) (Lat: 41.332528, Lng: -73.817358), Route carried "on" structure: State highway , Year Built: 2006, Status: Open, Structure Length: 4.02m (13.19ft), Average Daily Traffic: 25,990 (year 1990), Truck Traffic: 6%, Average Future Daily Traffic: 37,730 (year 2010), Design Load: HS 25, Features Intersected: 6 687033047, Facility Carried by Structure: 987G 987G87011200 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 7, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 33.8m (110.9ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 39.0m (128.0ft), Curb-To-Curb Width: 30.8m (101.0ft), Out-to-Out Width: 36.0m (118.1ft) Condition: Deck: Very good, Superstructure: Excellent, Substructure: Good, Inventory Rating: 62.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.02m (13.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $1,092,000, Roadway Improvement Cost: $650,000, Total Project Cost: $1,742,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Galvanized Reinforcing Find on map >>
Structure Number: 107863, Location: .3 MI N JCT US202 AND BMP (Lat: 41.295289, Lng: -73.828889), Route carried "on" structure: City street 987H, Year Built: 1931, Status: Posted for load-capacity, Structure Length: 0.69m (2.26ft), Average Daily Traffic: 94 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 125 , Features Intersected: HUNTER BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 12.7m (41.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.3m (20.7ft), Curb-To-Curb Width: 13.5m (44.3ft), Out-to-Out Width: 14.4m (47.2ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 53.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.69m (2.26ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2006, Bridge Improvement Cost: $886,000, Roadway Improvement Cost: $528,000, Total Project Cost: $1,414,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 109144, Location: JCT RTE 129+TSP NB (Lat: 41.239925, Lng: -73.812892), Route carried "on" structure: State highway 129, Year Built: 1968, Status: Open, Structure Length: 1.92m (6.30ft), Average Daily Traffic: 3,824 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 5,354 (year 2027), Design Load: HS 20, Features Intersected: RTE 987G Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 10.031, Lanes on structure: 2, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.7m (31.8ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.2m (63.0ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 11.2m (36.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 86.2 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.92m (6.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $475,000, Roadway Improvement Cost: $283,000, Total Project Cost: $758,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 226207, Location: 4.6 MI NE CROTON ON HUDS. (Lat: 41.233958, Lng: -73.801392), Route carried "on" structure: Other road , Year Built: 1904, Status: Posted for load, Structure Length: 16.30m (53.48ft), Average Daily Traffic: 317 (year 1995), Truck Traffic: 8%, Average Future Daily Traffic: 422 (year 2015), Features Intersected: NEW CROTON RESV., Facility Carried by Structure: BET.SH 129&ARCADY Minimum Vertical Clearance: 3.75m (12.30ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Local Agency, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 1, Length of Maximum Span: 120.7m (396.0ft), Curb-To-Curb Width: 6.2m (20.3ft), Out-to-Out Width: 6.7m (22.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Channel: Good, Operating Rating: 29.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 10.9 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 16.30m (53.48ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2007, Critical Feature Inspection Date: October 2007, Underwater Inspection Date: June 2003, Bridge Improvement Cost: $2,446,000, Roadway Improvement Cost: $1,420,000, Total Project Cost: $3,866,000 ( Estimate for 2007), Deck Structure Type: Open Grating Find on map >>
Structure Number: 226243, Location: 4.5 MI SE OF PEEKSKILL (Lat: 41.259406, Lng: -73.841847), Route carried "on" structure: City street , Year Built: 1950, Status: Open, Structure Length: 2.13m (6.99ft), Average Daily Traffic: 292 (year 1995), Truck Traffic: 8%, Average Future Daily Traffic: 409 (year 2015), Features Intersected: NEW CROTON RESVOR, Facility Carried by Structure: BAPTIST CHURCH RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Local Agency, Maintenance Responsibility: Town or Township Highway Agency, Approaching Roadway Width: 5.7m (18.7ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 6.0m (19.7ft), Out-to-Out Width: 7.6m (24.9ft) Condition: Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 68.