Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Portland, Oregon (OR)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 787Number of bridges
  • 19,403ft / 5,914mTotal length
  • $795,224,000Total costs
  • 32,597,926Total average daily traffic
  • 3,065,325Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Portland
  • No street view available for this location

New bridges in Portland, OR - historical statistics
  • New bridges - historical statistics
  • 111900-1909
  • 221910-1919
  • 351920-1929
  • 261930-1939
  • 211940-1949
  • 831950-1959
  • 2461960-1969
  • 1381970-1979
  • 1011980-1989
  • 481990-1999
  • 402000-2009
  • 152010-2019
  • 12020-2022
Reconstructed bridges in Portland, OR - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31920-1929
  • 11930-1939
  • 31940-1949
  • 61950-1959
  • 41960-1969
  • 31970-1979
  • 171980-1989
  • 61990-1999
  • 52000-2009
  • 12010-2019
Average Bridge Truck Traffic in Portland, OR
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.3%Very good
  • 22.9%Good
  • 54.3%Satisfactory
  • 20.6%Fair
  • 1.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.3%Very good
  • 23.4%Good
  • 54.8%Satisfactory
  • 18.1%Fair
  • 1.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.0%Very good
  • 25.1%Good
  • 60.3%Satisfactory
  • 12.3%Fair
  • 1.3%Poor
  • 0.5%Serious
  • 0.3%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.4%Very good
  • 28.4%Good
  • 35.8%Satisfactory
  • 7.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 511,  Location: WILLAMETTE RIVER MP 12.4 (Lat: 45.523036,  Lng: -122.667556),  Route carried "on" structure: Business City street 9326,  Year Built: 1926,  Status: Posted for load,  Structure Length: 26.09m (85.60ft),  Average Daily Traffic: 58,125 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 87,161 (year 2025),  Design Load: Railroad,  Features Intersected: WILLAMETTE RIVER,  Facility Carried by Structure: BURNSIDE BRIDGE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Navigation Control: Yes ( Vertical Clearance: 19.5m (64.0ft), Horizontal Clearance: 60.0m (196.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 81.1m (266.1ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 26.10m (85.63ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $2,741,000,  Roadway Improvement Cost: $274,000,  Total Project Cost: $4,386,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 511A9326,  Location: WEST END BURNSIDE BR (Lat: 45.523097,  Lng: -122.670281),  Route carried "on" structure: City street 9326,  Year Built: 1927,  Status: Posted for load,  Structure Length: 18.84m (61.81ft),  Average Daily Traffic: 60,407 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 90,674 (year 2025),  Design Load: HS 15,  Features Intersected: WEST BURNSIDE APPROACH,  Facility Carried by Structure: BURNSIDE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Concrete,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 16,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 13.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 11.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 18.80m (61.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $5,531,000,  Roadway Improvement Cost: $553,000,  Total Project Cost: $8,850,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 511B9326,  Location: EAST END BURNSIDE BR (Lat: 45.522981,  Lng: -122.665211),  Route carried "on" structure: City street 9326,  Year Built: 1927,  Status: Posted for load,  Structure Length: 26.18m (85.89ft),  Average Daily Traffic: 58,691 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 88,033 (year 2025),  Design Load: HS 15,  Features Intersected: EAST BURNSIDE APPROACH,  Facility Carried by Structure: BURNSIDE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 11,  Owner: County Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 7,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 15.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 25.90m (84.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $7,599,000,  Roadway Improvement Cost: $760,000,  Total Project Cost: $12,158,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1185A003 004,  Location: 0.04 MI N RIVERWOOD ROAD (Lat: 45.447706,  Lng: -122.657497),  Route carried "on" structure: State highway 43,  Year Built: 1926,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 19.97m (65.52ft),  Average Daily Traffic: 13,903 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 19,900 (year 2040),  Design Load: H 15,  Features Intersected: RIVERSIDE CANYON,  Facility Carried by Structure: HWY 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 15.6m (51.2ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 11,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 2.4m (7.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1377A001 30838,  Location: AT INTERSTATE BRIDGE (Lat: 45.618039,  Lng: -122.675275),  Route carried "on" structure: Interstate 5,  Year Built: 1916,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 107.84m (353.81ft),  Average Daily Traffic: 57,550 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 90,050 (year 2040),  Design Load: H 15,  Features Intersected: COLUMBIA RIVER
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 496.290,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Navigation Control: Yes ( Vertical Clearance: 4.3m (14.1ft), Horizontal Clearance: 80.2m (263.1ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 16,  Length of Maximum Span: 85.0m (278.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 107.80m (353.67ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2020,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $16,622,000,  Roadway Improvement Cost: $1,662,000,  Total Project Cost: $26,595,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1377C01EX00441,  Location: 1.6 MI S OF I-5 JCT (Lat: 45.586533,  Lng: -122.664161),  Route carried "on" structure: State highway 99,  Year Built: 1934,  Year Reconstructed: 1954,  Status: Open,  Structure Length: 9.36m (30.71ft),  Average Daily Traffic: 16,300 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 27,400 (year 2040),  Design Load: H 15,  Features Intersected: Columbia Slough,  Facility Carried by Structure: Hwy 081
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.113,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 14.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 11.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Critical Feature Inspection Date: January 2021,  Underwater Inspection Date: Febuary 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1726 120 00038,  Location: 5.5 MI NW PORTLAND CC (Lat: 45.600381,  Lng: -122.719511),  Route carried "on" structure: State highway 120,  Year Built: 1933,  Status: Posted for load,  Structure Length: 10.30m (33.79ft),  Average Daily Traffic: 12,185 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 24,500 (year 2040),  Design Load: H 15,  Features Intersected: Columbia Slough
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.612,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 11,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 17.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Critical Feature Inspection Date: January 2021,  Bridge Improvement Cost: $1,082,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,732,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1740 02W 01319,  Location: 6.3 MI W ST JOHNS BR (Lat: 45.651400,  Lng: -122.851111),  Route carried "on" structure: US 30,  Year Built: 1968,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 19,969 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 29,300 (year 2040),  Design Load: HS 20,  Features Intersected: McCarty Creek,  Facility Carried by Structure: Hwy 092
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.227,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.7m (84.3ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 25.7m (84.3ft),  Out-to-Out Width: 26.6m (87.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1983 01W 00325,  Location: 2.0 MI N OF SW 26TH AVE (Lat: 45.479733,  Lng: -122.680211),  Route carried "on" structure: State highway 99,  Year Built: 1934,  Status: Open,  Structure Length: 11.49m (37.70ft),  Average Daily Traffic: 13,347 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 23,100 (year 2040),  Design Load: H 15,  Features Intersected: SW NEWBURY ST VIADUCT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.230,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 15.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 11.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 11.50m (37.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,207,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,932,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1984 01W 0035,  Location: 0.3 M S OF HWY 40 (Lat: 45.476131,  Lng: -122.679639),  Route carried "on" structure: State highway 99,  Year Built: 1934,  Status: Open,  Structure Length: 16.18m (53.08ft),  Average Daily Traffic: 16,366 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 28,000 (year 2040),  Design Load: H 15,  Features Intersected: SW VERMONT ST VIADUCT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.633,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 23 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 18,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.80m (58.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,870,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $2,992,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1994 068 00224,  Location: 5.0 MI E OF PORT CENTER (Lat: 45.533900,  Lng: -122.578969),  Route carried "on" structure: State highway 213,  Year Built: 1934,  Year Reconstructed: 1954,  Status: Posted for load,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 23,696 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 33,500 (year 2040),  Design Load: H 15,  Features Intersected: UPRR and TriMet
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.605,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 22 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 35.7m (117.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $371,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $594,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 2008A01E 00443,  Location: 0.2 MI N MILWAUKIE CC (Lat: 45.463861,  Lng: -122.638436),  Route carried "on" structure: State highway 99,  Year Built: 1991,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 43,859 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 56,200 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Johnson Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.129,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.1m (102.0ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 31.1m (102.0ft),  Out-to-Out Width: 37.1m (121.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2010 01W 00486,  Location: 1.7 MI S OF HWY 40 (Lat: 45.465067,  Lng: -122.698792),  Route carried "on" structure: State highway 99,  Year Built: 1935,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 20,355 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 30,100 (year 2040),  Design Load: H 15,  Features Intersected: SW MULTNOMAH BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.821,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $583,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $932,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2014A02W 01123,  Location: 4.3 MI W ST JOHNS BR (Lat: 45.630600,  Lng: -122.823700),  Route carried "on" structure: US 30,  Year Built: 1968,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 19,952 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 29,300 (year 2040),  Design Load: HS 20,  Features Intersected: PNWR,  Facility Carried by Structure: Hwy 092
