Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cullman, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 52Number of bridges
  • 522ft / 159mTotal length
  • $73,573,000Total costs
  • 388,937Total average daily traffic
  • 61,446Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cullman
  • No street view available for this location

New bridges in Cullman, AL - historical statistics
  • New bridges - historical statistics
  • 41910-1919
  • 21920-1929
  • 21930-1939
  • 41940-1949
  • 41950-1959
  • 151960-1969
  • 41970-1979
  • 61980-1989
  • 51990-1999
  • 22000-2009
  • 32010-2019
  • 12020-2022
Reconstructed bridges in Cullman, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 31980-1989
  • 21990-1999
Average Bridge Daily Traffic in Cullman, AL
Average Bridge Truck Traffic in Cullman, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Excellent
  • 3.1%Very good
  • 31.3%Good
  • 28.1%Satisfactory
  • 21.9%Fair
  • 3.1%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.4%Excellent
  • 6.3%Very good
  • 21.9%Good
  • 43.8%Satisfactory
  • 18.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.4%Excellent
  • 3.1%Very good
  • 28.1%Good
  • 37.5%Satisfactory
  • 18.8%Fair
  • 3.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.9%Excellent
  • 14.7%Very good
  • 20.6%Good
  • 50.0%Satisfactory
  • 8.8%Fair
  • 2.9%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 7.1%Excellent
  • 7.1%Very good
  • 28.6%Good
  • 50.0%Satisfactory
  • 7.1%Fair
Find on map >>   Show street view

Structure Number: 6,  Location: 7th St SW (Lat: 34.171667,  Lng: -86.846667),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 760 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,065 (year 2042),  Design Load: HS 20,  Features Intersected: CSX RR,  Facility Carried by Structure: 7TH ST SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.37m (14.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,467,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,614,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 62,  Location: 2nd St SW (Lat: 34.175000,  Lng: -86.848333),  Route carried "on" structure: City street ,  Year Built: 1912,  Status: Posted for load,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 1,000 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,440 (year 2042),  Features Intersected: L*N RR,  Facility Carried by Structure: 2ND ST SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: Railroad,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $944,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,038,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 57,  Location: 1.8 MI W JCT SR 187 (Lat: 34.486172,  Lng: -87.896472),  Route carried "on" structure: County highway A24,  Year Built: 1929,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 600 (year 1995),  Truck Traffic: 3%,  Average Future Daily Traffic: 482 (year 2032),  Design Load: H 15,  Features Intersected: LICK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.73m (8.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $430,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $473,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1248,  Location: 5th St SW (Lat: 34.171667,  Lng: -86.846667),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Posted for load,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 880 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,240 (year 2042),  Features Intersected: L*N RR,  Facility Carried by Structure: 5TH ST SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: Railroad,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,023,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,125,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1455,  Location: CR 1162 (Lat: 34.189853,  Lng: -86.891906),  Route carried "on" structure: County highway 40,  Year Built: 1936,  Status: Posted for load,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 75 (year 1991),  Average Future Daily Traffic: 105 (year 2035),  Features Intersected: KILPATRICH CREEK,  Facility Carried by Structure: CO. RT. 1162
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 15.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.17m (7.12ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $357,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $393,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2342,  Location: CR 594 (Lat: 34.111333,  Lng: -86.812506),  Route carried "on" structure: County highway 29,  Year Built: 1940,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 180 (year 1991),  Truck Traffic: 7%,  Average Future Daily Traffic: 265 (year 2036),  Features Intersected: LOVELESS CREEK,  Facility Carried by Structure: CR 594
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $265,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $292,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2592,  Location: 3.7 MI E JCT SR69 * US278 (Lat: 34.176667,  Lng: -86.728333),  Route carried "on" structure: US 278,  Year Built: 1941,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 8,532 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,945 (year 2040),  Design Load: H 15,  Features Intersected: LICK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 138.785,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,693,000,  Roadway Improvement Cost: $269,000,  Total Project Cost: $2,962,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2711,  Location: 1.3 MI E JCT SR 69 * US31 (Lat: 34.181314,  Lng: -86.823556),  Route carried "on" structure: US 278,  Year Built: 1942,  Status: Open,  Structure Length: 9.94m (32.61ft),  Average Daily Traffic: 16,556 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 23,179 (year 2040),  Design Load: H 15,  Features Intersected: EIGHT MILE CREEK,  Facility Carried by Structure: SR 69; SR 74
