Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Exeter, New Hampshire (NH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 36Number of bridges
  • 404ft / 123mTotal length
  • $91,118,000Total costs
  • 471,083Total average daily traffic
  • 21,480Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Exeter
  • No street view available for this location

New bridges in Exeter, NH - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 101930-1939
  • 141990-1999
  • 92000-2009
  • 22010-2019
Reconstructed bridges in Exeter, NH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31970-1979
  • 11980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Exeter, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.4%Excellent
  • 34.5%Very good
  • 48.3%Good
  • 3.4%Satisfactory
  • 6.9%Fair
  • 3.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.9%Excellent
  • 34.5%Very good
  • 37.9%Good
  • 10.3%Satisfactory
  • 10.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.4%Excellent
  • 41.4%Very good
  • 31.0%Good
  • 6.9%Satisfactory
  • 13.8%Fair
  • 3.4%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 21.1%Excellent
  • 21.1%Very good
  • 47.4%Good
  • 5.3%Satisfactory
  • 5.3%Fair
Find on map >>   Show street view

Structure Number: 82004000111,  Location: EXETER (Lat: 43.008497,  Lng: -71.002456),  Route carried "on" structure: State highway 101,  Year Built: 2000,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 41,170 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 60,931 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 132.669,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 31.9m (104.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82004400057,  Location: AT BRENTWOOD TL (Lat: 42.969853,  Lng: -71.000611),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 910 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,346 (year 2042),  Features Intersected: EXETER RIVER,  Facility Carried by Structure: CROSS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.953,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82004500085,  Location: .6 MI. FROM BRENTWOOD TL (Lat: 42.988731,  Lng: -71.000358),  Route carried "on" structure: State highway 111A,  Year Built: 1936,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,556 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,302 (year 2042),  Design Load: H 15,  Features Intersected: DUDLEY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 342.871,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82005700052,  Location: 0.6 MI FROM BRENTWOOD TL (Lat: 42.965092,  Lng: -70.988272),  Route carried "on" structure: State highway 111,  Year Built: 1933,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 4,376 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,476 (year 2042),  Design Load: HS 20,  Features Intersected: EXETER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.026,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 82005800106,  Location: 0.6MI W NH 27 OVERPASS (Lat: 43.005969,  Lng: -70.987031),  Route carried "on" structure: State highway 101,  Year Built: 2000,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 20,566 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 30,437 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: CONNOR FARM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 133.971,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82005800107,  Location: 0.6MI W NH 27 OVERPASS (Lat: 43.006153,  Lng: -70.986875),  Route carried "on" structure: State highway 101,  Year Built: 2000,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 20,604 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 30,493 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: CONNOR FARM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.314,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82006200102,  Location: 0.3MI W NH 27 OVERPASS (Lat: 43.003503,  Lng: -70.982094),  Route carried "on" structure: State highway 101,  Year Built: 1998,  Status: Open,  Structure Length: 2.84m (9.32ft),  Average Daily Traffic: 20,566 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 30,437 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: BLOODY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 134.456,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82006200103,  Location: 0.3MI W NH 27 OVERPASS (Lat: 43.003767,  Lng: -70.981947),  Route carried "on" structure: State highway 101,  Year Built: 1998,  Status: Open,  Structure Length: 2.76m (9.06ft),  Average Daily Traffic: 22,939 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 33,949 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: BLOODY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.831,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 20.8m (68.2ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.76m (9.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82006300105,  Location: 0.6 MI W JCT NH 27/NH101 (Lat: 43.004106,  Lng: -70.981133),  Route carried "on" structure: State highway 27,  Year Built: 1998,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 11,080 (year 2020),  Average Future Daily Traffic: 16,398 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: BLOODY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.893,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.6m (93.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.8m (68.2ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.02m (9.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82006800083,  Location: 0.6MI RTE 111A (Lat: 42.987683,  Lng: -70.977939),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 12 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 17 (year 2042),  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: GARRISON LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.246,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 16 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 82006800102,  Location: JCT NH 27/NH101 (Lat: 43.001619,  Lng: -70.976167),  Route carried "on" structure: State highway 27,  Year Built: 1999,  Status: Open,  Structure Length: 6.67m (21.88ft),  Average Daily Traffic: 11,080 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 16,398 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NH101
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.413,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 24 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 24.8m (81.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.67m (21.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82007500078,  Location: 1.75 MI. TO BRENTWOOD TL (Lat: 42.984253,  Lng: -70.971742),  Route carried "on" structure: State highway 111A,  Year Built: 1934,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,475 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,663 (year 2042),  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 345.346,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8200780007,  Location: 1.4 MI FROM JCT 101C (Lat: 42.977608,  Lng: -70.969047),  Route carried "on" structure: State highway 111,  Year Built: 1930,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 5,970 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,835 (year 2042),  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.201,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82008100046,  Location: 1.36MI. RTE 111 (Lat: 42.961814,  Lng: -70.964847),  Route carried "on" structure: Other road ,  Year Built: 1993,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 455 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 673 (year 2042),  Features Intersected: EXETER RIVER,  Facility Carried by Structure: LINDEN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.843,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82008700062,  Location: 0.39MI. RTE 111 (Lat: 42.972136,  Lng: -70.959594),  Route carried "on" structure: Other road ,  Year Built: 2015,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 2,767 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,095 (year 2042),  Design Load: HL 93,  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: LINDEN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.260,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 64.