Bridge Statistics for Cuba, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 568ft / 173mTotal length
  • $51,857,000Total costs
  • 102,104Total average daily traffic
  • 40,813Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cuba
  • No street view available for this location

New bridges in Cuba, AL - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 51950-1959
  • 21960-1969
  • 101970-1979
  • 52010-2019
Average Bridge Daily Traffic in Cuba, AL
Average Bridge Truck Traffic in Cuba, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 55.6%Good
  • 16.7%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.8%Very good
  • 33.3%Good
  • 22.2%Satisfactory
  • 16.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 72.2%Good
  • 5.6%Satisfactory
  • 5.6%Fair
  • 5.6%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Very good
  • 33.3%Good
  • 53.3%Satisfactory
  • 6.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 2844,  Location: 3.3 MI NO ST CLAIR CO LN (Lat: 33.939444,  Lng: -86.393611),  Route carried "on" structure: US 231,  Year Built: 1945,  Status: Posted for load,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 4,970 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,460 (year 2041),  Features Intersected: BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 400.508,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 28.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $495,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4023,  Location: 1.0 MI S US HWY 80 (Lat: 32.419731,  Lng: -88.368933),  Route carried "on" structure: County highway 1009,  Year Built: 1951,  Status: Posted for load,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 298 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 443 (year 2034),  Design Load: H 15,  Features Intersected: CO RT 1009 ALAMUCHEE CR,  Facility Carried by Structure: ROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 11.86m (38.91ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $2,033,000,  Roadway Improvement Cost: $203,000,  Total Project Cost: $2,236,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4024,  Location: 0.7 MI S US HWY 80 (Lat: 32.422742,  Lng: -88.372058),  Route carried "on" structure: County highway 1009,  Year Built: 1951,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 1,024 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,522 (year 2038),  Design Load: H 15,  Features Intersected: CO RT 1009 STREAM,  Facility Carried by Structure: ROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,118,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $1,230,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 515,  Location: 0.2 MI NE MISS LINE (Lat: 32.381667,  Lng: -88.408333),  Route carried "on" structure: County highway 1008,  Year Built: 1955,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 297 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 442 (year 2038),  Design Load: H 15,  Features Intersected: CO RT 1008 CREEK,  Facility Carried by Structure: ROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 48.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.24m (7.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $465,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $512,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6323,  Location: 2.3 MI NW US HWY 11 (Lat: 32.470939,  Lng: -88.379958),  Route carried "on" structure: County highway 1056,  Year Built: 1958,  Status: Open,  Structure Length: 13.47m (44.19ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 350 (year 2039),  Design Load: H 15,  Features Intersected: CO RT 1056 TOOMSUBACREEK,  Facility Carried by Structure: ROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.28m (46.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,448,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $2,693,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7438,  Location: 2.6 MI E MISS LINE (Lat: 32.495000,  Lng: -88.400000),  Route carried "on" structure: County highway 1061,  Year Built: 1961,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 450 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 625 (year 2039),  Design Load: H 15,  Features Intersected: CO RT 1061 SWEETWATER CR,  Facility Carried by Structure: ROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $246,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $271,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10545,  Location: 2.0 MI W OF CUBA (Lat: 32.453636,  Lng: -88.392411),  Route carried "on" structure: State highway 8,  Year Built: 1971,  Status: Open,  Structure Length: 12.04m (39.50ft),  Average Daily Traffic: 1,670 (year 2013),  Truck Traffic: 38%,  Average Future Daily Traffic: 2,183 (year 2033),  Design Load: HS 20,  Features Intersected: I 59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 35.1m (115.2ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.89m (42.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,536,000,  Roadway Improvement Cost: $354,000,  Total Project Cost: $3,890,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10546,  Location: 2.0 MI W. OF CUBA (Lat: 32.453567,  Lng: -88.392700),  Route carried "on" structure: State highway 8,  Year Built: 1971,  Status: Open,  Structure Length: 12.04m (39.50ft),  Average Daily Traffic: 1,670 (year 2013),  Truck Traffic: 38%,  Average Future Daily Traffic: 2,183 (year 2033),  Design Load: HS 20,  Features Intersected: I 59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 35.1m (115.2ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.89m (42.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,801,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $4,181,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11096,  Location: 2.3 MI. N. OF MISS.ST.LN. (Lat: 32.466067,  Lng: -88.371853),  Route carried "on" structure: County highway 27,  Year Built: 1974,  Status: Open,  Structure Length: 9.69m (31.79ft),  Average Daily Traffic: 100 (year 2000),  Average Future Daily Traffic: 150 (year 2028),  Design Load: HS 20,  Features Intersected: I-59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.63m (34.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,114,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $2,325,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11097,  Location: 3.6 MI. N.OF MISS. ST.LN. (Lat: 32.479786,  Lng: -88.355311),  Route carried "on" structure: Interstate 59,  Year Built: 1974,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 9,020 (year 2013),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,370 (year 2033),  Design Load: HS 20,  Features Intersected: TOOMSUBA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.839,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.06m (29.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,484,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $2,732,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11098,  Location: 3.6 MI. N.OF MISS. ST.LN. (Lat: 32.479622,  Lng: -88.355061),  Route carried "on" structure: Interstate 59,  Year Built: 1974,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 18,188 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 29,803 (year 2040),  Design Load: HS 20,  Features Intersected: TOOMSUBA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.839,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.06m (29.