Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fort Mill, South Carolina (SC)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 31Number of bridges
  • 433ft / 132mTotal length
  • $5,301,000Total costs
  • 847,700Total average daily traffic
  • 82,033Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fort Mill
  • No street view available for this location

New bridges in Fort Mill, SC - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 11950-1959
  • 141970-1979
  • 21980-1989
  • 51990-1999
  • 22000-2009
  • 42010-2019
  • 12020-2022
Reconstructed bridges in Fort Mill, SC - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Fort Mill, SC
Average Bridge Truck Traffic in Fort Mill, SC
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.7%Excellent
  • 21.7%Very good
  • 26.1%Good
  • 21.7%Satisfactory
  • 21.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 13.0%Excellent
  • 30.4%Very good
  • 17.4%Good
  • 21.7%Satisfactory
  • 17.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.0%Excellent
  • 26.1%Very good
  • 26.1%Good
  • 30.4%Satisfactory
  • 4.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Good
  • 22.2%Satisfactory
  • 5.6%Fair
  • 5.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 1158,  Location: TOWN OF FORT MILL (Lat: 35.009422,  Lng: -80.944769),  Route carried "on" structure: State highway 1442,  Year Built: 1940,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 10,900 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,497 (year 2040),  Design Load: HS 15,  Features Intersected: RR NS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.166,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.3m (30.5ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $286,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $429,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1276,  Location: 9.8 MI N ROCK HILL (Lat: 35.044747,  Lng: -80.941139),  Route carried "on" structure: US 21,  Year Built: 1942,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 6,900 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,039 (year 2041),  Design Load: HS 15,  Features Intersected: STEEL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.380,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 22.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $734,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $1,101,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2278,  Location: 0.8 MI W FORT MILL (Lat: 35.006344,  Lng: -80.959056),  Route carried "on" structure: State highway 100,  Year Built: 1955,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,800 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,724 (year 2040),  Design Load: H 10,  Features Intersected: DYE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.406,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 16.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $225,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2769,  Location: 12.8MI N VAN WYCK (Lat: 35.040953,  Lng: -80.891878),  Route carried "on" structure: State highway 64,  Year Built: 2014,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 6,500 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,715 (year 2040),  Design Load: HL 93,  Features Intersected: MCALPINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.120,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6205,  Location: 1.8 MI SW FORT MILL (Lat: 34.998206,  Lng: -80.976131),  Route carried "on" structure: State highway 49,  Year Built: 1972,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 10,600 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 14,098 (year 2040),  Design Load: HS 20,  Features Intersected: I-77
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 0.908,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.38m (24.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6206,  Location: 2.7 MI N FORT MILL (Lat: 35.043169,  Lng: -80.959639),  Route carried "on" structure: State highway 252,  Year Built: 1972,  Status: Open,  Structure Length: 7.44m (24.41ft),  Average Daily Traffic: 2,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,200 (year 2040),  Design Load: HS 15,  Features Intersected: I-77
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 1.550,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6396,  Location: 6.9 MI N OF ROCK HILL (Lat: 35.009444,  Lng: -80.970556),  Route carried "on" structure: Interstate 77,  Year Built: 1973,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 105,900 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 148,260 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: S-46-100
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 135.211,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.9m (130.9ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 39.6m (129.9ft),  Out-to-Out Width: 41.2m (135.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Other Special Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6397,  Location: 11.0 MI N OF ROCK HILL (Lat: 35.070278,  Lng: -80.948889),  Route carried "on" structure: Interstate 77,  Year Built: 1973,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 111,500 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 156,100 (year 2040),  Design Load: H 20,  Features Intersected: STEEL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 142.419,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Out-to-Out Width: 45.7m (149.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020
Find on map >>   Show street view