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 2.13m (6.99ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2007, Underwater Inspection Date: October 2004, Bridge Improvement Cost: $359,000, Roadway Improvement Cost: $214,000, Total Project Cost: $573,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 226244, Location: 3.0 MI E OF PEEKSKILL (Lat: 41.300511, Lng: -73.854389), Route carried "on" structure: City street , Year Built: 1920, Year Reconstructed: 1973, Status: Posted for load, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 192 (year 1995), Truck Traffic: 8%, Average Future Daily Traffic: 269 (year 2015), Features Intersected: UNNAMED BROOK, Facility Carried by Structure: SHERMAN COURT Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 4.2m (13.8ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.3m (10.8ft), Curb-To-Curb Width: 4.5m (14.8ft), Out-to-Out Width: 4.8m (15.7ft) Condition: Deck: Satisfactory, Superstructure: Serious, Substructure: Fair, Channel: Fair, Operating Rating: 23.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 13.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 0.73m (2.40ft), Designated Inspection Frequency: Every 12 months, Inspection Date: May 2007, Bridge Improvement Cost: $104,000, Roadway Improvement Cost: $62,000, Total Project Cost: $166,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 226245, Location: 5.1 MI NE OF PEEKSKILL (Lat: 41.333525, Lng: -73.842769), Route carried "on" structure: City street , Year Built: 1975, Status: Open, Structure Length: 1.15m (3.77ft), Average Daily Traffic: 4,820 (year 1995), Truck Traffic: 6%, Average Future Daily Traffic: 6,748 (year 2015), Features Intersected: SHRUB OAK BROOK, Facility Carried by Structure: MILL STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.6m (24.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.6m (34.8ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.15m (3.77ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $104,000, Roadway Improvement Cost: $62,000, Total Project Cost: $166,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 226246, Location: 1 MILE NE OF MOHEGAN LAKE (Lat: 41.334683, Lng: -73.842544), Route carried "on" structure: City street , Year Built: 1994, Status: Open, Structure Length: 1.37m (4.49ft), Average Daily Traffic: 4,803 (year 1995), Truck Traffic: 6%, Average Future Daily Traffic: 6,724 (year 2015), Design Load: HS 20, Features Intersected: PEEKSKILL HOLL CK, Facility Carried by Structure: MILL STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.1m (39.7ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.0m (32.8ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Channel: Satisfactory, Operating Rating: 91.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 66.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.37m (4.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Bridge Improvement Cost: $104,000, Roadway Improvement Cost: $62,000, Total Project Cost: $166,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 226247, Location: 5.2 MI NE OF PEEKSKILL (Lat: 41.331222, Lng: -73.839619), Route carried "on" structure: City street , Year Built: 1950, Status: Posted for load, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 43 (year 1995), Truck Traffic: 8%, Average Future Daily Traffic: 60 (year 2015), Features Intersected: SHRUB OAK LAKE, Facility Carried by Structure: NORTH RIDGE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Town or Township Highway Agency, Approaching Roadway Width: 4.2m (13.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.2m (26.9ft), Curb-To-Curb Width: 5.7m (18.7ft), Out-to-Out Width: 6.1m (20.0ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 29.9 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 16.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 0.85m (2.79ft), Designated Inspection Frequency: Every 12 months, Inspection Date: April 2007, Bridge Improvement Cost: $116,000, Roadway Improvement Cost: $69,000, Total Project Cost: $185,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 2265539, Location: 7.0 MI NE OF PEEKSKILL. (Lat: 41.328622, Lng: -73.801986), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 7,149 (year 1995), Truck Traffic: 8%, Average Future Daily Traffic: 10,009 (year 2015), Features Intersected: TRIB BARGER BROOK, Facility Carried by Structure: HILL BOULEVARD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Owner: Town or Township Highway Agency, Approaching Roadway Width: 18.2m (59.7ft), Skew: 30 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.9m (12.8ft) Condition: Channel: Poor, Culverts: Poor, Operating Rating: 74.2 metric