Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Colton, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 92Number of bridges
  • 2,251ft / 686mTotal length
  • $25,014,000Total costs
  • 5,682,814Total average daily traffic
  • 540,698Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Colton
  • No street view available for this location

New bridges in Colton, CA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 41930-1939
  • 11940-1949
  • 221950-1959
  • 151960-1969
  • 391970-1979
  • 21980-1989
  • 21990-1999
  • 12000-2009
  • 42010-2019
Reconstructed bridges in Colton, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 71960-1969
  • 41970-1979
  • 01980-1989
  • 11990-1999
  • 12000-2009
  • 62010-2019
Average Bridge Daily Traffic in Colton, CA
Average Bridge Truck Traffic in Colton, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 40.5%Fair
  • 9.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 81.0%Good
  • 19.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 92.9%Good
  • 7.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Excellent
  • 56.0%Very good
  • 4.0%Good
Find on map >>   Show street view

Structure Number: 54 0292G,  Location: 08-SBD-010-R23.80-COL (Lat: 34.064850,  Lng: -117.304194),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1972,  Status: Open,  Structure Length: 25.12m (82.41ft),  Average Daily Traffic: 28,700 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 35,000 (year 2041),  Design Load: HS 20,  Features Intersected: SANTA ANA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.800,  Lanes on structure: 3,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 81.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 54 0292L,  Location: 08-SBD-010-R23.83-COL (Lat: 34.065375,  Lng: -117.303378),  Route carried "on" structure: Interstate 10,  Year Built: 1937,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 24.78m (81.30ft),  Average Daily Traffic: 130,000 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 165,000 (year 2039),  Design Load: H 15,  Features Intersected: SANTA ANA RIVER
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 23.830,  Lanes on structure: 5,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.78m (81.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 54 0292R,  Location: 08-SBD-010-R23.82-COL (Lat: 34.065089,  Lng: -117.303800),  Route carried "on" structure: Interstate 10,  Year Built: 1958,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 25.51m (83.69ft),  Average Daily Traffic: 135,000 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 165,000 (year 2039),  Design Load: HS 20,  Features Intersected: SANTA ANA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.820,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 54 045,  Location: 08-SBD-010-0.68-MCL (Lat: 34.081886,  Lng: -117.698383),  Route carried "on" structure: Interstate 10,  Year Built: 1953,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 1.97m (6.46ft),  Average Daily Traffic: 278,000 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 285,000 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: MONTE VISTA AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.680,  Lanes on structure: 10,  Lanes under structure: 5,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 47.2m (154.9ft),  Skew: 31 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 47.2m (154.9ft),  Out-to-Out Width: 49.0m (160.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0459,  Location: 08-SBD-010-R23.25-COL (Lat: 34.064492,  Lng: -117.313356),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 21,000 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 26,000 (year 2041),  Design Load: HS 20,  Features Intersected: INTERSTATE 10,  Facility Carried by Structure: MOUNT VERNON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Other Special Inspection Date: May 2018,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0461,  Location: 08-SBD-010-R22.71-COL (Lat: 34.065619,  Lng: -117.323131),  Route carried "on" structure: Interstate 10,  Year Built: 1956,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 204,000 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 210,000 (year 2039),  Design Load: HS 20,  Features Intersected: NINTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.710,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 45.1m (148.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 45.1m (148.0ft),  Out-to-Out Width: 46.9m (153.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0462,  Location: 08-SBD-010-R22.62-COL (Lat: 34.065858,  Lng: -117.324667),  Route carried "on" structure: Interstate 10,  Year Built: 1956,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 204,000 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 230,000 (year 2039),  Design Load: HS 20,  Features Intersected: LA CADENA DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.620,  Lanes on structure: 8,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 46.3m (151.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 46.3m (151.9ft),  Out-to-Out Width: 46.9m (153.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 70.