Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Everett, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 126Number of bridges
  • 5,469ft / 1,667mTotal length
  • $1,001,210,000Total costs
  • 4,805,444Total average daily traffic
  • 288,242Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Everett
  • No street view available for this location

New bridges in Everett, WA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 11940-1949
  • 101950-1959
  • 651960-1969
  • 81970-1979
  • 51980-1989
  • 121990-1999
  • 192000-2009
  • 32010-2019
Reconstructed bridges in Everett, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 31990-1999
  • 182000-2009
Average Bridge Daily Traffic in Everett, WA
Average Bridge Truck Traffic in Everett, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.3%Very good
  • 55.8%Good
  • 29.1%Satisfactory
  • 4.7%Fair
  • 1.2%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.1%Very good
  • 59.3%Good
  • 20.9%Satisfactory
  • 7.0%Fair
  • 4.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.0%Very good
  • 66.3%Good
  • 23.3%Satisfactory
  • 1.2%Fair
  • 2.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 53.6%Very good
  • 32.1%Good
  • 14.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 1WA000V,  Location: NAVAL STATION EVERETT, WA (Lat: 47.985717,  Lng: -122.227122),  Route carried "on" structure: ServiceFederal lands road ,  Year Built: 1995,  Status: Open,  Structure Length: 20.72m (67.98ft),  Average Daily Traffic: 50 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 60 (year 2038),  Features Intersected: EAST WATERWAY,  Facility Carried by Structure: SPRUANCE BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: Navy/Marines,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 36,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.72m (67.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $32,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 965A,  Location: 5.0 N JCT I-5 (Lat: 48.012150,  Lng: -122.189419),  Route carried "on" structure: State highway 529,  Year Built: 1927,  Year Reconstructed: 1994,  Status: Posted for load,  Structure Length: 81.69m (268.01ft),  Average Daily Traffic: 17,243 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,967 (year 2039),  Design Load: H 20,  Features Intersected: SNOHOMISH RIVER
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 6.148,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Navigation Control: Yes ( Vertical Clearance: 22.9m (75.1ft), Horizontal Clearance: 32.0m (105.0ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 30,  Length of Maximum Span: 54.9m (180.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 81.69m (268.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Underwater Inspection Date: July 2019,  Other Special Inspection Date: July 2020,  Bridge Improvement Cost: $17,152,000,  Roadway Improvement Cost: $3,430,000,  Total Project Cost: $34,304,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 965B,  Location: 6.3 N JCT I-5 (Lat: 48.030861,  Lng: -122.183833),  Route carried "on" structure: State highway 529,  Year Built: 1927,  Status: Open,  Structure Length: 17.71m (58.10ft),  Average Daily Traffic: 17,019 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,643 (year 2039),  Features Intersected: UNION SL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.256,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.71m (58.10ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $3,486,000,  Roadway Improvement Cost: $697,000,  Total Project Cost: $6,972,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3842A,  Location: 2.3 N JCT SR 527 (Lat: 47.948256,  Lng: -122.198453),  Route carried "on" structure: Interstate 5,  Year Built: 1950,  Year Reconstructed: 2007,  Status: Posted for load,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 96,938 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 140,366 (year 2039),  Design Load: HS 20,  Features Intersected: LOWELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 308.222,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 24.5m (80.4ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.33m (14.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,329,000,  Roadway Improvement Cost: $466,000,  Total Project Cost: $4,658,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 3842B,  Location: 0.1 N JCT I-5 (Lat: 47.961272,  Lng: -122.200706),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 5,763 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,053 (year 2036),  Design Load: HS 15,  Features Intersected: I-5 RAMPS,  Facility Carried by Structure: BROADWAY AVE. NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.456,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 15.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 4.91m (16.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $612,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,224,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 4331A,  Location: 5.0 N JCT I-5 (Lat: 48.012667,  Lng: -122.189306),  Route carried "on" structure: State highway 529,  Year Built: 1954,  Status: Open,  Structure Length: 75.13m (246.49ft),  Average Daily Traffic: 17,243 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,967 (year 2039),  Design Load: HS 20,  Features Intersected: SNOHOMISH RIVER
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 6.196,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Navigation Control: Yes ( Vertical Clearance: 22.9m (75.1ft), Horizontal Clearance: 43.0m (141.1ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 28,  Length of Maximum Span: 73.2m (240.2ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 75.13m (246.49ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Underwater Inspection Date: July 2019,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $18,734,000,  Roadway Improvement Cost: $3,747,000,  Total Project Cost: $37,468,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4373A,  Location: 6.6 N JCT I-5 (Lat: 48.034889,  Lng: -122.181500),  Route carried "on" structure: State highway 529,  Year Built: 1954,  Status: Open,  Structure Length: 27.74m (91.01ft),  Average Daily Traffic: 16,795 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,319 (year 2039),  Design Load: HS 20,  Features Intersected: STEAMBOAT SLOUGH
