Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Blaine, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 26Number of bridges
  • 364ft / 111mTotal length
  • $59,809,000Total costs
  • 177,523Total average daily traffic
  • 14,682Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Blaine
  • No street view available for this location

New bridges in Blaine, WA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 11950-1959
  • 151960-1969
  • 21970-1979
  • 11990-1999
  • 52000-2009
Reconstructed bridges in Blaine, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
  • 01990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Blaine, WA
Average Bridge Truck Traffic in Blaine, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 23.5%Very good
  • 41.2%Good
  • 29.4%Satisfactory
  • 5.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 17.6%Very good
  • 47.1%Good
  • 17.6%Satisfactory
  • 17.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.8%Very good
  • 64.7%Good
  • 17.6%Satisfactory
  • 5.9%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 85.7%Very good
  • 14.3%Good
Find on map >>   Show street view

Structure Number: 6570A,  Location: 7.9 N JCT SR 548 (Lat: 48.971722,  Lng: -122.719194),  Route carried "on" structure: Interstate 5,  Year Built: 1961,  Status: Open,  Structure Length: 11.98m (39.30ft),  Average Daily Traffic: 13,494 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 19,377 (year 2039),  Design Load: HS 20,  Features Intersected: DAKOTA CR & WEST RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 440.735,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.98m (39.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,301,000,  Roadway Improvement Cost: $660,000,  Total Project Cost: $6,602,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6570B,  Location: 7.9 N JCT SR 548 (Lat: 48.971611,  Lng: -122.719389),  Route carried "on" structure: Interstate 5,  Year Built: 1961,  Status: Open,  Structure Length: 11.98m (39.30ft),  Average Daily Traffic: 13,494 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 19,377 (year 2039),  Design Load: HS 20,  Features Intersected: DAKOTA CR & WEST RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 440.735,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.98m (39.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,301,000,  Roadway Improvement Cost: $660,000,  Total Project Cost: $6,602,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6851A,  Location: 0.4 N JCT SR 543 (Lat: 48.990000,  Lng: -122.741667),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 5,000 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,870 (year 2036),  Design Load: HS 20,  Features Intersected: I-5,  Facility Carried by Structure: MITCHELL AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.24m (30.31ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,697,000,  Roadway Improvement Cost: $339,000,  Total Project Cost: $3,394,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6851B,  Location: 0.7 N JCT SR 543 (Lat: 48.994028,  Lng: -122.746056),  Route carried "on" structure: State highway ,  Year Built: 1962,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 1,984 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,126 (year 2040),  Design Load: HS 20,  Features Intersected: I-5,  Facility Carried by Structure: H ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.008,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 23.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.69m (28.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,824,000,  Roadway Improvement Cost: $365,000,  Total Project Cost: $3,648,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6926E,  Location: 8.2 N JCT SR 548 (Lat: 48.975250,  Lng: -122.723111),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1962,  Status: Open,  Structure Length: 7.47m (24.51ft),  Average Daily Traffic: 2,509 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,602 (year 2039),  Design Load: HS 20,  Features Intersected: N-W RAMP I-5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.47m (24.51ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Bridge Improvement Cost: $1,323,000,  Roadway Improvement Cost: $265,000,  Total Project Cost: $2,646,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7057A,  Location: 8.5 N JCT SR 548 (Lat: 48.979222,  Lng: -122.729083),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 1,800 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,208 (year 2036),  Design Load: HS 20,  Features Intersected: I-5,  Facility Carried by Structure: HUGHES AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.78m (28.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Bridge Improvement Cost: $1,843,000,  Roadway Improvement Cost: $369,000,  Total Project Cost: $3,686,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7057B,  Location: JCT SR 548 (Lat: 48.997697,  Lng: -122.751778),  Route carried "on" structure: Interstate 5,  Year Built: 1963,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 3,541 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,084 (year 2039),  Design Load: HS 20,  Features Intersected: SR 548 (D ST)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 444.501,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.82m (15.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Bridge Improvement Cost: $1,327,000,  Roadway Improvement Cost: $265,000,  Total Project Cost: $2,654,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7057C,  Location: JCT SR 548 (Lat: 48.997417,  Lng: -122.752028),  Route carried "on" structure: Interstate 5,  Year Built: 1963,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 3,541 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,084 (year 2039),  Design Load: HS 20,  Features Intersected: SR 548 (D ST)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 444.501,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.97m (16.31ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Bridge Improvement Cost: $1,402,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $2,804,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8934A,  Location: JCT I-5 (Lat: 48.987139,  Lng: -122.735750),  Route carried "on" structure: State highway 543,  Year Built: 1971,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 5,384 (year 2019),  Truck Traffic: 27%,  Average Future Daily Traffic: 7,731 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: I-5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Bridge Improvement Cost: $1,411,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $2,822,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 17064A,  Location: 0.8 N JCT I-5 (Lat: 48.998167,  Lng: -122.734833),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 6,423 (year 2008),  Truck Traffic: 5%,  Design Load: HL 93,  Features Intersected: SR 543 NORTHBOUND,  Facility Carried by Structure: D STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $538,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,075,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17064B,  Location: 0.8 N JCT I-5 (Lat: 48.998139,  Lng: -122.735333),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 6,423 (year 2008),  Truck Traffic: 5%,  Design Load: HL 93,  Features Intersected: SR 543 SOUTHBOUND,  Facility Carried by Structure: D STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $370,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $739,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200401,  Location: 0.2 N JCT SR 548 (Lat: 48.999306,  Lng: -122.753583),  Route carried "on" structure: Interstate 5,  Year Built: 2009,  Status: Open,  Structure Length: 9.81m (32.19ft),  Average Daily Traffic: 3,541 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,084 (year 2039),  Design Load: HL 93,  Features Intersected: INSPECTION LANES/BLDGS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 444.742,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.81m (32.