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0462S,  Location: 08-SBD-010-R22.62-COL (Lat: 34.065697,  Lng: -117.324703),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1970,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 2,400 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,600 (year 2041),  Design Load: HS 20,  Features Intersected: LA CADENA DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.620,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0464L,  Location: 08-SBD-010-R22.38-COL (Lat: 34.066219,  Lng: -117.328658),  Route carried "on" structure: Interstate 10,  Year Built: 1956,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 11.03m (36.19ft),  Average Daily Traffic: 102,000 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 120,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BNSF RY & METROLINK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.380,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Other Special Inspection Date: June 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 54 0464R,  Location: 08-SBD-010-R22.36-COL (Lat: 34.066014,  Lng: -117.329086),  Route carried "on" structure: Interstate 10,  Year Built: 1956,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 14.63m (48.00ft),  Average Daily Traffic: 102,000 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 120,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BNSF RY & METROLINK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.360,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Other Special Inspection Date: June 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 54 047,  Location: 08-SBD-018-R96.60-VCTV (Lat: 34.507967,  Lng: -117.322411),  Route carried "on" structure: State highway 18,  Year Built: 1975,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 40,000 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 55,000 (year 2040),  Design Load: HS 20,  Features Intersected: INTERSTATE 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.600,  Lanes on structure: 5,  Lanes under structure: 7,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0471F,  Location: 08-SBD-215-4.21-COL (Lat: 34.066278,  Lng: -117.296558),  Route carried "on" structure: Ramp Interstate 215,  Year Built: 1964,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 23.53m (77.20ft),  Average Daily Traffic: 40,000 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 61,414 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: FAIRWAY, SANTA ANA RIVER
Minimum Vertical Clearance: 6.25m (20.51ft),  Kilometerpoint: 4.210,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.53m (77.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0471L,  Location: 08-SBD-215-4.21-COL (Lat: 34.066361,  Lng: -117.296239),  Route carried "on" structure: Interstate 215,  Year Built: 1958,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 22.46m (73.69ft),  Average Daily Traffic: 87,500 (year 2012),  Truck Traffic: 10%,  Average Future Daily Traffic: 130,983 (year 2044),  Design Load: HS 20,  Features Intersected: FAIRWAY, SANTA ANA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.210,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 77.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 54 0471R,  Location: 08-SBD-215-4.21-COL (Lat: 34.066433,  Lng: -117.295750),  Route carried "on" structure: Interstate 215,  Year Built: 1972,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 21.64m (71.00ft),  Average Daily Traffic: 85,000 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 122,828 (year 2042),  Design Load: HS 20,  Features Intersected: FAIRWAY, SANTA ANA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.210,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0479L,  Location: 08-SBD-215-4.03-COL (Lat: 34.063892,  Lng: -117.296742),  Route carried "on" structure: Interstate 215,  Year Built: 1972,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 85,000 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 122,828 (year 2042),  Design Load: HS 20,  Features Intersected: INTERSTATE 10
Minimum Vertical Clearance: 6.05m (19.85ft),  Kilometerpoint: 4.030,  Lanes on structure: 4,  Lanes under structure: 9,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.3m (128.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0479R,  Location: 08-SBD-215-4.03-COL (Lat: 34.063803,  Lng: -117.296194),  Route carried "on" structure: Interstate 215,  Year Built: 1972,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 85,000 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 122,828 (year 2042),  Design Load: HS 20,  Features Intersected: INTERSTATE 10
Minimum Vertical Clearance: 6.91m (22.67ft),  Kilometerpoint: 4.030,  Lanes on structure: 5,  Lanes under structure: 9,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 27.8m (91.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.3m (128.9ft),  Curb-To-Curb Width: 27.8m (91.2ft),  Out-to-Out Width: 28.7m (94.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0482L,  Location: 08-SBD-215-3.72-COL (Lat: 34.059433,  Lng: -117.297661),  Route carried "on" structure: Interstate 215,  Year Built: 1959,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 22.83m (74.90ft),  Average Daily Traffic: 85,000 (year 2012),  Truck Traffic: 10%,  Average Future Daily Traffic: 133,064 (year 2042),  Design Load: HS 20,  Features Intersected: UP RR, AMTRAK, STEEL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.720,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 50.3m (165.0ft),  Curb-To-Curb Width: 27.8m (91.2ft),  Out-to-Out Width: 28.7m (94.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: January 2022,  Other Special Inspection Date: June 2018,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0482R,  Location: 08-SBD-215-3.72-COL (Lat: 34.059372,  Lng: -117.297233),  Route carried "on" structure: Interstate 215,  Year Built: 1973,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 22.83m (74.90ft),  Average Daily Traffic: 85,000 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 133,064 (year 2042),  Design Load: HS 20,  Features Intersected: UP RR, AMTRAK, STEEL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.720,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 50.6m (166.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: January 2022,  Other Special Inspection Date: June 2018,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0520L,  Location: 08-SBD-215-13.47-SBD (Lat: 34.185117,  Lng: -117.352931),  Route carried "on" structure: Interstate 215,  Year Built: 1958,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 35,500 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 40,000 (year 2040),  Design Load: HS 20,  Features Intersected: CABLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.470,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 27.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 54 0527,  Location: 08-SBD-215-0.40-COL (Lat: 34.024364,  Lng: -117.335567),  Route carried "on" structure: City street R042,  Year Built: 1959,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 15,000 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 17,401 (year 2042),  Design Load: HS 20,  Features Intersected: INTERSTATE 215 & RAMPS,  Facility Carried by Structure: IOWA AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0601,  Location: 08-SBD-010-24.76-COL (Lat: 34.063322,  Lng: -117.287683),  Route carried "on" structure: Interstate 10,  Year Built: 1962,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 110,500 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 132,600 (year 2041),  Design Load: HS 20,  Features Intersected: HUNTS LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.760,  Lanes on structure: 13,  Lanes under structure: 5,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 76.5m (251.0ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 76.5m (251.0ft),  Out-to-Out Width: 77.0m (252.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0817,  Location: 08-SBD-010-R21.96-COL (Lat: 34.067839,  Lng: -117.335881),  Route carried "on" structure: City street R043,  Year Built: 1970,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 10,000 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 15,000 (year 2039),  Design Load: HS 20,  Features Intersected: INTERSTATE 10,  Facility Carried by Structure: RANCHO AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 54 0821F,  Location: 08-SBD-010-R24.57-COL (Lat: 34.063989,  Lng: -117.291036),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1972,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 30,000 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 40,000 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: "E" ST-W10 ON-RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.570,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0822F,  Location: 08-SBD-010-R24.30-COL (Lat: 34.059442,  Lng: -117.298128),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1972,  Status: Open,  Structure Length: 80.01m (262.50ft),  Average Daily Traffic: 45,000 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 48,000 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: I 10, I 215, CON, RR, ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.300,  Lanes on structure: 2,  Lanes under structure: 24,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 13,  Length of Maximum Span: 67.1m (220.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0823G,  Location: 08-SBD-010-R24.19-COL (Lat: 34.063975,  Lng: -117.299628),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1972,  Status: Open,  Structure Length: 77.42m (254.00ft),  Average Daily Traffic: 13,500 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 21,000 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: I 10, I 215, CONNS, RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.190,  Lanes on structure: 2,  Lanes under structure: 22,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 10,  Length of Maximum Span: 68.3m (224.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 91.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0824F,  Location: 08-SBD-215-4.02-COL (Lat: 34.062664,  Lng: -117.293181),  Route carried "on" structure: Ramp Interstate 215,  Year Built: 1972,  Status: Open,  Structure Length: 47.43m (155.61ft),  Average Daily Traffic: 192,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 414,000 (year 2040),  Design Load: HS 20,  Features Intersected: INTERSTATE 10 & 215
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 4.020,  Lanes on structure: 2,  Lanes under structure: 18,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 5,  Length of Maximum Span: 66.1m (216.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 0830R,  Location: 08-SBD-010-R23.60-COL (Lat: 34.064961,  Lng: -117.307578),  Route carried "on" structure: Interstate 10,  Year Built: 1970,  Status: Open,  Structure Length: 11.89m (39.01ft),  Average Daily Traffic: 103,000 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 120,000 (year 2039),  Design Load: HS 20,  Features Intersected: WARM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.600,  Lanes on structure: 5,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 54 086,  Location: 08-SBD-138-R29.96 (Lat: 34.271872,  Lng: -117.304250),  Route carried "on" structure: State highway 138,  Year Built: 1970,  Status: Open,  Structure Length: 10.52m (34.51ft),  Average Daily Traffic: 1,550 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,000 (year 2040),  Design Load: HS 20,  Features Intersected: SEELEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.960,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 54 0861K,  Location: 08-SBD-010-R22.82-COL (Lat: 34.065914,  Lng: -117.321450),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1970,  Status: Open,  Structure Length: 12.07m (39.60ft),  Average Daily Traffic: 5,400 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,000 (year 2041),  Design Load: HS 20,  Features Intersected: UP RR SPUR,  Facility Carried by Structure: PAVILLION S OFFRMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.820,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54 1064F,  Location: 08-SBD-010-R24.27-COL (Lat: 34.066747,  Lng: -117.295394),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1958,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 20.67m (67.81ft),  Average Daily Traffic: 23,000 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 26,000 (year 2041),  Design Load: HS 20,  Features Intersected: SANTA ANA RV, FAIRWAY DR
