Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cherry Hill Mall, New Jersey (NJ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 121ft / 36.9mTotal length
  • $863,000Total costs
  • 582,336Total average daily traffic
  • 23,072Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cherry Hill Mall
  • No street view available for this location

New bridges in Cherry Hill Mall, NJ - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 21930-1939
  • 31950-1959
  • 111960-1969
  • 11980-1989
  • 12000-2009
Reconstructed bridges in Cherry Hill Mall, NJ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 11950-1959
Average Bridge Daily Traffic in Cherry Hill Mall, NJ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Good
  • 60.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 75.0%Satisfactory
  • 16.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 25.0%Good
  • 50.0%Satisfactory
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Good
  • 33.3%Satisfactory
  • 22.2%Fair
  • 11.1%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 314154,  Location: 0.9 MI NORTH OF I295 INT (Lat: 39.943119,  Lng: -74.978550),  Route carried "on" structure: State highway 73,  Year Built: 1966,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 40,786 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 54,314 (year 2040),  Design Load: HL 93,  Features Intersected: NJ 38
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.947,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.8m (101.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.34m (20.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $76,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $128,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 314155,  Location: 0.9 MI N EXIT 36 I-295 (Lat: 39.943350,  Lng: -74.979031),  Route carried "on" structure: State highway 73,  Year Built: 1966,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 35,925 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 43,111 (year 2040),  Features Intersected: NJ 38
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.963,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.4m (103.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.34m (20.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $38,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $65,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 32915,  Location: 0.2 MI. SO. OF RT. 73. (Lat: 39.942969,  Lng: -74.984061),  Route carried "on" structure: State highway 41,  Year Built: 1966,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 16,889 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 20,608 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: ROUTE 38.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.533,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 29.7m (97.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 329151,  Location: 0.2 MI. NO. OF RT. 38 (Lat: 39.945450,  Lng: -74.982419),  Route carried "on" structure: State highway 41,  Year Built: 1964,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 16,971 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 20,365 (year 2039),  Design Load: HS 20,  Features Intersected: NJ 73
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.887,  Lanes on structure: 5,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 24.1m (79.1ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 24.1m (79.1ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 40315,  Location: 0.41 MI E OF RT 38 (Lat: 39.938439,  Lng: -75.003831),  Route carried "on" structure: County highway 616,  Year Built: 1980,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 10,295 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,354 (year 2041),  Features Intersected: S Branch Pennsauken Crk
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.453,  Lanes on structure: 2,  Owner: County Highway Agency,  Maintenance Responsibility: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 403152,  Location: 0.47 MI FROM RT 41 (Lat: 39.926600,  Lng: -74.987631),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 106 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 127 (year 2041),  Design Load: HS 20,  Features Intersected: Pennsauken Creek S BR TR,  Facility Carried by Structure: King George Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Maintenance Responsibility: Town or Township Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft),  Curb or Sidewalk Widths: Left: 2.9m (9.5ft),  Right: 2.9m (9.5ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 408155,  Location: 1.3 mi N of NJ 70 (Lat: 39.938219,  Lng: -75.030000),  Route carried "on" structure: County highway 644,  Year Built: 1957,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 29,593 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 36,109 (year 2041),  Design Load: HS 20,  Features Intersected: NJ 38
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.941,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $126,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $200,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 40816,  Location: 0.8 MI WEST OF RT 41 (Lat: 39.941700,  Lng: -75.000889),  Route carried "on" structure: City street ,  Year Built: 1909,  Year Reconstructed: 1954,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 9,939 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,126 (year 2041),  Features Intersected: S. BR. PENNSAUKEN CREEK,  Facility Carried by Structure: MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Serious,  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $273,000,  Total Project Cost: $314,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 408161,  Location: 0.56 Mi. E. of Rte 616 (Lat: 39.941439,  Lng: -75.000161),  Route carried "on" structure: State highway 38,  Year Built: 1932,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 56,855 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 69,374 (year 2040),  Features Intersected: SO. BR. PENNSAUKEN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.113,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 29.3m (96.