tons, Inventory Rating: 19.5 metric tons, Structural Evaluation: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.88m (2.89ft), Designated Inspection Frequency: Every 12 months, Inspection Date: April 2007, Bridge Improvement Cost: $485,000, Roadway Improvement Cost: $291,000, Total Project Cost: $776,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 226574, Location: IN AMAWALK (Lat: 41.284433, Lng: -73.774161), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 0.60m (1.97ft), Average Daily Traffic: 3,195 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 4,473 , Features Intersected: HALLOCKS MILL BRK, Facility Carried by Structure: GREENWOOD STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 10.0m (32.8ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 2.7m (8.9ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 11.3m (37.1ft) Condition: Channel: Serious, Culverts: Fair, Operating Rating: 74.5 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.60m (1.97ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: March 2007, Underwater Inspection Date: July 2007, Bridge Improvement Cost: $152,000, Roadway Improvement Cost: $91,000, Total Project Cost: $243,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 336785, Location: IN YORKTOWN (Lat: 41.325089, Lng: -73.822917), Route carried "on" structure: City street , Year Built: 1999, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 1,000 (year 2000), Truck Traffic: 6%, Average Future Daily Traffic: 1,303 (year 2020), Features Intersected: SHRUB OAK BROOK, Facility Carried by Structure: EAST MAIN STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 2.6m (8.5ft), Curb-To-Curb Width: 7.6m (24.9ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Satisfactory, Operating Rating: 79.1 metric tons, Inventory Rating: 40.8 metric tons, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 1.01m (3.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $298,000, Roadway Improvement Cost: $178,000, Total Project Cost: $476,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 550216, Location: 0.5 MI N JCT RTS TSP+134 (Lat: 41.221300, Lng: -73.812431), Route carried "on" structure: State highway 987G, Year Built: 1972, Status: Open, Structure Length: 6.49m (21.29ft), Average Daily Traffic: 57,861 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 83,997 (year 2022), Design Load: HS 20, Features Intersected: ILLINGTON ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 177.473, Lanes on structure: 3, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 11.8m (38.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.9m (71.9ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Satisfactory, Inventory Rating: 60.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.49m (21.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $1,974,000, Roadway Improvement Cost: $1,175,000, Total Project Cost: $3,149,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete Find on map >>
Structure Number: 550217, Location: 0.8 MI N JCT RTS TSP+134 (Lat: 41.227753, Lng: -73.807506), Route carried "on" structure: Other road , Year Built: 1967, Status: Open, Structure Length: 3.32m (10.89ft), Average Daily Traffic: 77 (year 1997), Truck Traffic: 8%, Average Future Daily Traffic: 102 (year 2017), Design Load: HS 20, Features Intersected: RTE 987G, Facility Carried by Structure: ILLINGTON ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.6m (103.7ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.4m (34.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 95.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 57.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 3.32m (10.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $1,974,000, Roadway Improvement Cost: $1,175,000, Total Project Cost: $3,149,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 550218, Location: TSP(NB)S OF NEW CROT RES (Lat: 41.236167, Lng: -73.812758), Route carried "on" structure: Other road 987G, Year Built: 1930, Status: Open, Structure Length: 1.73m (5.68ft), Average Daily Traffic: 61,563 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 86,188 (year 2022), Features Intersected: CROTON DAM ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 22.035, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.4m (40.7ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 1.4m (4.6ft), Right: 1.4m (4.6ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 16.8m (55.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 55.6 metric tons, Inventory Rating: 20.6 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.73m (5.