Minimum Vertical Clearance: 6.50m (21.33ft),  Kilometerpoint: 24.270,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 54 132,  Location: 08-SBD-000--RIA (Lat: 34.136197,  Lng: -117.392467),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 18,000 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 30,000 (year 2035),  Features Intersected: CACTUS CHANNEL,  Facility Carried by Structure: AYALA DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 28.2m (92.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 28.2m (92.5ft),  Out-to-Out Width: 35.2m (115.5ft)

Condition: Channel: Excellent,  Culverts: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2018
Find on map >>   Show street view

Structure Number: 54 1324,  Location: 08-SBD-010-20.97-COL (Lat: 34.068722,  Lng: -117.353167),  Route carried "on" structure: City street R044,  Year Built: 2017,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 20,500 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 28,000 (year 2040),  Design Load: HL 93,  Features Intersected: INTERSTATE 10,  Facility Carried by Structure: PEPPER AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.1m (75.8ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 23.1m (75.8ft),  Out-to-Out Width: 26.7m (87.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54C0001,  Location: 0.1 MI E LA CADENA DR (Lat: 34.033381,  Lng: -117.332925),  Route carried "on" structure: City street ,  Year Built: 1936,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 9,847 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,883 (year 2040),  Features Intersected: BNSF RY,AMTRAK,METROLINK,  Facility Carried by Structure: BARTON RD
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54C0071,  Location: 0.1 MI S RTE I-10 (Lat: 34.066547,  Lng: -117.352894),  Route carried "on" structure: County highway ,  Year Built: 1961,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 1,527 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,290 (year 2037),  Design Load: HS 20,  Features Intersected: UP RR & AMTRAK,  Facility Carried by Structure: PEPPER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.030,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54C0077,  Location: 1.5 MI SOUTH OF I-10 (Lat: 34.044517,  Lng: -117.331283),  Route carried "on" structure: City street ,  Year Built: 1929,  Year Reconstructed: 1940,  Status: Open,  Structure Length: 16.49m (54.10ft),  Average Daily Traffic: 12,519 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,043 (year 2040),  Design Load: H 15,  Features Intersected: SANTA ANA RIVER,  Facility Carried by Structure: LA CADENA DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 32.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.49m (54.10ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: March 2020,  Other Special Inspection Date: March 2018,  Bridge Improvement Cost: $6,888,000,  Roadway Improvement Cost: $1,377,000,  Total Project Cost: $11,572,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54C01,  Location: 0.6 MI S OF RTE I-10 (Lat: 34.057908,  Lng: -117.309942),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 30.08m (98.69ft),  Average Daily Traffic: 20,000 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,247 (year 2040),  Design Load: HS 20,  Features Intersected: SANTA ANA RIVER,  Facility Carried by Structure: MT VERNON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Fair,  Channel: Excellent,  Operating Rating: 24.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 30.08m (98.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,108,000,  Roadway Improvement Cost: $1,429,000,  Total Project Cost: $12,009,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54C0101,  Location: 3.1 MI S RTE I-10 (Lat: 34.062328,  Lng: -117.309958),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 9.85m (32.32ft),  Average Daily Traffic: 10,432 (year 2015),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,036 (year 2040),  Design Load: HS 20,  Features Intersected: UP RR & AMTRAK,  Facility Carried by Structure: MT VERNON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54C0126,  Location: 300' SOUTH RTE I-10 (Lat: 34.066308,  Lng: -117.335733),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 14,295 (year 2012),  Truck Traffic: 3%,  Average Future Daily Traffic: 26,078 (year 2042),  Design Load: HS 20,  Features Intersected: UP RR & AMTRAK,  Facility Carried by Structure: RANCHO AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.040,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 29.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 54C0157,  Location: 3.1 MI S RTE I-10 (Lat: 34.023994,  Lng: -117.362878),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 37.03m (121.49ft),  Average Daily Traffic: 13,550 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 18,457 (year 2040),  Design Load: HS 20,  Features Intersected: SANTA ANA RIVER,  Facility Carried by Structure: RIVERSIDE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place
Discuss Colton, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.