Bridge Statistics for Independent Hill, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 43ft / 12.9mTotal length
  • $2,238,000Total costs
  • 27,379Total average daily traffic
  • 424Total average daily truck traffic
  • 33,935Total future (year 2035) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Independent Hill
  • No street view available for this location

New bridges in Independent Hill, VA - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11970-1979
  • 11980-1989
  • 21990-1999
  • 22000-2009
  • 22010-2019
  • 12020-2022
Average Bridge Daily Traffic in Independent Hill, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Excellent
  • 80.0%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Excellent
  • 85.7%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Excellent
  • 57.1%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
  • 20.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 2VA00FF,  Location: 1.2KM SOUTH OF SR-646 (Lat: 38.631100,  Lng: -77.496769),  Route carried "on" structure: Other road ,  Year Built: 1947,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 500 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 600 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: BRANCH OF CEDAR RUN,  Facility Carried by Structure: MCB-8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Navy/Marines,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $28,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $42,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14403,  Location: 00.45 1645 / 00.05 1434 (Lat: 38.666931,  Lng: -77.453075),  Route carried "on" structure: County highway 1435,  Year Built: 1982,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 293 (year 2010),  Average Future Daily Traffic: 337 (year 2040),  Design Load: HS 20,  Features Intersected: TRIBUTARY OF OCCOQUAN RV,  Facility Carried by Structure: WHITTING DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.637,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $50,000
Find on map >>   Show street view

Structure Number: 26059,  Location: 0.41FR MEDOW & 0.15TO631 (Lat: 38.671953,  Lng: -77.425700),  Route carried "on" structure: County highway 3166,  Year Built: 1999,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 1,548 (year 2013),  Average Future Daily Traffic: 1,757 (year 2040),  Design Load: HS 20,  Features Intersected: TRIB. OF PURCELL BRANCH,  Facility Carried by Structure: CHAMPLAIN DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 43.6m (143.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000 ( Estimate for 2016)
Find on map >>   Show street view

Structure Number: 2606,  Location: 00.10fr234/00.08toBrookm (Lat: 38.669650,  Lng: -77.436114),  Route carried "on" structure: County highway 3150,  Year Built: 1999,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,823 (year 2008),  Average Future Daily Traffic: 2,115 (year 2040),  Design Load: HS 20,  Features Intersected: PURCELL BRANCH,  Facility Carried by Structure: MEADOWGATE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000
Find on map >>   Show street view

Structure Number: 27981,  Location: 01.00FR640/0.40TO234 (Lat: 38.617333,  Lng: -77.372375),  Route carried "on" structure: Alternate County highway 643,  Year Built: 2004,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 9,674 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,544 (year 2040),  Design Load: HS 20,  Features Intersected: POWELLS CREEK,  Facility Carried by Structure: SPRIGGS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 28.6m (93.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 53.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,200,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $1,505,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 28513,  Location: 00.50FR2654/00.10TO HOLY (Lat: 38.643553,  Lng: -77.402758),  Route carried "on" structure: County highway 2662,  Year Built: 2006,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 345 (year 2013),  Average Future Daily Traffic: 392 (year 2040),  Design Load: HS 20,  Features Intersected: TRIB.OF POWELLS CREEK,  Facility Carried by Structure: PASSAGE CREEK LA.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $54,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $175,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 29569,  Location: 00.05FR0643/00.02TO0000 (Lat: 38.619953,  Lng: -77.373094),  Route carried "on" structure: County highway 3895,  Year Built: 2010,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 500 (year 2011),  Average Future Daily Traffic: 2,000 (year 2035),  Design Load: HS 20,  Features Intersected: Trib of Powells Creek,  Facility Carried by Structure: Hope Hill Ave
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 51.8m (169.9ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 30175,  Location: 0.10fr2350 0.08to1436_ (Lat: 38.632417,  Lng: -77.398000),  Route carried "on" structure: Alternate County highway 640,  Year Built: 2017,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 8,887 (year 2017),  Average Future Daily Traffic: 8,909 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: POWELLS CREEK,  Facility Carried by Structure: MINNIEVILLE ROAD
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 59.1m (193.9ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 79.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 66.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 3145,  Location: 03.60FR646/03.40TO620 (Lat: 38.587264,  Lng: -77.428553),  Route carried "on" structure: County highway 619,  Year Built: 2021,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 3,349 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,729 (year 2035),  Design Load: HL 93,  Features Intersected: SOUTH FORK QUANTICO CK.,  Facility Carried by Structure: JOPLIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.830,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 55.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $325,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 3700003P,  Location: I-95 to Exit 150 (VA Rout (Lat: 38.576442,  Lng: -77.379286),  Route carried "on" structure: Federal lands road 11,  Year Built: 1970,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 460 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 552 (year 2040),  Design Load: H 15,  Features Intersected: SOUTH FORK QUANTICO CREE,  Facility Carried by Structure: SCENIC DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.050,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $135,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete