Bridge Statistics for Henry Fork, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 92ft / 27.8mTotal length
  • $19,169,000Total costs
  • 77,417Total average daily traffic
  • 8,497Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Henry Fork
  • No street view available for this location

New bridges in Henry Fork, VA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 21950-1959
  • 51960-1969
  • 22010-2019
Average Bridge Daily Traffic in Henry Fork, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 50.0%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 37.5%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 37.5%Good
  • 50.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 16.7%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 7776,  Location: 0.90 RT 755; 0.10 RT 1085 (Lat: 36.930136,  Lng: -79.872906),  Route carried "on" structure: US 220,  Year Built: 1929,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 7,211 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 10,095 (year 2040),  Design Load: H 15,  Features Intersected: N Fork Chestnut Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.877,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $241,000,  Total Project Cost: $2,309,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7777,  Location: 0.02 RT 756; 0.89 RT 724 (Lat: 36.904103,  Lng: -79.866792),  Route carried "on" structure: US 220,  Year Built: 1929,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 7,211 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 10,095 (year 2040),  Design Load: H 15,  Features Intersected: SFork Little Chestnut Cr
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.668,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7786,  Location: 1.69 RKYMT; 0.06 220 BP (Lat: 36.962939,  Lng: -79.873694),  Route carried "on" structure: Business US 220,  Year Built: 1960,  Status: Open,  Structure Length: 7.91m (25.95ft),  Average Daily Traffic: 2,447 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,426 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 220 Bypass
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.643,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.4m (76.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7889,  Location: 0.10 Rt 1021; 0.06 Rt 220 (Lat: 36.965881,  Lng: -79.873256),  Route carried "on" structure: County highway 674,  Year Built: 1961,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 2,924 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,410 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 220 BP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.94m (16.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,371,000,  Roadway Improvement Cost: $843,000,  Total Project Cost: $10,787,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7962,  Location: 0.40 RT 619; 0.98 RT 929 (Lat: 36.925800,  Lng: -79.901300),  Route carried "on" structure: County highway 756,  Year Built: 1969,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 312 (year 2017),  Average Future Daily Traffic: 348 (year 2040),  Design Load: HL 93,  Features Intersected: N F Little Chestnut Crk
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.024,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.1m (26.6ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.81m (2.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,275,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7995,  Location: 0.02 RT 724; 1.25 RT 220 (Lat: 36.904239,  Lng: -79.849550),  Route carried "on" structure: County highway 827,  Year Built: 1932,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 171 (year 2014),  Average Future Daily Traffic: 260 (year 2040),  Features Intersected: SFof Little Chestnut Crk
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.494,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 8028,  Location: 1.30 Rt 674; 0.00 Rt 1007 (Lat: 36.983131,  Lng: -79.871308),  Route carried "on" structure: County highway 1019,  Year Built: 1959,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 609 (year 2017),  Average Future Daily Traffic: 767 (year 2040),  Design Load: HL 93,  Features Intersected: 220 Bypass
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.478,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.79m (19.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,476,000,  Roadway Improvement Cost: $369,000,  Total Project Cost: $4,798,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 29919,  Location: 0.0 RT 674; 0.60 RT 721 (Lat: 36.969872,  Lng: -79.821800),  Route carried "on" structure: County highway 707,  Year Built: 2015,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 262 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 315 (year 2040),  Design Load: HL 93,  Features Intersected: DOE RUN
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 30182,  Location: 1.38-RT 40; 1.76-RT 220 (Lat: 36.984111,  Lng: -79.886947),  Route carried "on" structure: Business Other road 220,  Year Built: 2013,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 4,894 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,383 (year 2040),  Design Load: HL 93,  Features Intersected: PIGG RIVER
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 5.744,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7786,  Location: 1.69 RKYMT; 0.06 220 BP (Lat: 36.962939,  Lng: -79.873694),  Route carried "under" structure: Bypass US 220,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 16,688 (year 2008),  Truck Traffic: 12%,  Features Intersected: 220 Bypass
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 59.034,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.4m (76.8ft)

Find on map >>   Show street view

Structure Number: 7889,  Location: 0.10 Rt 1021; 0.06 Rt 220 (Lat: 36.965881,  Lng: -79.873256),  Route carried "under" structure: Bypass US 220,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 16,688 (year 2008),  Truck Traffic: 12%,  Features Intersected: RTE 220 BP,  Facility Carried by Structure: DOE RUN ROAD 674
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 59.308,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 8028,  Location: 1.30 Rt 674; 0.00 Rt 1007 (Lat: 36.983131,  Lng: -79.871308),  Route carried "under" structure: Bypass US 220,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 18,000 (year 2013),  Truck Traffic: 13%,  Features Intersected: 220 Bypass,  Facility Carried by Structure: Tripple Crk Rd1019
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 61.239,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Length of Maximum Span: 13.4m (44.0ft)

Discuss Henry Fork, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.