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.073,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 138.4m (454.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 19.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2097 01E 00159,  Location: 1.5 MI SE PORTLAND CC (Lat: 45.500000,  Lng: -122.660300),  Route carried "on" structure: State highway 99,  Year Built: 1937,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 31.61m (103.71ft),  Average Daily Traffic: 64,338 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 81,500 (year 2040),  Design Load: H 15,  Features Intersected: Grand Ave,  Facility Carried by Structure: Hwy 081
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.559,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.3m (99.4ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 27,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 20.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2163A002 00673,  Location: 3.0 MI E OF NE 60TH AVE (Lat: 45.545617,  Lng: -122.557842),  Route carried "on" structure: City street ,  Year Built: 1936,  Year Reconstructed: 1962,  Status: Open,  Structure Length: 19.78m (64.90ft),  Average Daily Traffic: 45,910 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 55,600 (year 2040),  Design Load: H 15,  Features Intersected: Hwy 002,  Facility Carried by Structure: 102nd Ave
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.831,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 11,  Length of Maximum Span: 37.2m (122.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 19.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.80m (64.96ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $4,463,000,  Roadway Improvement Cost: $446,000,  Total Project Cost: $7,141,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2237A01E 00262,  Location: 3.0 MI SE PORTLAND CC (Lat: 45.487308,  Lng: -122.650336),  Route carried "on" structure: Business City street 99,  Year Built: 1968,  Status: Open,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 49,500 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 54,300 (year 2038),  Design Load: HS 20,  Features Intersected: Hwy 081,  Facility Carried by Structure: Milwaukie Ave
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 56.4m (185.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 27.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2350A01EX0002,  Location: 0.1 MI E PORTLAND CC (Lat: 45.525728,  Lng: -122.661717),  Route carried "on" structure: State highway 99,  Year Built: 1908,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 14.14m (46.39ft),  Average Daily Traffic: 35,800 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 39,900 (year 2038),  Design Load: H 15,  Features Intersected: Hwy 2 & UPRR,  Facility Carried by Structure: NE MLK BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 11,  Number Of Approach Spans: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 3.5m (11.5ft),  Right: 3.5m (11.5ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.10m (46.26ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $3,861,000,  Roadway Improvement Cost: $386,000,  Total Project Cost: $6,177,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2484 000 00014,  Location: 1 BLOCK N OF DEKUM ST (Lat: 45.572861,  Lng: -122.630669),  Route carried "on" structure: City street 9823,  Year Built: 1929,  Year Reconstructed: 1938,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 10,762 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 14,257 (year 2025),  Design Load: HS 20,  Features Intersected: B-9 OVER UPRR,  Facility Carried by Structure: NE 33RD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 31 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 12,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Critical,  Operating Rating: 5.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 4.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $881,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,409,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 2484A000 00014,  Location: 1 BLOCK N OF DEKUM ST (Lat: 45.573419,  Lng: -122.629803),  Route carried "on" structure: Ramp City street 9823,  Year Built: 1967,  Status: Open,  Structure Length: 16.15m (52.99ft),  Average Daily Traffic: 5,161 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 5,692 (year 2025),  Design Load: HS 20,  Features Intersected: B-9A X NE COLUMBIA BLVD,  Facility Carried by Structure: NE 33RD AVE RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 1,  Lanes under structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 12,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 16.20m (53.15ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $1,210,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,936,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2485 000 00219,  Location: NE PORTLAND (Lat: 45.570319,  Lng: -122.618911),  Route carried "on" structure: County highway ,  Year Built: 1938,  Status: Open,  Structure Length: 9.11m (29.89ft),  Average Daily Traffic: 8,234 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,081 (year 2025),  Design Load: H 15,  Features Intersected: B-75 X LOMBARD AND UPRR,  Facility Carried by Structure: NE 42ND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.524,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 21.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.10m (29.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,169,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,871,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2529 061 00332,  Location: FREMONT BRIDGE (Lat: 45.538139,  Lng: -122.683100),  Route carried "on" structure: Interstate 405,  Year Built: 1973,  Status: Open,  Structure Length: 65.65m (215.39ft),  Average Daily Traffic: 101,643 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 150,900 (year 2040),  Design Load: HS 20,  Features Intersected: Willamette River,  Facility Carried by Structure: HWY 061