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $645,000, Roadway Improvement Cost: $384,000, Total Project Cost: $1,029,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 550219, Location: TSP(NB) AT NEW CROTON RES (Lat: 41.237631, Lng: -73.812739), Route carried "on" structure: Other road 987G, Year Built: 1931, Year Reconstructed: 1989, Status: Open, Structure Length: 29.26m (96.00ft), Average Daily Traffic: 61,563 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 86,188 (year 2022), Design Load: HS 20, Features Intersected: NEW CROTON RESRVR Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 21.897, Lanes on structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.4m (40.7ft), Material/Design: Steel, Design/Construction: Arch - Thru, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 11, Length of Maximum Span: 228.6m (750.0ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.2m (43.3ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 73.7 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 29.26m (96.00ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: November 2007, Critical Feature Inspection Date: November 2007, Underwater Inspection Date: June 2002, Bridge Improvement Cost: $8,541,000, Roadway Improvement Cost: $4,958,000, Total Project Cost: $13,499,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 55022, Location: TSP(SB) AT NEW CROTON RES (Lat: 41.238922, Lng: -73.817594), Route carried "on" structure: Other road 987G, Year Built: 1972, Status: Posted for load-capacity, Structure Length: 41.54m (136.29ft), Average Daily Traffic: 61,563 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 89,371 (year 2022), Design Load: HS 20, Features Intersected: CROTON DAM ROAD, NEW CRO Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 181.543, Lanes on structure: 3, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 13.1m (43.0ft), Material/Design: Steel, Design/Construction: Truss - Deck, Number Of Spans In Main Unit: 5, Length of Maximum Span: 121.9m (399.9ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.8m (45.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 42.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 27.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 41.54m (136.29ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2006, Critical Feature Inspection Date: October 2006, Underwater Inspection Date: October 2004, Bridge Improvement Cost: $8,541,000, Roadway Improvement Cost: $4,958,000, Total Project Cost: $13,499,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete Find on map >>
Structure Number: 550222, Location: JCT TSP&RTE 129 (Lat: 41.241003, Lng: -73.817144), Route carried "on" structure: Other road 987G, Year Built: 1972, Status: Open, Structure Length: 5.39m (17.68ft), Average Daily Traffic: 61,563 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 89,371 (year 2022), Design Load: HS 20, Features Intersected: RTE 129 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 181.592, Lanes on structure: 3, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 20.7m (67.9ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.8m (45.3ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 98.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 58.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.39m (17.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $1,651,000, Roadway Improvement Cost: $983,000, Total Project Cost: $2,634,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete Find on map >>
Structure Number: 550223, Location: 3.1 MI S JCT RTS TSP+202 (Lat: 41.253947, Lng: -73.807603), Route carried "on" structure: Other road 987G, Year Built: 1972, Status: Open, Structure Length: 1.61m (5.28ft), Average Daily Traffic: 61,563 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 86,188 (year 2022), Design Load: HS 20, Features Intersected: UNDERHILL AVENUE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.805, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.3m (46.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 12.9m (42.3ft), Out-to-Out Width: 14.7m (48.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 82.8 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.61m (5.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $527,000, Roadway Improvement Cost: $314,000, Total Project Cost: $841,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 550224, Location: 3.1 MI S JCT TSP & US 202 (Lat: 41.253761, Lng: -73.808717), Route carried "on" structure: City street , Year Built: 1951, Status: Open, Structure Length: 2.86m (9.38ft), Average Daily Traffic: 7,476 (year 1997), Truck Traffic: 6%, Average Future Daily Traffic: 9,740 (year 2017), Design Load: HS 20, Features Intersected: RTE 987G, Facility Carried by Structure: UNDERHILL AVENUE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 26.2m (86.0ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 11.3m (37.1ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 89.4 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.86m (9.