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82008800076,  Location: 0.22MI RTE 111A (Lat: 42.984389,  Lng: -70.955978),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 2004,  Status: Posted for load,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 761 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,126 (year 2042),  Features Intersected: PAR,  Facility Carried by Structure: PARK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.415,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 11.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: November 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 82008900045,  Location: 0.3 MI FROM KENSINGTON TL (Lat: 42.961503,  Lng: -70.956219),  Route carried "on" structure: State highway 108,  Year Built: 1935,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 4,948 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,323 (year 2042),  Design Load: H 15,  Features Intersected: EXETER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.249,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.72m (12.20ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82009500063,  Location: .6 MI FROM JCT 101C (Lat: 42.972567,  Lng: -70.950961),  Route carried "on" structure: State highway 108,  Year Built: 2018,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 4,577 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,773 (year 2042),  Design Load: HL 93,  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.558,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.5m (34.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 70.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820098001,  Location: 1.5 MI NEWFIELDS TL (Lat: 43.001375,  Lng: -70.947100),  Route carried "on" structure: State highway 85,  Year Built: 1994,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 6,009 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,893 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NH101
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.401,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 22 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 23.3m (76.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.36m (17.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82010200074,  Location: 120FT RTE 108 (Lat: 42.981744,  Lng: -70.945697),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 1,521 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,251 (year 2042),  Design Load: H 10,  Features Intersected: SQUAMSCOTT RIVER,  Facility Carried by Structure: STRING BRIDGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.055,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 820102001,  Location: 0.2 MI E JCT NH 85 (Lat: 43.000614,  Lng: -70.943872),  Route carried "on" structure: State highway 101,  Year Built: 1998,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 24,288 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 35,946 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: PAR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 137.689,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.3m (66.6ft),  Out-to-Out Width: 22.0m (72.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 81.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 82010200101,  Location: 0.2 MI E JCT NH 85 (Lat: 43.000914,  Lng: -70.943753),  Route carried "on" structure: State highway 101,  Year Built: 1994,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 24,389 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 36,095 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: PAR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.603,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.5m (83.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 80.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82010300073,  Location: .1 MI FROM JCT RT 101C (Lat: 42.980842,  Lng: -70.943992),  Route carried "on" structure: State highway 108,  Year Built: 1934,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 14,767 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,855 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: EXETER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.330,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 67.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: June 2015,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82010300074,  Location: 0.05MI RTE 108 (Lat: 42.982072,  Lng: -70.945311),  Route carried "on" structure: City street ,  Year Built: 1935,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 1,521 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,251 (year 2042),  Design Load: H 10,  Features Intersected: SQUAMSCOTT RIVER,  Facility Carried by Structure: STRING BRIDGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.101,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 820106001,  Location: At Stratham Town Line (Lat: 42.999956,  Lng: -70.939847),  Route carried "on" structure: State highway 101,  Year Built: 1998,  Status: Open,  Structure Length: 26.82m (87.99ft),  Average Daily Traffic: 22,736 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 33,649 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: SQUAMSCOTT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 138.095,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 47.5m (155.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 26.82m (87.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 820107001,  Location: 0.3 MI E JCT NH 85 (Lat: 43.000122,  Lng: -70.939808),  Route carried "on" structure: State highway 101,  Year Built: 1994,  Status: Open,  Structure Length: 26.82m (87.99ft),  Average Daily Traffic: 22,974 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 34,001 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: SQUAMSCOTT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.197,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 47.6m (156.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.82m (87.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82013800068,  Location: 1.1 MI FROM HAMPTON TL (Lat: 42.977833,  Lng: -70.907369),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 2,557 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,784 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NH101,  Facility Carried by Structure: GUINEA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.295,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 84.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8201560006,  Location: .2 MI FROM HAMPTON TL (Lat: 42.970947,  Lng: -70.893111),  Route carried "on" structure: State highway 101,  Year Built: 2000,  Status: Open,  Structure Length: 4.68m (15.35ft),  Average Daily Traffic: 20,348 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 30,115 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NH111
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 143.140,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.6m (149.6ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.68m (15.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82015600061,  Location: .2 mi Hampton TL (Lat: 42.970997,  Lng: -70.892758),  Route carried "on" structure: State highway 101,  Year Built: 2000,  Status: Open,  Structure Length: 4.68m (15.35ft),  Average Daily Traffic: 20,066 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 29,697 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NH111
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.128,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.6m (149.6ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 4.68m (15.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82005800106,  Location: 0.6MI W NH 27 OVERPASS (Lat: 43.005969,  Lng: -70.987031),  Route carried "under" structure: ServiceOther road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 35 (year 1999),  Truck Traffic: 1%,  Features Intersected: CONNOR FARM ROAD,  Facility Carried by Structure: NH101 EB
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 6.7m (22.0ft)