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 8.755,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Navigation Control: Yes ( Vertical Clearance: 1.8m (5.9ft), Horizontal Clearance: 30.5m (100.1ft)),  Material/Design: Steel,  Design/Construction: Movable - Swing,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 10,  Length of Maximum Span: 55.5m (182.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.74m (91.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Underwater Inspection Date: July 2020,  Other Special Inspection Date: July 2020,  Bridge Improvement Cost: $5,824,000,  Roadway Improvement Cost: $1,165,000,  Total Project Cost: $11,648,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 4562A,  Location: 6.3 N JCT I-5 (Lat: 48.030472,  Lng: -122.182972),  Route carried "on" structure: State highway 529,  Year Built: 1954,  Status: Open,  Structure Length: 19.29m (63.29ft),  Average Daily Traffic: 17,019 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,643 (year 2039),  Design Load: HS 20,  Features Intersected: UNION SL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.240,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.29m (63.29ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $4,558,000,  Roadway Improvement Cost: $912,000,  Total Project Cost: $9,115,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 4788A,  Location: 4.9 N JCT I-5 (Lat: 48.011250,  Lng: -122.190417),  Route carried "on" structure: State highway 529,  Year Built: 1955,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 17,243 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,967 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 529/E MARINE VIEW DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.019,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $589,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,178,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 4788B,  Location: 4.9 N JCT I-5 (Lat: 48.011639,  Lng: -122.190389),  Route carried "on" structure: State highway 529,  Year Built: 1955,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 17,243 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,967 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 529/E MARINE VIEW DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.019,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $589,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,178,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7116A,  Location: 5.3 N JCT SR 525 (Lat: 47.916772,  Lng: -122.208478),  Route carried "on" structure: State highway 5,  Year Built: 1963,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 13,341 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,317 (year 2039),  Design Load: HS 20,  Features Intersected: SR 526 EB TO I-5 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.109,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.61m (18.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,619,000,  Roadway Improvement Cost: $324,000,  Total Project Cost: $3,238,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7116B,  Location: JCT I-5 (Lat: 47.915056,  Lng: -122.208917),  Route carried "on" structure: State highway 99,  Year Built: 1963,  Status: Open,  Structure Length: 10.42m (34.19ft),  Average Daily Traffic: 20,588 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 29,811 (year 2039),  Design Load: HS 20,  Features Intersected: I-5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.061,  Lanes on structure: 1,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.42m (34.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,326,000,  Roadway Improvement Cost: $465,000,  Total Project Cost: $4,651,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7651B,  Location: 2.1 E JCT I-5 (Lat: 47.978397,  Lng: -122.168917),  Route carried "on" structure: US 2,  Year Built: 1968,  Status: Open,  Structure Length: 63.43m (208.10ft),  Average Daily Traffic: 39,911 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 57,791 (year 2039),  Design Load: HS 20,  Features Intersected: EBEY SLOUGH AND SR 204
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 3.315,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 36,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 63.43m (208.10ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $14,151,000,  Roadway Improvement Cost: $2,830,000,  Total Project Cost: $28,302,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 7888B,  Location: JCT I-5 (Lat: 47.981542,  Lng: -122.185919),  Route carried "on" structure: Ramp US 2,  Year Built: 1966,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 6,692 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,690 (year 2039),  Design Load: HS 20,  Features Intersected: W-N RAMP EVERETT AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 1,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.02m (9.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $515,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,030,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7888C,  Location: 4.3 N JCT SR 527 (Lat: 47.976611,  Lng: -122.190417),  Route carried "on" structure: Interstate 5,  Year Built: 1966,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 85,426 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 123,696 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 529 / PACIFIC AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 311.617,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 24.2m (79.4ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.93m (9.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,536,000,  Roadway Improvement Cost: $307,000,  Total Project Cost: $3,072,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7888D,  Location: 4.3 N JCT SR 527 (Lat: 47.976611,  Lng: -122.190689),  Route carried "on" structure: Interstate 5,  Year Built: 1966,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 85,426 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 123,696 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 529 - PACIFIC AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 311.617,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 24.2m (79.4ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.93m (9.