Welcome to City-Data.com forum! Make sure to register - it's free and very quick! You have to register before you can post and participate in our discussions with 700,000 other registered members. User profiles and some forums can only be seen by registered members. After you create your free account you will be able to customize many options, you will have the full access to over 15,000 posts/day about local topics and you will see fewer ads.

Get a detailed profile
Search Forums  (Advanced)
Business Search - 14 Million verified businesses
Search for:  near: 
Reply


 
Old 11-05-2009, 09:37 PM
Junior Member
 
Join Date: Jul 2007
Location: Tampa, FL
4 posts, read 8,419 times
Reputation: 10
noles11 is on a distinguished road
Default Peachtree Dunwoody Road Repair?

Does anyone know how much longer Peachtree Dunwoody Rd. will be out at the Nancy Creek bridge?
Reply With Quote Quick reply to this message

 
Old 11-05-2009, 09:59 PM
Member
 
Join Date: Jan 2009
36 posts, read 11,683 times
Reputation: 38
SGRLPS is on a distinguished road
On the news a couple of weeks ago they said it would be out for at least another 6 months. I don't know how accurate that timeline is, but I would plan on using the detour for quite a while.
Reply With Quote Quick reply to this message
 
Old 11-06-2009, 05:45 AM
Senior Member
 
Join Date: Aug 2007
973 posts, read 775,822 times
Reputation: 579
pinetreelover is a name known to allpinetreelover is a name known to allpinetreelover is a name known to allpinetreelover is a name known to allpinetreelover is a name known to allpinetreelover is a name known to allpinetreelover is a name known to allpinetreelover is a name known to allpinetreelover is a name known to allpinetreelover is a name known to allpinetreelover is a name known to all
Here is the statement concerning this bridge from the City of Sandy Springs website:

The Peachtree Dunwoody Road bridge will be replaced by the Georgia Department of Transportation (GDOT) using Emergency Replacement funds available from the Federal Highway Administration (FHWA). The bridge plans were advertised the morning of Monday, October 26th. GDOT will open bids on Monday, November 2nd, and if acceptable bids are received, the project will be awarded that day or the next day. A preconstruction meeting is planned at GDOT’s District 7 offices for Tuesday, November 3rd at 2:30 pm. A public information open house was hosted by Councilmember DeJulio the evening of Wednesday, October 14th at the Church of the Atonement. The current bridge plans call for 14’ wide lanes with 5-1/2’ wide sidewalks on both sides. The bridge will be lengthened to 120’. The construction is scheduled to be complete and the road open to traffic by April 2010.
Reply With Quote Quick reply to this message
 
Old 11-06-2009, 11:16 AM
Senior Member
 
Join Date: Mar 2008
Location: Atlanta, GA
195 posts, read 130,148 times
Reputation: 31
Highriser987 is on a distinguished road
I heard from a couple different sources it would take about 6months, and that was a speedy repair, otherwise it could take longer. Might as well get use to that detour route!
Reply With Quote Quick reply to this message
 
Old 11-16-2009, 03:18 PM
Junior Member
 
Join Date: Nov 2009
4 posts, read 622 times
Reputation: 14
amywenk is on a distinguished road
Default Up-to-date information about the Peachtree-Dunwoody bridge

For a full report on the status of the Peachtree-Dunwoody bridge, please read my story "Construction begins on Peachtree-Dunwoody bridge" at [url]www.Reporter[/url] Newspapers.net

I can't get the link to post right in this forum, but email me at [email]amywenk@reporternewspapers.net[/email] if you have trouble accessing the article.

Hope this helps,
Amy Wenk, staff writer
Reply With Quote Quick reply to this message
 
Old 11-16-2009, 03:34 PM
Junior Member
 
Join Date: Nov 2009
4 posts, read 622 times
Reputation: 14
amywenk is on a distinguished road
Default On second thought, i'll post the story

Construction begins on Peachtree-Dunwoody bridge

By Amy Wenk, staff writer for Reporter Newspapers


(Photo by Amy Wenk)

November 09, 2009

It will be spring before drivers can travel the Peachtree-Dunwoody bridge over Nancy Creek.

Just three days after winning the contract, crews from Massana Construction began work on the new bridge on Nov. 6.

The bridge, closed since the September flooding in metro Atlanta, is set to reopen March 24, 2010, but Massana Project Manager Aaron Jennings said his team will do "whatever we can to get it done as soon as possible" by working Mondays through Saturdays, and some Sundays.

The first order of business is to relocate gas and water mains so service to residents is not disrupted. Workers from Southeast Connections (a subcontractor for Atlanta Gas Light) were onsite Nov. 6 to relocate the gas main underneath the creek. Foreman Chad Bishop said the work could be complete in a day.

"It just depends on the ground condition," said Bishop, noting the presence of rock will delay the process. "We are hoping for the best."

Sandy Springs officials said public meetings will be held to inform residents of construction progress.

The Peachtree-Dunwoody bridge failed Sept. 22 after floodwaters washed out the middle pier of the structure. It remains closed, detouring drivers and disrupting commutes, especially for Sandy Springs, Buckhead and Brookhaven residents who frequent the residential corridor that spans all three communities.

It is costing just over $1 million to build a new bridge, and the project will be fully funded through a grant from the Federal Highway Administration.

"They fast-track everything," said Sandy Springs Director of Public Works Tom Black at a Nov. 4 meeting. "Where it would normally take us three to three-and-a-half years to permit and build that bridge, this is all going to happen in 180 days."

City officials first estimated the cost to rebuild to be around $2 million.

The new bridge will be similar to the old structure but will include 5 ½-foot-wide sidewalks on both sides, said Black. He said the bridge has 14-foot-wide car lanes each direction and "they are going to strip them in such a way that fearless bikers can have a path over the bridge."

The 120-foot-long bridge will not have a center support in the creek and will be constructed entirely of concrete. Where the bridge was perpendicular to the road, the Department of Transportation is going to improve efficiency by angling the bridge about 65 degrees. Instead of straight abutments, it will have two sets of columns.

"We think it is going to help significantly on the efficiency and cut back down on scour-type factors, because the water will now flow where it should rather than trying to turn it," Black said. "That was one of the problems … [the rain-swollen creek] undermined that center support with that volume of water."

Although there are signs posted on both ends of Peachtree-Dunwoody, Black said some motorists think they can get through. He said a tractor-trailer recently ignored the signs and got stuck by the bridge. The driver tore up some residents' lawns in the process of turning around.

John Schaffner contributed to this article
Reply With Quote Quick reply to this message
Please register to post and access all features of our very popular forum. It is free and quick.

Detailed information about all U.S. cities, counties, and zip codes on our site: City-data.com.



Reply


Quick Reply
Message:

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Similar Threads


Go Back   City-Data Forum > U.S. Forums > Georgia > Atlanta

All times are GMT -6. The time now is 11:33 AM.

Copyright © 2005-2009, Advameg, Inc.

City-Data.com - Archive 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13 - Top