Find on map >>   Show street view

Structure Number: 82005800107,  Location: 0.6MI W NH 27 OVERPASS (Lat: 43.006153,  Lng: -70.986875),  Route carried "under" structure: ServiceOther road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 35 (year 1999),  Truck Traffic: 1%,  Features Intersected: CONNOR FARM ROAD,  Facility Carried by Structure: NH101 WB
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 1000.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 6.7m (22.0ft)

Find on map >>   Show street view

Structure Number: 82006800102,  Location: JCT NH 27/NH101 (Lat: 43.001619,  Lng: -70.976167),  Route carried "under" structure: State highway 101,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 21,500 (year 2015),  Truck Traffic: 3%,  Features Intersected: NH101,  Facility Carried by Structure: NH 27
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 820098001,  Location: 1.5 MI NEWFIELDS TL (Lat: 43.001375,  Lng: -70.947100),  Route carried "under" structure: State highway 101,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 48,000 (year 2015),  Truck Traffic: 7%,  Features Intersected: NH101,  Facility Carried by Structure: NH 85
Minimum Vertical Clearance: 5.88m (19.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 82013800068,  Location: 1.1 MI FROM HAMPTON TL (Lat: 42.977833,  Lng: -70.907369),  Route carried "under" structure: State highway 101,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 43,525 (year 2015),  Features Intersected: NH101,  Facility Carried by Structure: GUINEA ROAD
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 8201560006,  Location: .2 MI FROM HAMPTON TL (Lat: 42.970947,  Lng: -70.893111),  Route carried "under" structure: Alternate State highway 111,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: NH111,  Facility Carried by Structure: NH101 EB
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.500,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.6m (149.6ft)

Find on map >>   Show street view

Structure Number: 82015600061,  Location: .2 mi Hampton TL (Lat: 42.970997,  Lng: -70.892758),  Route carried "under" structure: Alternate State highway 111,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2015),  Truck Traffic: 7%,  Features Intersected: NH111,  Facility Carried by Structure: NH101 WB
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 3.138,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.6m (149.6ft)

Discuss Exeter, New Hampshire (NH) on our hugely popular New Hampshire forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.