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2006, Bridge Improvement Cost: $715,000, Roadway Improvement Cost: $425,000, Total Project Cost: $1,140,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 550225, Location: 2.1 MI S JCT TSP & US 202 (Lat: 41.268372, Lng: -73.807339), Route carried "on" structure: City street , Year Built: 1965, Status: Open, Structure Length: 4.35m (14.27ft), Average Daily Traffic: 2,915 (year 1997), Truck Traffic: 8%, Average Future Daily Traffic: 4,081 (year 2017), Design Load: HS 20, Features Intersected: RTE 987G, Facility Carried by Structure: BALDWIN ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 20.7m (67.9ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 8.6m (28.2ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 84.7 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.35m (14.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2006, Bridge Improvement Cost: $1,035,000, Roadway Improvement Cost: $616,000, Total Project Cost: $1,651,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 5502261, Location: 0.6 MI S JCT RTS TSP+202 (Lat: 41.283544, Lng: -73.819936), Route carried "on" structure: Other road 987G, Year Built: 1965, Year Reconstructed: 1995, Status: Open, Structure Length: 1.37m (4.49ft), Average Daily Traffic: 30,781 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 43,093 (year 2022), Design Load: HS 20, Features Intersected: FDR PARK RAMP Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 26.059, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.8m (42.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 0.4m (1.3ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 14.5m (47.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 81.7 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.37m (4.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $442,000, Roadway Improvement Cost: $263,000, Total Project Cost: $705,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 5502262, Location: 0.6 MI S JCT RTS TSP<202 (Lat: 41.283544, Lng: -73.819936), Route carried "on" structure: Other road 987G, Year Built: 1965, Status: Open, Structure Length: 1.37m (4.49ft), Average Daily Traffic: 30,781 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 43,093 (year 2022), Design Load: HS 20, Features Intersected: FDR PARK RAMP Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 26.059, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.8m (42.0ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 0.4m (1.3ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 14.6m (47.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 81.7 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.37m (4.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $443,000, Roadway Improvement Cost: $264,000, Total Project Cost: $707,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 103771, Location: 0.4 MI S JCT RTE 6+TSP (Lat: 41.327506, Lng: -73.819681), Route carried "under" structure: Other road 987G, Year Built: 2007, Structure Length: 3.84m (12.60ft), Average Daily Traffic: 6,600 (year 1978), Truck Traffic: 6%, Features Intersected: RTE 987G, Facility Carried by Structure: RTE 132 Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 31.359, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 18.0m (59.1ft) Find on map >>
Structure Number: 1037771, Location: JCT TSP & RTE 134 (Lat: 41.214511, Lng: -73.810144), Route carried "under" structure: State highway 134, Year Built: 1968, Structure Length: 1.61m (5.28ft), Average Daily Traffic: 6,266 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 134, Facility Carried by Structure: RTE 987G Minimum Vertical Clearance: 0.48m (1.57ft), Kilometerpoint: 7.112, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 16.1m (52.8ft) Find on map >>
Structure Number: 1037772, Location: JCT TSP & RTE 134 (Lat: 41.214511, Lng: -73.810144), Route carried "under" structure: State highway 134, Year Built: 1930, Structure Length: 2.07m (6.79ft), Average Daily Traffic: 6,266 (year 2006), Truck Traffic: 6%, Features Intersected: RTE 134, Facility Carried by Structure: RTE 987G Minimum Vertical Clearance: 0.48m (1.57ft), Kilometerpoint: 7.112, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 15.8m (51.8ft) Find on map >>