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,574,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $3,149,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7888E,  Location: 1.1 N JCT SR 529 (Lat: 47.978889,  Lng: -122.189528),  Route carried "on" structure: Interstate 5,  Year Built: 1966,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 63,282 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 91,632 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: US 2 EB/HEWITT AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 311.875,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 20.5m (67.3ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 24.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.51m (11.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,633,000,  Roadway Improvement Cost: $327,000,  Total Project Cost: $3,266,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7888F,  Location: 1.1 N JCT SR 529 (Lat: 47.978889,  Lng: -122.190028),  Route carried "on" structure: Interstate 5,  Year Built: 1966,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 63,282 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 91,632 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: US 2 EB/HEWITT AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 311.875,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 20.5m (67.3ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.51m (11.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,587,000,  Roadway Improvement Cost: $317,000,  Total Project Cost: $3,174,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7888G,  Location: 0.1 N JCT US 2 (Lat: 47.981611,  Lng: -122.186750),  Route carried "on" structure: Interstate 5,  Year Built: 1966,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 63,282 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 91,632 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 529 SPUR/EVERETT AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 312.245,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 20.5m (67.3ft),  Out-to-Out Width: 21.4m (70.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,766,000,  Roadway Improvement Cost: $353,000,  Total Project Cost: $3,533,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7888H,  Location: 0.1 N JCT US 2 (Lat: 47.981600,  Lng: -122.187106),  Route carried "on" structure: Interstate 5,  Year Built: 1966,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 63,282 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 91,632 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 529 SPUR/EVERETT AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 312.245,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 20.5m (67.3ft),  Out-to-Out Width: 21.4m (70.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,766,000,  Roadway Improvement Cost: $353,000,  Total Project Cost: $3,533,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7888I,  Location: 1.1 N JCT SR 526 (Lat: 47.978861,  Lng: -122.189417),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1966,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 20,623 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 29,862 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: HEWITT AVE,  Facility Carried by Structure: N-E RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 23.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.69m (12.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $702,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $1,404,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7889A,  Location: 0.9 N JCT SR 527 (Lat: 47.929917,  Lng: -122.198556),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 3,051 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,236 (year 2035),  Design Load: HS 20,  Features Intersected: I-5,  Facility Carried by Structure: 75TH ST SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,680,000,  Roadway Improvement Cost: $336,000,  Total Project Cost: $3,360,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7923A,  Location: 1.1 E JCT I-5 (Lat: 47.978361,  Lng: -122.163917),  Route carried "on" structure: Ramp US 2,  Year Built: 1967,  Status: Open,  Structure Length: 11.61m (38.09ft),  Average Daily Traffic: 999 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,446 (year 2039),  Design Load: HS 20,  Features Intersected: EBEY SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.61m (38.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,676,000,  Roadway Improvement Cost: $335,000,  Total Project Cost: $3,353,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 8085A,  Location: JCT I-5 (Lat: 47.980661,  Lng: -122.187919),  Route carried "on" structure: Ramp US 2,  Year Built: 1967,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 23,030 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 33,347 (year 2039),  Design Load: HS 20,  Features Intersected: S-E RAMP
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 0.113,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $226,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $452,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8085B,  Location: JCT I-5 (Lat: 47.980764,  Lng: -122.187869),  Route carried "on" structure: US 2,  Year Built: 1967,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 11,976 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 17,341 (year 2039),  Design Load: HS 20,  Features Intersected: S-E RAMP