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 394.832,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 5,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.87m (35.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,535,000,  Roadway Improvement Cost: $254,000,  Total Project Cost: $2,789,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2989,  Location: CR 1427 (Lat: 34.261364,  Lng: -86.789478),  Route carried "on" structure: County highway ,  Year Built: 1947,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 170 (year 1991),  Truck Traffic: 10%,  Average Future Daily Traffic: 250 (year 2035),  Features Intersected: EIGHTMILE CREEK,  Facility Carried by Structure: cr 1427
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $239,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $263,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5554,  Location: CR 703 (Lat: 34.162164,  Lng: -86.809036),  Route carried "on" structure: County highway 38,  Year Built: 1956,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 570 (year 1991),  Truck Traffic: 10%,  Average Future Daily Traffic: 825 (year 2036),  Design Load: H 15,  Features Intersected: EIGHTMILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $626,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $689,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5555,  Location: Cr 703 west (Lat: 34.144739,  Lng: -86.769217),  Route carried "on" structure: County highway 38,  Year Built: 1956,  Status: Posted for load,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 600 (year 1991),  Truck Traffic: 15%,  Average Future Daily Traffic: 800 (year 2035),  Design Load: H 15,  Features Intersected: EIGHTMILE CREEK,  Facility Carried by Structure: CO. RT. 703
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 8.64m (28.35ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $1,362,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $1,498,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5781,  Location: 5 MI N JCT SR 91 * US 31 (Lat: 34.112183,  Lng: -86.809856),  Route carried "on" structure: US 31,  Year Built: 1957,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 13,677 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,148 (year 2040),  Design Load: H 15,  Features Intersected: LOVELESS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 517.555,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,049,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,154,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6166,  Location: cr 1273 (Lat: 34.233011,  Lng: -86.888792),  Route carried "on" structure: County highway 4,  Year Built: 1958,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 60 (year 1991),  Average Future Daily Traffic: 85 (year 2032),  Features Intersected: CHANEY BRANCH,  Facility Carried by Structure: CR 1273
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $185,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7092,  Location: JCT I-65 * US 278 (Lat: 34.170581,  Lng: -86.874875),  Route carried "on" structure: US 278,  Year Built: 1960,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 10,712 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,997 (year 2038),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 124.412,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 21 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,115,000,  Roadway Improvement Cost: $312,000,  Total Project Cost: $3,427,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7093,  Location: JCT I-65 * US 278 (Lat: 34.170361,  Lng: -86.874908),  Route carried "on" structure: US 278,  Year Built: 1960,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 10,712 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,997 (year 2038),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 124.412,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 21 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,115,000,  Roadway Improvement Cost: $312,000,  Total Project Cost: $3,427,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7709,  Location: CR 436 (Lat: 34.145056,  Lng: -86.894881),  Route carried "on" structure: County highway 36,  Year Built: 1962,  Status: Posted for load,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 750 (year 1991),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,050 (year 2035),  Design Load: H 15,  Features Intersected: RYAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 37.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $1,173,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,290,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7748,  Location: CR 702 North Bridge (Lat: 34.156997,  Lng: -86.820017),  Route carried "on" structure: County highway 65,  Year Built: 1962,  Status: Posted for load,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 140 (year 1991),  Truck Traffic: 8%,  Average Future Daily Traffic: 200 (year 2036),  Design Load: H 15,  Features Intersected: EIGHTMILE CREEK,  Facility Carried by Structure: CR 702
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 15.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.11m (6.92ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $332,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $365,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8347,  Location: CR 1352 (Lat: 34.253881,  Lng: -86.803383),  Route carried "on" structure: County highway 46,  Year Built: 1964,  Status: Posted for load,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 110 (year 1991),  Truck Traffic: 10%,  Average Future Daily Traffic: 125 (year 2035),  Features Intersected: GAY BRANCH,  Facility Carried by Structure: cr 1352