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,484,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $2,732,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11099,  Location: 3.9MI. N. OF MISS.ST. LN. (Lat: 32.482411,  Lng: -88.352167),  Route carried "on" structure: Interstate 59,  Year Built: 1974,  Status: Open,  Structure Length: 11.40m (37.40ft),  Average Daily Traffic: 9,020 (year 2013),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,370 (year 2039),  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.247,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.27m (40.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,367,000,  Roadway Improvement Cost: $337,000,  Total Project Cost: $3,704,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 111,  Location: 3.9 MI.N.OF MISS.ST. LN. (Lat: 32.482206,  Lng: -88.351869),  Route carried "on" structure: Interstate 59,  Year Built: 1974,  Status: Open,  Structure Length: 11.40m (37.40ft),  Average Daily Traffic: 9,020 (year 2013),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,370 (year 2039),  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.247,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.27m (40.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,367,000,  Roadway Improvement Cost: $337,000,  Total Project Cost: $3,704,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14084,  Location: 0.3 MI N CO RT 1056 (Lat: 32.474264,  Lng: -88.378919),  Route carried "on" structure: County highway 1059,  Year Built: 1950,  Year Reconstructed: 1987,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 33 (year 2020),  Average Future Daily Traffic: 49 (year 2038),  Features Intersected: CO RT 1059 STREAM,  Facility Carried by Structure: ROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $167,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 16703,  Location: 0.6MI E CO RD 10 (Lat: 32.428700,  Lng: -88.370000),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Closed,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 50 (year 1996),  Average Future Daily Traffic: 70 (year 2035),  Design Load: H 15,  Features Intersected: PRETTY BRANCH,  Facility Carried by Structure: PRETTY BRANCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Critical,  Channel: Fair,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.69m (8.83ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: April 2015,  Other Special Inspection Date: October 2015,  Bridge Improvement Cost: $461,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $507,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19762,  Location: 1.5 MI E OF AL 11 (Lat: 32.440894,  Lng: -88.351533),  Route carried "on" structure: US 8,  Year Built: 2012,  Status: Open,  Structure Length: 10.33m (33.89ft),  Average Daily Traffic: 1,475 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 1,928 (year 2033),  Design Load: HS 20,  Features Intersected: NORFOLK & SO RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.101,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.5m (159.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 11.25m (36.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,240,000,  Roadway Improvement Cost: $324,000,  Total Project Cost: $3,564,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19763,  Location: 0.7 MI E JCT. U.S 11 (Lat: 32.440894,  Lng: -88.351533),  Route carried "on" structure: US 8,  Year Built: 2013,  Status: Open,  Structure Length: 10.30m (33.79ft),  Average Daily Traffic: 1,475 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 1,928 (year 2033),  Design Load: HS 20,  Features Intersected: NORFOLK & SO RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.101,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 15 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 48.4m (158.8ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 11.22m (36.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,230,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $3,553,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19764,  Location: 1.5 MI E JCT US11 (Lat: 32.439072,  Lng: -88.338592),  Route carried "on" structure: US 8,  Year Built: 2012,  Status: Open,  Structure Length: 17.82m (58.46ft),  Average Daily Traffic: 1,475 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 1,928 (year 2033),  Design Load: HS 20,  Features Intersected: ALAMUCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.348,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 4,  Length of Maximum Span: 36.9m (121.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 18.51m (60.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $5,330,000,  Roadway Improvement Cost: $533,000,  Total Project Cost: $5,863,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19765,  Location: 1.5 MI E JCT U.S 11 (Lat: 32.439072,  Lng: -88.338592),  Route carried "on" structure: US 8,  Year Built: 2013,  Status: Open,  Structure Length: 17.51m (57.45ft),  Average Daily Traffic: 1,475 (year 2013),  Truck Traffic: 35%,  Average Future Daily Traffic: 1,928 (year 2033),  Design Load: HS 20,  Features Intersected: ALAMUCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.348,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 4,  Length of Maximum Span: 36.3m (119.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 82.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 18.21m (59.74ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $5,244,000,  Roadway Improvement Cost: $524,000,  Total Project Cost: $5,768,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21167,  Location: 0.9 mi SE US Hwy 11 (Lat: 32.451008,  Lng: -88.332758),  Route carried "on" structure: County highway 1049,  Year Built: 2017,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 44 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 66 (year 2039),  Design Load: HS 20,  Features Intersected: Alamuchee Creek
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.19m (26.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,573,000,  Roadway Improvement Cost: $157,000,  Total Project Cost: $1,730,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 10545,  Location: 2.0 MI W OF CUBA (Lat: 32.453636,  Lng: -88.392411),  Route carried "under" structure: Interstate 20,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 11,030 (year 2013),  Truck Traffic: 42%,  Features Intersected: I 59,  Facility Carried by Structure: U.S. 80
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 1.278,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 10546,  Location: 2.0 MI W. OF CUBA (Lat: 32.453567,  Lng: -88.392700),  Route carried "under" structure: Interstate 20,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 11,030 (year 2013),  Truck Traffic: 42%,  Features Intersected: I 59,  Facility Carried by Structure: U.S. 80
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 1.246,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 11096,  Location: 2.3 MI. N. OF MISS.ST.LN. (Lat: 32.466067,  Lng: -88.371853),  Route carried "under" structure: Interstate 20,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 18,040 (year 2013),  Truck Traffic: 44%,  Features Intersected: I-59,  Facility Carried by Structure: COUNTY ROAD 27
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 3.655,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 26.5m (86.9ft)