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 5.343,  Lanes on structure: 8,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 41.5m (136.2ft),  Navigation Control: Yes ( Vertical Clearance: 53.3m (174.9ft), Horizontal Clearance: 298.7m (980.0ft)),  Material/Design: Steel continuous,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 382.5m (1,254.9ft),  Curb-To-Curb Width: 41.5m (136.2ft),  Out-to-Out Width: 45.7m (149.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 15.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 11.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 65.70m (215.55ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $32,056,000,  Roadway Improvement Cost: $3,206,000,  Total Project Cost: $51,289,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2641A02W 01077,  Location: 3.8 MI W OF ST JOHNS BR (Lat: 45.626675,  Lng: -122.818611),  Route carried "on" structure: US 30,  Year Built: 1949,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 13.02m (42.72ft),  Average Daily Traffic: 9,976 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,650 (year 2040),  Design Load: HS 20,  Features Intersected: Partial Viaduct,  Facility Carried by Structure: Hwy 092
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.333,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 2.4m (7.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 20.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2733B01WX00052,  Location: AT WEST END OF STEEL BR (Lat: 45.525772,  Lng: -122.670714),  Route carried "on" structure: Ramp State highway 99,  Year Built: 1950,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 3,920 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,239 (year 2030),  Design Load: H 15,  Features Intersected: FRONT AVENUE,  Facility Carried by Structure: HWY 1W/EVERETT RMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.390,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.4m (60.4ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 16.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.20m (23.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $734,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $1,174,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 2733C01WX00014,  Location: AT W END OF STEEL BRIDGE (Lat: 45.526192,  Lng: -122.670675),  Route carried "on" structure: State highway 99,  Year Built: 1950,  Status: Open,  Structure Length: 17.12m (56.17ft),  Average Daily Traffic: 5,181 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,300 (year 2040),  Design Load: H 15,  Features Intersected: FRONT AVE TO STEEL BR,  Facility Carried by Structure: HWY 1W NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Number Of Approach Spans: 1,  Length of Maximum Span: 27.8m (91.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.70m (54.79ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Critical Feature Inspection Date: November 2020,  Bridge Improvement Cost: $1,755,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $2,808,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 2757,  Location: WILLAMETTE RIVER MP 13.2 (Lat: 45.513211,  Lng: -122.670950),  Route carried "on" structure: City street 9366,  Year Built: 1910,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 42.15m (138.29ft),  Average Daily Traffic: 32,243 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 35,560 (year 2025),  Design Load: Railroad,  Features Intersected: WILLAMETTE RIVER,  Facility Carried by Structure: HAWTHORNE AVE
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 33.5m (109.9ft), Horizontal Clearance: 73.2m (240.2ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 76.5m (251.0ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 42.20m (138.45ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $4,429,000,  Roadway Improvement Cost: $443,000,  Total Project Cost: $7,086,000,  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 2757A,  Location: BETWEEN SE WATER & GRAND (Lat: 45.512014,  Lng: -122.662275),  Route carried "on" structure: City street 9366,  Year Built: 1957,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 37.80m (124.02ft),  Average Daily Traffic: 12,852 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 19,363 (year 2025),  Design Load: HS 20,  Features Intersected: OR 99E (01E),  Facility Carried by Structure: RAMP TO HAWTHORNE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: County Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 22,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2757B,  Location: WILAMETTE RV MP13.2 (Lat: 45.512942,  Lng: -122.664539),  Route carried "on" structure: City street 9366,  Year Built: 1957,  Status: Open,  Structure Length: 39.62m (129.99ft),  Average Daily Traffic: 16,730 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 18,451 (year 2025),  Design Load: HS 20,  Features Intersected: GRAND AV TO WATER AV WB,  Facility Carried by Structure: MADISON ST
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: County Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 20,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 26.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2757D,  Location: WILLAMETTE RIVER MO 13.2 (Lat: 45.514000,  Lng: -122.673869),  Route carried "on" structure: City street 9366,  Year Built: 1958,  Status: Open,  Structure Length: 9.60m (31.50ft),  Average Daily Traffic: 32,566 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 35,916 (year 2025),  Features Intersected: WILLAMETTE RIVER,  Facility Carried by Structure: HAWTHORNE BR. W.A.