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.48m (4.86ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $213,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $234,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 857,  Location: 1 MI N JCT US 278 * I65 (Lat: 34.189161,  Lng: -86.878361),  Route carried "on" structure: County highway 1169,  Year Built: 1965,  Status: Open,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 700 (year 2040),  Design Load: H 20,  Features Intersected: I65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 65.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.57m (37.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,302,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $2,532,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8769,  Location: CR 436 (Lat: 34.140531,  Lng: -86.903725),  Route carried "on" structure: County highway 36,  Year Built: 1965,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 110 (year 1991),  Truck Traffic: 10%,  Average Future Daily Traffic: 150 (year 2035),  Design Load: H 15,  Features Intersected: VEST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $699,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $769,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8889,  Location: 0.5 MI N JCT I-65 (Lat: 34.210000,  Lng: -86.883333),  Route carried "on" structure: State highway 157,  Year Built: 1965,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 15,823 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 22,152 (year 2040),  Design Load: H 20,  Features Intersected: KILPATRICK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.506,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 18.2m (59.7ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $4,122,000,  Roadway Improvement Cost: $412,000,  Total Project Cost: $4,534,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9039,  Location: CR 1422 (Lat: 34.235722,  Lng: -86.804714),  Route carried "on" structure: County highway 2,  Year Built: 1966,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 200 (year 1991),  Truck Traffic: 5%,  Average Future Daily Traffic: 270 (year 2036),  Design Load: H 15,  Features Intersected: LAKE CATOMA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: December 2021,  Underwater Inspection Date: December 2021,  Bridge Improvement Cost: $1,985,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $2,184,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 904,  Location: CR 1476 (Lat: 34.231722,  Lng: -86.789983),  Route carried "on" structure: County highway 2,  Year Built: 1966,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 165 (year 1991),  Truck Traffic: 5%,  Average Future Daily Traffic: 245 (year 2036),  Design Load: H 15,  Features Intersected: LAKE CATOMA,  Facility Carried by Structure: CO. RT. 1476
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $602,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10216,  Location: CR 1486 (Lat: 34.264669,  Lng: -86.771522),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 25 (year 1991),  Average Future Daily Traffic: 40 (year 2036),  Design Load: H 15,  Features Intersected: BUCK BRANCH,  Facility Carried by Structure: cr 1486
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1036,  Location: 0.1 MI N JCT COTTONWOOD L (Lat: 34.153728,  Lng: -86.825222),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Posted for load,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 489 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 572 (year 2042),  Design Load: H 10,  Features Intersected: BRANCH,  Facility Carried by Structure: BRIARWOOD LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 8.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 2.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $242,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $266,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11435,  Location: CR 1386 (Lat: 34.293592,  Lng: -86.842825),  Route carried "on" structure: County highway 39,  Year Built: 1975,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 55 (year 1991),  Average Future Daily Traffic: 80 (year 2036),  Design Load: H 15,  Features Intersected: FLINT CREEK,  Facility Carried by Structure: CO. RT.1386
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $461,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11814,  Location: Cr 702 South culvert (Lat: 34.123617,  Lng: -86.790575),  Route carried "on" structure: County highway 33,  Year Built: 1977,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 70 (year 1991),  Average Future Daily Traffic: 75 (year 2036),  Design Load: H 15,  Features Intersected: LOVELESS,  Facility Carried by Structure: State lands road 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 64.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $319,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12856,  Location: CR 1508 (Lat: 34.237475,  Lng: -86.752822),  Route carried "on" structure: County highway ,  Year Built: 1927,  Year Reconstructed: 1983,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 125 (year 1991),  Truck Traffic: 10%,  Average Future Daily Traffic: 140 (year 2036),  Features Intersected: BUCK BRANCH,  Facility Carried by Structure: Cr 1508
