Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Attalla, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 31Number of bridges
  • 614ft / 187mTotal length
  • $61,676,000Total costs
  • 333,112Total average daily traffic
  • 58,761Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Attalla
  • No street view available for this location

New bridges in Attalla, AL - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 11940-1949
  • 51950-1959
  • 71960-1969
  • 11980-1989
  • 111990-1999
  • 32000-2009
Average Bridge Daily Traffic in Attalla, AL
Average Bridge Truck Traffic in Attalla, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.3%Excellent
  • 4.3%Very good
  • 30.4%Good
  • 43.5%Satisfactory
  • 17.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.3%Excellent
  • 34.8%Good
  • 21.7%Satisfactory
  • 39.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.0%Very good
  • 26.1%Good
  • 39.1%Satisfactory
  • 21.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.0%Excellent
  • 5.0%Very good
  • 20.0%Good
  • 60.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Excellent
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 1383,  Location: .1 MI. SO.I-59 (Lat: 34.019200,  Lng: -86.073300),  Route carried "on" structure: US 431,  Year Built: 1963,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 14,494 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 20,992 (year 2039),  Design Load: HS 20,  Features Intersected: LITTLE WILLS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 426.833,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.8m (61.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,885,000,  Roadway Improvement Cost: $389,000,  Total Project Cost: $4,274,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2732,  Location: 0.3 MILE SOUTH OF HWY 11 (Lat: 33.992783,  Lng: -86.123869),  Route carried "on" structure: County highway 119,  Year Built: 1942,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 1,170 (year 2003),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,743 (year 2034),  Features Intersected: TRIB. TO BIG WILLS CREEK,  Facility Carried by Structure: PLEASANT VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.2m (30.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $318,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $350,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5386,  Location: US 431 * BIG WILLS CREEK (Lat: 34.033225,  Lng: -86.110622),  Route carried "on" structure: US 431,  Year Built: 1927,  Year Reconstructed: 1956,  Status: Open,  Structure Length: 9.42m (30.91ft),  Average Daily Traffic: 11,748 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,447 (year 2039),  Design Load: HS 20,  Features Intersected: BIG WILLS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 431.465,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.38m (34.06ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $2,134,000,  Roadway Improvement Cost: $213,000,  Total Project Cost: $2,347,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5387,  Location: .1 MI. SO.US 278 (Lat: 34.035561,  Lng: -86.111364),  Route carried "on" structure: US 431,  Year Built: 1927,  Year Reconstructed: 1956,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 11,748 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,447 (year 2039),  Design Load: H 15,  Features Intersected: LINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 431.707,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.53m (11.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $825,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5432,  Location: US 431 * BIG WILLS CREEK (Lat: 34.033269,  Lng: -86.110456),  Route carried "on" structure: US 431,  Year Built: 1956,  Status: Open,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 11,784 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,447 (year 2039),  Design Load: HS 20,  Features Intersected: BIG WILLS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 431.465,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 9,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.63m (38.16ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $2,392,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $2,631,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5433,  Location: .1 MI. SO. US 278 (Lat: 34.035539,  Lng: -86.111200),  Route carried "on" structure: US 431,  Year Built: 1956,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 7,693 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,771 (year 2039),  Design Load: HS 20,  Features Intersected: LINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 431.707,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 48.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.49m (11.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $718,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $790,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5434,  Location: 1 MI NO. US 278 (Lat: 34.046850,  Lng: -86.111289),  Route carried "on" structure: US 431,  Year Built: 1956,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 11,748 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,447 (year 2040),  Design Load: HS 20,  Features Intersected: LINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 433.303,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: July 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,403,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $1,543,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5435,  Location: 1 MI. NO .US 278 (Lat: 34.046794,  Lng: -86.111122),  Route carried "on" structure: US 431,  Year Built: 1956,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 11,748 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,447 (year 2040),  Design Load: HS 20,  Features Intersected: LINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 433.303,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: July 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,276,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,404,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7544,  Location: 3.1 MI N ST CLAIR CO LN (Lat: 33.968892,  Lng: -86.119497),  Route carried "on" structure: County highway ,  Year Built: 1962,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 1,323 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,852 (year 2040),  Design Load: H 20,  Features Intersected: I 59,  Facility Carried by Structure: PLEASANT VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 178.629,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.40m (34.