Minimum Vertical Clearance: 3.05m (10.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Number Of Approach Spans: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 10.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 7.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.10m (33.14ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: March 2021,  Bridge Improvement Cost: $2,789,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $4,462,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2757F,  Location: WILLAMETTE RIV MP 13.2 (Lat: 45.512400,  Lng: -122.666900),  Route carried "on" structure: City street 9366,  Year Built: 1992,  Status: Open,  Structure Length: 16.73m (54.89ft),  Average Daily Traffic: 27,012 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 27,587 (year 2025),  Design Load: HS 25 or greater,  Features Intersected: WATER AVE TO THE RIVER,  Facility Carried by Structure: HAWTHORNE BRIDGE
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2758,  Location: WILLAMETTE RIVER MP 12.8 (Lat: 45.517731,  Lng: -122.669289),  Route carried "on" structure: Business City street 9350,  Year Built: 1958,  Status: Open,  Structure Length: 23.16m (75.98ft),  Average Daily Traffic: 55,335 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 82,867 (year 2025),  Design Load: HS 20,  Features Intersected: WILLAMETTE RIVER,  Facility Carried by Structure: MORRISON ST
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Owner: County Highway Agency,  Approaching Roadway Width: 20.9m (68.6ft),  Navigation Control: Yes ( Vertical Clearance: 21.0m (68.9ft), Horizontal Clearance: 57.9m (190.0ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 86.9m (285.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 4.4m (14.4ft),  Curb-To-Curb Width: 20.9m (68.6ft),  Out-to-Out Width: 27.4m (89.9ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 19.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: March 2021,  Underwater Inspection Date: September 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2758A935,  Location: EAST END MORRISON BR (Lat: 45.516519,  Lng: -122.663936),  Route carried "on" structure: City street 9350,  Year Built: 1958,  Status: Posted for load,  Structure Length: 52.82m (173.29ft),  Average Daily Traffic: 31,139 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 34,342 (year 2025),  Design Load: HS 20,  Features Intersected: OR 99E (HWY 001E),  Facility Carried by Structure: BELMONT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 15,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 27,  Length of Maximum Span: 38.7m (127.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 11.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 8.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 52.50m (172.24ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $8,231,000,  Roadway Improvement Cost: $823,000,  Total Project Cost: $13,169,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 2758B9326,  Location: WEST END MORRISON BR (Lat: 45.518414,  Lng: -122.671964),  Route carried "on" structure: City street 9326,  Year Built: 1958,  Status: Open,  Structure Length: 37.12m (121.78ft),  Average Daily Traffic: 57,504 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 86,206 (year 2025),  Design Load: HS 20,  Features Intersected: CITY STREETS & PARK,  Facility Carried by Structure: WEST MORRISON CONN
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 23,  Length of Maximum Span: 33.8m (110.9ft),  Curb or Sidewalk Widths: Left: 4.6m (15.1ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 24.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 19.40m (63.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $5,300,000,  Roadway Improvement Cost: $530,000,  Total Project Cost: $8,480,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 4516A001 30793,  Location: 0.5 MI S OF INTERSTATE BR (Lat: 45.612000,  Lng: -122.678900),  Route carried "on" structure: Interstate 5,  Year Built: 1916,  Status: Temporarily open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 115,100 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 180,100 (year 2040),  Design Load: H 15,  Features Intersected: Jantzen Ped Tunnel
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 495.565,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 48.8m (160.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 48.8m (160.1ft),  Out-to-Out Width: 72.9m (239.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 10.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 8.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $121,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $193,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Portland, Oregon (OR) on our hugely popular Oregon forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.