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 27.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $303,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13055,  Location: 1.6 MI N JCT SR69 * SR157 (Lat: 34.199056,  Lng: -86.812306),  Route carried "on" structure: State highway 157,  Year Built: 1983,  Status: Open,  Structure Length: 18.41m (60.40ft),  Average Daily Traffic: 12,422 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 17,391 (year 2040),  Design Load: HS 20,  Features Intersected: CATOMA LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.573,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.07m (62.57ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $5,491,000,  Roadway Improvement Cost: $549,000,  Total Project Cost: $6,040,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13056,  Location: 3.3 MI N JCT SR 69 * 157 (Lat: 34.205833,  Lng: -86.838389),  Route carried "on" structure: State highway 157,  Year Built: 1983,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 15,791 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 22,107 (year 2040),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.260,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $4,083,000,  Roadway Improvement Cost: $408,000,  Total Project Cost: $4,491,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13057,  Location: 3.9 MI N JCT SR69 * SR157 (Lat: 34.206083,  Lng: -86.850083),  Route carried "on" structure: State highway 157,  Year Built: 1983,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 15,024 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 21,034 (year 2040),  Design Load: HS 20,  Features Intersected: CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.339,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.69m (18.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,640,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,804,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13192,  Location: Cr 1506 (Lat: 34.230239,  Lng: -86.757478),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 55 (year 1991),  Average Future Daily Traffic: 75 (year 2036),  Design Load: HS 20,  Features Intersected: BRINDLEY CREEK,  Facility Carried by Structure: cr 1506
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 70.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,234,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,357,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 13952,  Location: CR 601 (Lat: 34.111164,  Lng: -86.799297),  Route carried "on" structure: County highway 43,  Year Built: 1986,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 120 (year 1991),  Truck Traffic: 7%,  Average Future Daily Traffic: 165 (year 2028),  Features Intersected: RAIL ROAD,  Facility Carried by Structure: CO. RT. 601
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,050,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,155,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14253,  Location: 0.7 MI N JCT 278 (Lat: 34.196667,  Lng: -86.836667),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 489 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 927 (year 2042),  Design Load: HS 20,  Features Intersected: WOLF CREEK,  Facility Carried by Structure: CONVENT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $317,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $349,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15027,  Location: JCT I65 * SR 157 (Lat: 34.207439,  Lng: -86.878372),  Route carried "on" structure: State highway 157,  Year Built: 1965,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 9.11m (29.89ft),  Average Daily Traffic: 15,823 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 22,152 (year 2040),  Design Load: HS 20,  Features Intersected: I65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.766,  Lanes on structure: 5,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 24.5m (80.4ft),  Out-to-Out Width: 25.4m (83.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 35.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.08m (33.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $5,735,000,  Roadway Improvement Cost: $574,000,  Total Project Cost: $6,309,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15204,  Location: 2.5 MI N JCT US 278 (Lat: 34.210000,  Lng: -86.765000),  Route carried "on" structure: State highway 69,  Year Built: 1990,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 9,049 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,669 (year 2040),  Design Load: HS 20,  Features Intersected: BRINDLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 401.667,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,129,000,  Roadway Improvement Cost: $213,000,  Total Project Cost: $2,342,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15716,  Location: 0.1 MI E JCT US31 * US278 (Lat: 34.173333,  Lng: -86.843333),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 10,970 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,993 (year 2042),  Design Load: HS 20,  Features Intersected: CSX RR,  Facility Carried by Structure: 4TH ST SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.003,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,781,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $1,959,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16883,  Location: 0.5 MI E JCT US 31 (Lat: 34.191667,  Lng: -86.851667),  Route carried "on" structure: City street ,  Year Built: 1915,  Year Reconstructed: 1986,  Status: Posted for load,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 1,000 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,350 (year 2041),  Design Load: H 10,  Features Intersected: RAILROAD @ WALNUT STREET,  Facility Carried by Structure: WALNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: Railroad,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 6.5m (21.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: March 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $518,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $570,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 17746,  Location: 0.75MI. E JCT SR157*US278 (Lat: 34.182786,  Lng: -86.772461),  Route carried "on" structure: US 278,  Year Built: 1997,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 11,988 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 16,738 (year 2039),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: CO. RD. 1605
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 134.411,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,179,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,297,000 ( Estimate for 2022)
Discuss Cullman, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.