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,854,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $2,039,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7546,  Location: I 59 * BIG WILLS CK (Lat: 34.011258,  Lng: -86.075514),  Route carried "on" structure: Interstate 59,  Year Built: 1962,  Status: Open,  Structure Length: 18.35m (60.20ft),  Average Daily Traffic: 14,268 (year 2018),  Truck Traffic: 25%,  Average Future Daily Traffic: 19,975 (year 2038),  Design Load: H 20,  Features Intersected: BIG WILLS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 293.461,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 13,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 19.01m (62.37ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $3,910,000,  Roadway Improvement Cost: $391,000,  Total Project Cost: $4,301,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7766,  Location: AL 77 * CLEAR CREEK (Lat: 34.032956,  Lng: -86.118911),  Route carried "on" structure: State highway 77,  Year Built: 1962,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 9,488 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 13,283 (year 2040),  Design Load: HS 20,  Features Intersected: CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 179.133,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,494,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $1,643,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7856,  Location: I 59 * N/S RR (Lat: 34.018333,  Lng: -86.073333),  Route carried "on" structure: Ramp Interstate 59,  Year Built: 1963,  Status: Open,  Structure Length: 12.86m (42.19ft),  Average Daily Traffic: 1,991 (year 2018),  Truck Traffic: 35%,  Average Future Daily Traffic: 2,787 (year 2038),  Design Load: HS 20,  Features Intersected: N/S RR,  Facility Carried by Structure: RAMP TO US 431
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 294.695,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 7,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 13.69m (44.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,158,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $2,374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7859,  Location: I 59 * N/S RR (Lat: 34.018333,  Lng: -86.073333),  Route carried "on" structure: Ramp Interstate 59,  Year Built: 1963,  Status: Open,  Structure Length: 15.00m (49.21ft),  Average Daily Traffic: 3,024 (year 2018),  Truck Traffic: 35%,  Average Future Daily Traffic: 4,234 (year 2038),  Design Load: H 20,  Features Intersected: LITTLE WILLS CK * N/S RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 294.695,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 9,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 15.77m (51.74ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,488,000,  Roadway Improvement Cost: $249,000,  Total Project Cost: $2,737,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7903,  Location: CLEVELAND AVE (Lat: 34.018333,  Lng: -86.073333),  Route carried "on" structure: City street ,  Year Built: 1936,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 9,878 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 16,188 (year 2040),  Design Load: H 20,  Features Intersected: LITTLE WILLS CREEK,  Facility Carried by Structure: US 431 SPUR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.6m (64.3ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.01m (16.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,439,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $2,683,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15465,  Location: 0.8 MILES N ATTALLACTY LN (Lat: 34.000000,  Lng: -86.110000),  Route carried "on" structure: State highway 77,  Year Built: 1991,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 16,015 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 22,421 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 175.031,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.76m (9.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,243,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,367,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15509,  Location: I 59 * ATN RR/US 431 (Lat: 34.018947,  Lng: -86.074594),  Route carried "on" structure: Interstate 59,  Year Built: 1992,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 14,267 (year 2018),  Truck Traffic: 25%,  Average Future Daily Traffic: 19,974 (year 2038),  Design Load: HS 20,  Features Intersected: US 431
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 294.573,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.53m (24.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,375,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $2,613,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15763,  Location: I-59 * N/S RR (Lat: 34.018333,  Lng: -86.073333),  Route carried "on" structure: Interstate 59,  Year Built: 1993,  Status: Open,  Structure Length: 13.72m (45.01ft),  Average Daily Traffic: 14,268 (year 2018),  Truck Traffic: 25%,  Average Future Daily Traffic: 19,975 (year 2038),  Design Load: HS 20,  Features Intersected: LITTLE WILLS CR, N/S RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 294.695,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 4,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.52m (47.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $4,581,000,  Roadway Improvement Cost: $458,000,  Total Project Cost: $5,039,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15764,  Location: I-59 * N/S RR (Lat: 34.018333,  Lng: -86.073333),  Route carried "on" structure: Interstate 59,  Year Built: 1993,  Status: Open,  Structure Length: 13.72m (45.01ft),  Average Daily Traffic: 26,739 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 37,435 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE WILLS CK * N/S RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 294.695,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.52m (47.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $4,581,000,  Roadway Improvement Cost: $458,000,  Total Project Cost: $5,039,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15791,  Location: ATTALLA (Lat: 34.018942,  Lng: -86.074800),  Route carried "on" structure: Interstate 59,  Year Built: 1993,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 14,267 (year 2018),  Truck Traffic: 25%,  Average Future Daily Traffic: 19,974 (year 2038),  Design Load: HS 20,  Features Intersected: US 431 * ATN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 294.573,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.53m (24.