Structure Number: 6408,  Location: 1.8 MI NW OF FORT MILL (Lat: 35.028056,  Lng: -80.965000),  Route carried "on" structure: State highway 160,  Year Built: 1973,  Status: Open,  Structure Length: 8.02m (26.31ft),  Average Daily Traffic: 30,200 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 39,562 (year 2040),  Design Load: HS 20,  Features Intersected: I-77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.252,  Lanes on structure: 5,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 22 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 26.4m (86.6ft),  Out-to-Out Width: 27.3m (89.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 24.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.02m (26.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 641,  Location: 10.2 MI N ROCK HILL (Lat: 35.061111,  Lng: -80.956111),  Route carried "on" structure: State highway 460,  Year Built: 1973,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 11,300 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,029 (year 2040),  Design Load: HS 20,  Features Intersected: I-77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.637,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 20.3m (66.6ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.05m (26.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6527,  Location: 10.8MI N VANWYCK (Lat: 35.012481,  Lng: -80.893617),  Route carried "on" structure: State highway 42,  Year Built: 1974,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 8,000 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,640 (year 2041),  Design Load: H 15,  Features Intersected: CLEMS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.797,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 27.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $404,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6828,  Location: 1.8 MI E FORT MILL (Lat: 34.998372,  Lng: -80.914925),  Route carried "on" structure: State highway 1230,  Year Built: 1975,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,250 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,600 (year 2040),  Design Load: H 15,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.892,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 23.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7134,  Location: 17.7MI N LANCASTER (Lat: 34.971242,  Lng: -80.870847),  Route carried "on" structure: State highway 157,  Year Built: 1978,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,330 (year 2040),  Design Load: H 15,  Features Intersected: BR OF SUGAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.759,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7632,  Location: 2.8 MI NW FORT MILL (Lat: 35.044053,  Lng: -80.971406),  Route carried "on" structure: State highway 22,  Year Built: 1982,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 8,100 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,773 (year 2040),  Design Load: H 15,  Features Intersected: JACKSON BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.278,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 23.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $153,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $230,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7807,  Location: 6.5MI N VAN WYCK (Lat: 34.950653,  Lng: -80.868494),  Route carried "on" structure: State highway 41,  Year Built: 1984,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 8,700 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,571 (year 2040),  Design Load: HS 15,  Features Intersected: SUGAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.788,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.36m (33.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85,  Location: 4.3 MI N FORT MILL (Lat: 35.068275,  Lng: -80.959419),  Route carried "on" structure: State highway 22,  Year Built: 1991,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 8,900 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 11,837 (year 2040),  Design Load: HS 20,  Features Intersected: BULLOCKS CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.245,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9385,  Location: 1.9 MI NE FORT MILL (Lat: 35.023350,  Lng: -80.917933),  Route carried "on" structure: State highway 460,  Year Built: 1998,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 16,800 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 22,344 (year 2040),  Design Load: HS 20,  Features Intersected: JACKSON BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.783,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.79m (19.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9441,  Location: YORK CO LN (Lat: 35.005739,  Lng: -80.902242),  Route carried "on" structure: State highway 160,  Year Built: 1999,  Status: Open,  Structure Length: 14.33m (47.01ft),  Average Daily Traffic: 15,100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 20,234 (year 2040),  Design Load: HS 20,  Features Intersected: BIG SUGAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 56.4m (185.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.33m (47.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9476,  Location: 1.7 MI S OF FORT MILL (Lat: 34.994017,  Lng: -80.966056),  Route carried "on" structure: Business US 21,  Year Built: 1999,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 8,000 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,400 (year 2040),  Design Load: HS 20,  Features Intersected: DYE BRANCH-FT.MILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 36.6m (120.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 84.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.77m (2.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 9481,  Location: 2.3 MI E FORT MILL (Lat: 35.002911,  Lng: -80.904458),  Route carried "on" structure: State highway 293,  Year Built: 1999,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,750 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,328 (year 2040),  Design Load: HS 20,  Features Intersected: BR TO SUGAR CREEK,  Facility Carried by Structure: S-46-253
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.067,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 27.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9592,  Location: 10.6 MI N ROCK HILL (Lat: 35.063261,  Lng: -80.948414),  Route carried "on" structure: State highway 1726,  Year Built: 2001,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 4,600 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,118 (year 2040),  Design Load: HL 93,  Features Intersected: STEEL CREEK,  Facility Carried by Structure: S-46-98
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.03m (16.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 995,  Location: 3 MI NORTH OF FORT MILL (Lat: 35.055869,  Lng: -80.943606),  Route carried "on" structure: State highway 460,  Year Built: 2007,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 11,300 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,029 (year 2040),  Design Load: HL 93,  Features Intersected: STEELE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.273,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.33m (17.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10191,  Location: 2 MI S OF FORT MILL (Lat: 34.985414,  Lng: -80.948139),  Route carried "on" structure: State highway 460,  Year Built: 2013,  Status: Open,  Structure Length: 14.51m (47.60ft),  Average Daily Traffic: 13,500 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 28,485 (year 2040),  Design Load: HL 93,  Features Intersected: S-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.831,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 15.34m (50.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,941,000,  Roadway Improvement Cost: $485,000,  Total Project Cost: $2,912,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10192,  Location: 2 MI S OF FORT MILL (Lat: 34.982353,  Lng: -80.943806),  Route carried "on" structure: State highway 460,  Year Built: 2013,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 13,500 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 28,485 (year 2040),  Design Load: HL 93,  Features Intersected: MOONEY HILL BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.430,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10491,  Location: FORT MILL (Lat: 35.036264,  Lng: -80.930194),  Route carried "on" structure: Business US 21,  Year Built: 2020,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 2,100 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,793 (year 2040),  Design Load: HL 93,  Features Intersected: STEEL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.022,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6205,  Location: 1.8 MI SW FORT MILL (Lat: 34.998206,  Lng: -80.976131),  Route carried "under" structure: Interstate 77,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 105,100 (year 2020),  Truck Traffic: 19%,  Features Intersected: I-77,  Facility Carried by Structure: S-46-49
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 133.881,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 6206,  Location: 2.7 MI N FORT MILL (Lat: 35.043169,  Lng: -80.959639),  Route carried "under" structure: Interstate 77,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 103,900 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-77,  Facility Carried by Structure: S-46-252
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 139.160,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 6396,  Location: 6.9 MI N OF ROCK HILL (Lat: 35.009444,  Lng: -80.970556),  Route carried "under" structure: State highway 100,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 4,800 (year 2020),  Truck Traffic: 3%,  Features Intersected: S-46-100,  Facility Carried by Structure: I-77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.271,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 6408,  Location: 1.8 MI NW OF FORT MILL (Lat: 35.028056,  Lng: -80.965000),  Route carried "under" structure: Interstate 77,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 105,900 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-77,  Facility Carried by Structure: SC 160
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 137.358,  Lanes on structure: 5,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 641,  Location: 10.2 MI N ROCK HILL (Lat: 35.061111,  Lng: -80.956111),  Route carried "under" structure: Interstate 77,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 103,900 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-77,  Facility Carried by Structure: SC 460
Minimum Vertical Clearance: 6.30m (20.67ft),  Kilometerpoint: 141.156,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 10191,  Location: 2 MI S OF FORT MILL (Lat: 34.985414,  Lng: -80.948139),  Route carried "under" structure: State highway 65,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 2,400 (year 2020),  Truck Traffic: 5%,  Features Intersected: S-65,  Facility Carried by Structure: SC 460
Minimum Vertical Clearance: 7.44m (24.41ft),  Kilometerpoint: 2.412,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.2m (154.9ft)

Discuss Fort Mill, South Carolina (SC) on our hugely popular South Carolina forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.