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,637,000,  Roadway Improvement Cost: $927,000,  Total Project Cost: $9,274,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 80615,  Location: 11.5 N JCT I-5 (Lat: 48.972089,  Lng: -122.729297),  Route carried "on" structure: State highway 548,  Year Built: 1930,  Year Reconstructed: 1951,  Status: Posted for load,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 7,628 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,953 (year 2039),  Design Load: H 15,  Features Intersected: DAKOTA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.572,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 5.61m (18.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $957,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $1,914,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80776,  Location: 00.3 NW HALL RD. (Lat: 48.971722,  Lng: -122.722383),  Route carried "on" structure: County highway 30410,  Year Built: 1928,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 10.21m (33.50ft),  Average Daily Traffic: 1,149 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,500 (year 2039),  Design Load: H 20,  Features Intersected: DAKOTA CR,  Facility Carried by Structure: PORTAL WY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 30.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.21m (33.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,479,000,  Roadway Improvement Cost: $496,000,  Total Project Cost: $4,958,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 81196,  Location: 00.1 S MCGEE RD. (Lat: 48.965400,  Lng: -122.659983),  Route carried "on" structure: County highway 23892,  Year Built: 1956,  Year Reconstructed: 1989,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 820 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,000 (year 2042),  Design Load: H 20,  Features Intersected: HAYNIE CR,  Facility Carried by Structure: VALLEY VIEW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 20.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $730,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $1,459,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 81365,  Location: 00.2 S HAYNIE RD. (Lat: 48.969683,  Lng: -122.615792),  Route carried "on" structure: County highway 30892,  Year Built: 1965,  Year Reconstructed: 2005,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,500 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,750 (year 2041),  Design Load: H 20,  Features Intersected: DAKOTA CR,  Facility Carried by Structure: DELTA LINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,246,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 86178,  Location: .10 MI S OF MCGEE (Lat: 48.962803,  Lng: -122.682203),  Route carried "on" structure: County highway 32110,  Year Built: 1995,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 275 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 650 (year 2040),  Design Load: HL 93,  Features Intersected: DAKOTA CR,  Facility Carried by Structure: GILES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.9m (130.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,143,000,  Roadway Improvement Cost: $429,000,  Total Project Cost: $4,286,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6851A,  Location: 0.4 N JCT SR 543 (Lat: 48.990000,  Lng: -122.741667),  Route carried "under" structure: Interstate 5,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 9,851 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-5,  Facility Carried by Structure: MITCHELL AVE
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 443.439,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 6851B,  Location: 0.7 N JCT SR 543 (Lat: 48.994028,  Lng: -122.746056),  Route carried "under" structure: Interstate 5,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 9,851 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-5,  Facility Carried by Structure: H ST
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 443.873,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 6926E,  Location: 8.2 N JCT SR 548 (Lat: 48.975250,  Lng: -122.723111),  Route carried "under" structure: Interstate 5,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 22,355 (year 2019),  Truck Traffic: 11%,  Features Intersected: N-W RAMP I-5
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 441.234,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 7057A,  Location: 8.5 N JCT SR 548 (Lat: 48.979222,  Lng: -122.729083),  Route carried "under" structure: Interstate 5,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 22,355 (year 2019),  Truck Traffic: 11%,  Features Intersected: I-5,  Facility Carried by Structure: HUGHES AVE
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 441.797,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 7057B,  Location: 13.8 N JCT I-5 (Lat: 48.997697,  Lng: -122.751778),  Route carried "under" structure: State highway 548,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 5,497 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 548 (D ST),  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 22.289,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 7057C,  Location: 13.8 N JCT I-5 (Lat: 48.997417,  Lng: -122.752028),  Route carried "under" structure: State highway 548,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 5,497 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 548 (D ST),  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 22.241,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 8934A,  Location: 9.2 N JCT SR 548 (Lat: 48.987139,  Lng: -122.735750),  Route carried "under" structure: Interstate 5,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 9,851 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-5
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 442.811,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 17064A,  Location: 0.8 N JCT I-5 (Lat: 48.998167,  Lng: -122.734833),  Route carried "under" structure: State highway 543,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 6,880 (year 2019),  Truck Traffic: 26%,  Features Intersected: SR 543 NORTHBOUND,  Facility Carried by Structure: D STREET
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 1.320,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 17064B,  Location: 0.8 N JCT I-5 (Lat: 48.998139,  Lng: -122.735333),  Route carried "under" structure: State highway 543,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 6,880 (year 2019),  Truck Traffic: 26%,  Features Intersected: SR 543 SOUTHBOUND,  Facility Carried by Structure: D STREET
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 1.320,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 13.4m (44.0ft)

Discuss Blaine, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.