Structure Number: 1077691, Location: JCT TSP - US 202 & 35 (Lat: 41.292361, Lng: -73.821114), Route carried "under" structure: State highway 35, Year Built: 2003, Structure Length: 2.89m (9.48ft), Average Daily Traffic: 27,300 (year 2000), Truck Traffic: 6%, Features Intersected: RTE 35, Facility Carried by Structure: RTE 987G Minimum Vertical Clearance: 0.65m (2.13ft), Kilometerpoint: 3.283, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 28.9m (94.8ft) Find on map >>
Structure Number: 1077692, Location: JCT TSP-US 202 & 35 (Lat: 41.292403, Lng: -73.821006), Route carried "under" structure: State highway 35, Year Built: 2003, Structure Length: 2.89m (9.48ft), Average Daily Traffic: 27,300 (year 2000), Truck Traffic: 6%, Features Intersected: RTE 35, Facility Carried by Structure: RTE 987G Minimum Vertical Clearance: 0.65m (2.13ft), Kilometerpoint: 3.283, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 28.9m (94.8ft) Find on map >>
Structure Number: 107772, Location: 0.7 MI N JCT TSP & US 202 (Lat: 41.308806, Lng: -73.824250), Route carried "under" structure: Other road , Year Built: 2007, Structure Length: 4.98m (16.34ft), Features Intersected: TACONIC STATE PKW, Facility Carried by Structure: Ped Rec.Trl. Minimum Vertical Clearance: 0.00m, Kilometerpoint: 0.000, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 48.0m (157.5ft) Find on map >>
Structure Number: 107774, Location: JCT Rts. 6 & 987G(TSP) (Lat: 41.332528, Lng: -73.817358), Route carried "under" structure: US , Year Built: 2006, Structure Length: 4.02m (13.19ft), Average Daily Traffic: 3,960 (year 1990), Truck Traffic: 6%, Features Intersected: 6 687033047, Facility Carried by Structure: 987G 987G87011200 Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 0.000, Lanes on structure: 7, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft) Find on map >>
Structure Number: 109144, Location: JCT RTE 129+TSP NB (Lat: 41.239925, Lng: -73.812892), Route carried "under" structure: Other road 987G, Year Built: 1968, Structure Length: 1.92m (6.30ft), Average Daily Traffic: 57,861 (year 2002), Truck Traffic: 6%, Features Intersected: RTE 987G, Facility Carried by Structure: RTE 129 Minimum Vertical Clearance: 4.77m (15.65ft), Kilometerpoint: 20.483, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 19.2m (63.0ft) Find on map >>
Structure Number: 550217, Location: 0.8 MI N JCT RTS TSP+134 (Lat: 41.227753, Lng: -73.807506), Route carried "under" structure: Other road 987G, Year Built: 1967, Structure Length: 3.32m (10.89ft), Average Daily Traffic: 13,500 (year 1975), Truck Traffic: 6%, Features Intersected: RTE 987G, Facility Carried by Structure: ILLINGTON ROAD Minimum Vertical Clearance: 4.34m (14.24ft), Kilometerpoint: 18.986, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.6m (103.7ft) Find on map >>
Structure Number: 550222, Location: JCT TSP&RTE 129 (Lat: 41.241003, Lng: -73.817144), Route carried "under" structure: State highway 129, Year Built: 1972, Structure Length: 5.39m (17.68ft), Average Daily Traffic: 3,824 (year 2007), Truck Traffic: 6%, Features Intersected: RTE 129, Facility Carried by Structure: RTE 987G Minimum Vertical Clearance: 4.92m (16.14ft), Kilometerpoint: 9.622, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.7m (67.9ft) Find on map >>
Structure Number: 550223, Location: 3.1 MI S JCT RTS TSP+202 (Lat: 41.253947, Lng: -73.807603), Route carried "under" structure: Other road , Year Built: 1972, Structure Length: 1.61m (5.28ft), Average Daily Traffic: 1,920 (year 2007), Truck Traffic: 6%, Features Intersected: UNDERHILL AVENUE, Facility Carried by Structure: RTE 987G Minimum Vertical Clearance: 0.49m (1.61ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 14.3m (46.9ft) Find on map >>
Structure Number: 550224, Location: 3.1 MI S JCT TSP & US 202 (Lat: 41.253761, Lng: -73.808717), Route carried "under" structure: Other road 987G, Year Built: 1951, Structure Length: 2.86m (9.38ft), Average Daily Traffic: 2,640 (year 2007), Truck Traffic: 6%, Features Intersected: RTE 987G, Facility Carried by Structure: UNDERHILL AVENUE Minimum Vertical Clearance: 5.43m (17.81ft), Kilometerpoint: 22.156, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 26.2m (86.0ft) Find on map >>
Structure Number: 550225, Location: 2.1 MI S JCT TSP & US 202 (Lat: 41.268372, Lng: -73.807339), Route carried "under" structure: Other road 987G, Year Built: 1965, Structure Length: 4.35m (14.27ft), Average Daily Traffic: 2,040 (year 2007), Truck Traffic: 6%, Features Intersected: RTE 987G, Facility Carried by Structure: BALDWIN ROAD Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 23.829, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 20.7m (67.9ft) Discuss this city on our hugely popular New York forum Back to: Yorktown, NY, New York, All US cities.
|
![]() |