  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 49ft / 15.0mTotal length
  • $15,821,000Total costs
  • 10,612Total average daily traffic
  • 1,318Total average daily truck traffic
  • 12,277Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dixie
  • No street view available for this location

New bridges in Dixie, WA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11950-1959
  • 31970-1979
  • 31990-1999
  • 22010-2019
  • 12020-2022
Average Bridge Daily Traffic in Dixie, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Very good
  • 40.0%Good
  • 10.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 45.5%Very good
  • 9.1%Good
  • 36.4%Satisfactory
  • 9.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 45.5%Very good
  • 18.2%Good
  • 27.3%Satisfactory
  • 9.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 75.0%Very good
  • 8.3%Good
  • 8.3%Satisfactory
  • 8.3%Poor
Find on map >>   Show street view

Structure Number: 4598A,  Location: 11.3 E JCT SR 125 (Lat: 46.136667,  Lng: -118.166889),  Route carried "on" structure: US 12,  Year Built: 1954,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 4,893 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 5,480 (year 2039),  Design Load: HS 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 558.796,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2018,  Bridge Improvement Cost: $432,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $864,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8527A,  Location: 12.0 E JCT SR 125 (Lat: 46.140375,  Lng: -118.154686),  Route carried "on" structure: US 12,  Year Built: 1920,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 4,641 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,197 (year 2039),  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 559.826,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.96m (9.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $776,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $1,552,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80555,  Location: 00.10 E OF COPPEI RD (Lat: 46.190131,  Lng: -118.111022),  Route carried "on" structure: County highway 76830,  Year Built: 1920,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 60 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 75 (year 2040),  Design Load: H 15,  Features Intersected: SOUTH FORK COPPEI CR,  Facility Carried by Structure: SOUTH FORK COPPEI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $471,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $942,000 ( Estimate for 2014),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82399,  Location: 04.14 S SR 12 (Lat: 46.090889,  Lng: -118.114917),  Route carried "on" structure: County highway 75500,  Year Built: 1977,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 45 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 50 (year 2043),  Design Load: HS 20+Mod,  Features Intersected: DRY CREEK,  Facility Carried by Structure: BISCUIT RIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,094,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 82401,  Location: 04.68 S SR 12 (Lat: 46.090472,  Lng: -118.104222),  Route carried "on" structure: County highway 75500,  Year Built: 1977,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 45 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 50 (year 2043),  Design Load: HS 20+Mod,  Features Intersected: DRY CREEK,  Facility Carried by Structure: BISCUIT RIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 23.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,094,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 82405,  Location: 05.23 S SR 12 (Lat: 46.095083,  Lng: -118.095000),  Route carried "on" structure: County highway 75500,  Year Built: 1977,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 45 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 50 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: DRY CREEK,  Facility Carried by Structure: BISCUIT RIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 23.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,094,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 86174,  Location: 00.09W UPPER DRY CR (Lat: 46.139667,  Lng: -118.150111),  Route carried "on" structure: County highway 74410,  Year Built: 1995,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 304 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 549 (year 2043),  Design Load: HS 25 or greater,  Features Intersected: DRY CREEK,  Facility Carried by Structure: THIRD ST (D)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,094,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $2,189,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86304,  Location: 0.008 W COPPEI RD (Lat: 46.190389,  Lng: -118.109194),  Route carried "on" structure: County highway 76830,  Year Built: 1997,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 71 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 80 (year 2043),  Design Load: Railroad,  Features Intersected: NORTH FORK COPPEI CREEK,  Facility Carried by Structure: SOUTH FORK COPPEI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $502,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,003,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86305,  Location: 00.1 E OF WALKER RD (Lat: 46.178972,  Lng: -118.106722),  Route carried "on" structure: County highway 76830,  Year Built: 1997,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 61 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 111 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SOUTH FORK COPPEI CREEK,  Facility Carried by Structure: SOUTH FORK COPPEI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $593,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,186,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 88214,  Location: 0.03E BISCUIT RIDGE RD (Lat: 46.097878,  Lng: -118.084103),  Route carried "on" structure: County highway 75680,  Year Built: 2010,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 65 (year 2021),  Average Future Daily Traffic: 65 (year 2043),  Design Load: HL 93,  Features Intersected: SOUTH FORK DRY CREEK,  Facility Carried by Structure: SCOTT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $730,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $1,459,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 88684,  Location: 0.05 N SR 12 (Lat: 46.140731,  Lng: -118.155894),  Route carried "on" structure: County highway 67950,  Year Built: 2014,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 450 (year 2040),  Design Load: HL 93,  Features Intersected: UPPER DRY CREEK,  Facility Carried by Structure: PETTYBONE ST N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 96.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 84.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,155,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $2,310,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 89166,  Location: 0.214 SE OF SR 12 (Lat: 46.146308,  Lng: -118.140200),  Route carried "on" structure: County highway 76200,  Year Built: 2020,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 82 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 120 (year 2040),  Design Load: HL 93,  Features Intersected: MUD CREEK,  Facility Carried by Structure: MUD CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,034,000 ( Estimate for 2014)