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Underwater Inspection Date: May 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 41015,  Location: 0.2 MILES SOUTH OF RT.38 (Lat: 39.940339,  Lng: -74.981500),  Route carried "on" structure: Ramp State highway 41,  Year Built: 1957,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,377 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,680 (year 2041),  Design Load: HS 20,  Features Intersected: PENNSAUKEN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.147,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 410151,  Location: 0.2 MILES SOUTH OF RT.38 (Lat: 39.940311,  Lng: -74.982519),  Route carried "on" structure: State highway 41,  Year Built: 1967,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 27,790 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 33,909 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: S. BR PENNSAUKEN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.227,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 96.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 90.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 42D009,  Location: 1.39 MI W OF RT 73 (Lat: 39.954131,  Lng: -75.013469),  Route carried "on" structure: County highway 537,  Year Built: 1919,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 12,800 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,360 (year 2041),  Design Load: HS 20,  Features Intersected: S. BRANCH PENNSAUKEN CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.107,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 2.8m (9.2ft),  Right: 2.8m (9.2ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: Febuary 2019,  Bridge Improvement Cost: $99,000,  Total Project Cost: $99,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 42D01,  Location: .29 MI N OF NJ RTE 38 (Lat: 39.945019,  Lng: -75.009211),  Route carried "on" structure: County highway 627,  Year Built: 1962,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 11,018 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,222 (year 2041),  Design Load: HS 20,  Features Intersected: S BR PENNSAUKEN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.557,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43E007,  Location: 0.44 M E OF KINGSHWY RT41 (Lat: 39.931281,  Lng: -74.981261),  Route carried "on" structure: County highway 616,  Year Built: 1933,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 10,295 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,354 (year 2041),  Features Intersected: S BR PENNSAUKEN CREEK,  Facility Carried by Structure: CHURCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.546,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 466153,  Location: 0.4 MILES WEST OF NJ 38 (Lat: 39.941181,  Lng: -75.040211),  Route carried "on" structure: County highway 626,  Year Built: 2009,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 5,613 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,736 (year 2040),  Design Load: HL 93,  Features Intersected: ATLANTIC CITY LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.432,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 59.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.96m (9.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $39,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $57,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 314154,  Location: 0.9 MI NORTH OF I295 INT (Lat: 39.943119,  Lng: -74.978550),  Route carried "under" structure: State highway 38,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 47,967 (year 2020),  Truck Traffic: 4%,  Features Intersected: NJ 38,  Facility Carried by Structure: NJ 73 NB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 8.980,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 314155,  Location: 0.9 MI N EXIT 36 I-295 (Lat: 39.943350,  Lng: -74.979031),  Route carried "under" structure: State highway 38,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 36,856 (year 2020),  Truck Traffic: 4%,  Features Intersected: NJ 38,  Facility Carried by Structure: NJ 73 SB
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 8.996,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 32915,  Location: 0.2 MI. SO. OF RT. 73. (Lat: 39.942969,  Lng: -74.984061),  Route carried "under" structure: State highway 38,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 69,939 (year 2021),  Truck Traffic: 4%,  Features Intersected: ROUTE 38.,  Facility Carried by Structure: RTE 41.
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 8.497,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 329151,  Location: 0.2 MI. NO. OF RT. 38 (Lat: 39.945450,  Lng: -74.982419),  Route carried "under" structure: State highway 73,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 87,987 (year 2019),  Truck Traffic: 4%,  Features Intersected: NJ 73,  Facility Carried by Structure: NJ 41
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 46.381,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 408155,  Location: 1.3 mi N of NJ 70 (Lat: 39.938219,  Lng: -75.030000),  Route carried "under" structure: State highway 38,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 53,335 (year 2021),  Truck Traffic: 4%,  Features Intersected: NJ 38,  Facility Carried by Structure: CR 644
Minimum Vertical Clearance: 4.71m (15.45ft),  Kilometerpoint: 4.506,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.5m (54.1ft)

Discuss Cherry Hill Mall, New Jersey (NJ) on our hugely popular New Jersey forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.