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,375,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $2,613,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15891,  Location: I-59 * CLEVELAND AVE. (Lat: 34.018108,  Lng: -86.074469),  Route carried "on" structure: Interstate 59,  Year Built: 1994,  Status: Open,  Structure Length: 6.09m (19.98ft),  Average Daily Traffic: 14,268 (year 2018),  Truck Traffic: 25%,  Average Future Daily Traffic: 19,975 (year 2038),  Design Load: HS 20,  Features Intersected: CLEVELAND AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 294.478,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 60.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.13m (23.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,250,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $2,475,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16015,  Location: I 59 OVER CLEVELAND AVE. (Lat: 34.018103,  Lng: -86.074700),  Route carried "on" structure: Interstate 59,  Year Built: 1994,  Status: Open,  Structure Length: 6.09m (19.98ft),  Average Daily Traffic: 14,268 (year 2018),  Truck Traffic: 25%,  Average Future Daily Traffic: 19,975 (year 2038),  Design Load: HS 20,  Features Intersected: CLEVELAND AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 294.478,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 60.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.13m (23.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,250,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $2,475,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17892,  Location: US 11 @ ATTALLA (Lat: 34.006003,  Lng: -86.111139),  Route carried "on" structure: US 11,  Year Built: 2000,  Status: Open,  Structure Length: 12.86m (42.19ft),  Average Daily Traffic: 6,037 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,452 (year 2038),  Design Load: HS 20,  Features Intersected: BIG WILLS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 306.762,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 23.4m (76.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.9m (9.5ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.4m (76.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.69m (44.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $7,134,000,  Roadway Improvement Cost: $713,000,  Total Project Cost: $7,847,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18837,  Location: @ MILLERS HOLLOW ROAD (Lat: 34.001667,  Lng: -86.135000),  Route carried "on" structure: County highway 110,  Year Built: 2007,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 585 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 837 (year 2034),  Design Load: HS 20,  Features Intersected: MILLER CREEK,  Facility Carried by Structure: CLANTON ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $355,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $391,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18845,  Location: LAKE RHEA RD. (Lat: 34.018750,  Lng: -86.113278),  Route carried "on" structure: County highway 404,  Year Built: 2007,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 700 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 750 (year 2032),  Design Load: HS 20,  Features Intersected: BIG WILLS CREEK,  Facility Carried by Structure: LAKE RHEA RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,544,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $1,698,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19857,  Location: @ MILLERS HOLLOW RD (Lat: 34.005144,  Lng: -86.137072),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 50 (year 2003),  Average Future Daily Traffic: 51 (year 2034),  Features Intersected: MILLER CREEK,  Facility Carried by Structure: PONDEROSA RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.3m (20.7ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 24.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.39m (4.56ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $178,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 5431,  Location: ATTALLA UNDERPASS (Lat: 34.021667,  Lng: -86.088333),  Route carried "under" structure: Other road 431,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 20,072 (year 2019),  Truck Traffic: 6%,  Features Intersected: US 431,  Facility Carried by Structure: SOUTHERN RR
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 428.086,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 7544,  Location: 3.1 MI N ST CLAIR CO LN (Lat: 33.968892,  Lng: -86.119497),  Route carried "under" structure: Interstate 59,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 22,715 (year 2020),  Truck Traffic: 28%,  Features Intersected: I 59,  Facility Carried by Structure: PLEASANT VALLEY RD
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 287.400,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 15509,  Location: I 59 * ATN RR/US 431 (Lat: 34.018947,  Lng: -86.074594),  Route carried "under" structure: US 431,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 15,018 (year 2018),  Truck Traffic: 12%,  Features Intersected: US 431,  Facility Carried by Structure: I 59
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 412.476,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 15791,  Location: ATTALLA (Lat: 34.018942,  Lng: -86.074800),  Route carried "under" structure: US 431,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 15,018 (year 2018),  Truck Traffic: 12%,  Features Intersected: US 431 * ATN RR,  Facility Carried by Structure: I-59
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 426.959,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 15891,  Location: I-59 * CLEVELAND AVE. (Lat: 34.018108,  Lng: -86.074469),  Route carried "under" structure: Alternate US ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 8,360 (year 2018),  Truck Traffic: 23%,  Features Intersected: CLEVELAND AVE.,  Facility Carried by Structure: I-59
Minimum Vertical Clearance: 7.41m (24.31ft),  Kilometerpoint: 182.459,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.4m (99.7ft)

Find on map >>   Show street view

Structure Number: 16015,  Location: I 59 OVER CLEVELAND AVE. (Lat: 34.018103,  Lng: -86.074700),  Route carried "under" structure: Alternate City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 8,360 (year 2018),  Truck Traffic: 23%,  Features Intersected: CLEVELAND AVE.,  Facility Carried by Structure: I 59
Minimum Vertical Clearance: 7.41m (24.31ft),  Kilometerpoint: 182.459,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.4m (99.7ft)

Discuss Attalla, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.