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $327,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $654,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8085C,  Location: 1.3 N JCT SR 529 (Lat: 47.980833,  Lng: -122.187222),  Route carried "on" structure: Interstate 5,  Year Built: 1967,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 63,282 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 91,632 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: W-S,W-W,S-E RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 312.084,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.3m (66.6ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $3,478,000,  Roadway Improvement Cost: $696,000,  Total Project Cost: $6,955,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8085D,  Location: 1.3 N JCT SR 529 (Lat: 47.980833,  Lng: -122.188500),  Route carried "on" structure: Interstate 5,  Year Built: 1967,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 11.00m (36.09ft),  Average Daily Traffic: 63,282 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 91,632 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: W-S,W-W,S-E RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 312.068,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 20.3m (66.6ft),  Out-to-Out Width: 20.9m (68.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.00m (36.09ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $4,910,000,  Roadway Improvement Cost: $982,000,  Total Project Cost: $9,819,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8085E,  Location: JCT I-5 (Lat: 47.981750,  Lng: -122.187675),  Route carried "on" structure: Spur State highway 529,  Year Built: 1967,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 6,927 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,030 (year 2039),  Design Load: HS 20,  Features Intersected: I-5 S-E RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $742,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $1,484,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8085F,  Location: 0.6 N JCT US 2 (Lat: 47.986889,  Lng: -122.183417),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 2,123 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,412 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: I-5, W-N RAMP,  Facility Carried by Structure: 23RD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.076,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,496,000,  Roadway Improvement Cost: $299,000,  Total Project Cost: $2,992,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8090A,  Location: 3.8 N JCT SR 527 (Lat: 47.969694,  Lng: -122.195611),  Route carried "on" structure: Interstate 5,  Year Built: 1967,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 29.50m (96.78ft),  Average Daily Traffic: 92,213 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 133,524 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 310.732,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 23.9m (78.4ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 19.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 29.50m (96.78ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $15,488,000,  Roadway Improvement Cost: $3,098,000,  Total Project Cost: $30,976,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8090B,  Location: 3.8 N JCT SR 527 (Lat: 47.969833,  Lng: -122.195833),  Route carried "on" structure: Interstate 5,  Year Built: 1967,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 26.94m (88.39ft),  Average Daily Traffic: 92,213 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 133,524 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 310.732,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 23.9m (78.4ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 16.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.94m (88.39ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $14,144,000,  Roadway Improvement Cost: $2,829,000,  Total Project Cost: $28,288,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8132A,  Location: 2.3 N JCT SR 527 (Lat: 47.948347,  Lng: -122.199000),  Route carried "on" structure: Interstate 5,  Year Built: 1967,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 96,938 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 140,366 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: LOWELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 308.222,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.1m (79.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 24.2m (79.4ft),  Out-to-Out Width: 24.8m (81.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,402,000,  Roadway Improvement Cost: $680,000,  Total Project Cost: $6,804,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8132E,  Location: 3.5 N JCT SR 527 (Lat: 47.966306,  Lng: -122.198694),  Route carried "on" structure: Interstate 5,  Year Built: 1967,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 79,692 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 115,394 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: ABANDONED RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 310.298,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 20.5m (67.3ft),  Out-to-Out Width: 21.2m (69.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $3,692,000,  Roadway Improvement Cost: $738,000,  Total Project Cost: $7,384,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8132F,  Location: 3.5 N JCT SR 527 (Lat: 47.966667,  Lng: -122.199222),  Route carried "on" structure: Interstate 5,  Year Built: 1967,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 8.26m (27.10ft),  Average Daily Traffic: 79,692 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 115,394 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: ABANDONED RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 310.298,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 27.2m (89.2ft),  Out-to-Out Width: 30.6m (100.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.26m (27.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $4,878,000,  Roadway Improvement Cost: $976,000,  Total Project Cost: $9,756,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8132G,  Location: 3.7 N JCT SR 527 (Lat: 47.968694,  Lng: -122.197139),  Route carried "on" structure: Interstate 5,  Year Built: 1967,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 92,213 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 133,524 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SMITH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 310.603,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.1m (79.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 24.2m (79.4ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 18.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,782,000,  Roadway Improvement Cost: $356,000,  Total Project Cost: $3,564,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Everett, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.