Bridge Statistics for Lake Stevens, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 627ft / 191mTotal length
  • $106,185,000Total costs
  • 171,996Total average daily traffic
  • 11,741Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lake Stevens
  • No street view available for this location

New bridges in Lake Stevens, WA - historical statistics
  • New bridges - historical statistics
  • 31960-1969
  • 11970-1979
  • 11980-1989
  • 171990-1999
  • 22000-2009
Average Bridge Daily Traffic in Lake Stevens, WA
Average Bridge Truck Traffic in Lake Stevens, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.3%Very good
  • 68.4%Good
  • 26.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.8%Very good
  • 52.6%Good
  • 26.3%Satisfactory
  • 5.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 26.3%Very good
  • 52.6%Good
  • 10.5%Satisfactory
  • 10.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 35.3%Very good
  • 23.5%Good
  • 41.2%Satisfactory
Find on map >>   Show street view

Structure Number: 7923B,  Location: 1.9 E JCT I-5 (Lat: 47.978331,  Lng: -122.146389),  Route carried "on" structure: Ramp US 2,  Year Built: 1967,  Status: Open,  Structure Length: 15.09m (49.51ft),  Average Daily Traffic: 262 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 379 (year 2039),  Design Load: HS 20,  Features Intersected: EBEY SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.09m (49.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,168,000,  Roadway Improvement Cost: $634,000,  Total Project Cost: $6,336,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8176B,  Location: JCT US 2 (Lat: 47.978944,  Lng: -122.137944),  Route carried "on" structure: Ramp State highway 204,  Year Built: 1967,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 14,221 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,592 (year 2039),  Design Load: HS 20,  Features Intersected: EBEY SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.16m (20.21ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $1,212,000,  Roadway Improvement Cost: $242,000,  Total Project Cost: $2,424,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 13995B,  Location: 2.3 E JCT I-5 (Lat: 47.977833,  Lng: -122.142111),  Route carried "on" structure: US 2,  Year Built: 1993,  Status: Open,  Structure Length: 40.17m (131.79ft),  Average Daily Traffic: 15,159 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 21,950 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: EBEY SLOUGH DRAINAGE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.637,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 15,  Length of Maximum Span: 52.7m (172.9ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 40.17m (131.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $10,544,000,  Roadway Improvement Cost: $2,109,000,  Total Project Cost: $21,088,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13995C,  Location: 2.2 E JCT I-5 (Lat: 47.978000,  Lng: -122.142028),  Route carried "on" structure: Ramp US 2,  Year Built: 1993,  Status: Open,  Structure Length: 28.62m (93.90ft),  Average Daily Traffic: 25,549 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 36,994 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: EBEY SLOUGH DRAINAGE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 7,  Length of Maximum Span: 50.6m (166.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 28.62m (93.90ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $7,888,000,  Roadway Improvement Cost: $1,578,000,  Total Project Cost: $15,775,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13995D,  Location: 2.4 E JCT I-5 (Lat: 47.977833,  Lng: -122.138250),  Route carried "on" structure: Ramp US 2,  Year Built: 1993,  Status: Open,  Structure Length: 14.11m (46.29ft),  Average Daily Traffic: 16,937 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 24,524 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: US 2 WB, SR 204, RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.772,  Lanes on structure: 1,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.11m (46.29ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $4,167,000,  Roadway Improvement Cost: $833,000,  Total Project Cost: $8,334,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13995E,  Location: 2.4 E JCT I-5 (Lat: 47.977708,  Lng: -122.138167),  Route carried "on" structure: Ramp US 2,  Year Built: 1993,  Status: Open,  Structure Length: 14.17m (46.49ft),  Average Daily Traffic: 8,614 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,473 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: US 2 WB, SR 204
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 52.4m (171.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 14.17m (46.49ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $2,604,000,  Roadway Improvement Cost: $521,000,  Total Project Cost: $5,208,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14428B,  Location: 2.0 E JCT I-5 (Lat: 47.978250,  Lng: -122.144461),  Route carried "on" structure: ServiceUS 2,  Year Built: 1995,  Status: Open,  Structure Length: 28.96m (95.01ft),  Average Daily Traffic: 200 (year 2002),  Average Future Daily Traffic: 275 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: EBEY SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.320,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 28.96m (95.01ft),  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2018,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $5,130,000,  Roadway Improvement Cost: $1,026,000,  Total Project Cost: $10,260,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 81015,  Location: 1.5 S JCT SR 92 (Lat: 48.012350,  Lng: -122.047761),  Route carried "on" structure: County highway 94780,  Year Built: 1977,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 5,935 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 7,500 (year 2041),  Design Load: HS 15,  Features Intersected: LITTLE PILCHUCK CREEK,  Facility Carried by Structure: NORTH MACHIAS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,155,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 81976,  Location: 2.0 S JCT SR 92 (Lat: 48.007694,  Lng: -122.046242),  Route carried "on" structure: Spur County highway 43640,  Year Built: 1985,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 27 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 75 (year 2043),  Design Load: HS 15,  Features Intersected: LITTLE PILCHUCK CREEK,  Facility Carried by Structure: 12TH ST NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $608,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,216,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 8445,  Location: 0.2 W JCT SR 92 (Lat: 48.036053,  Lng: -122.053375),  Route carried "on" structure: County highway 49500,  Year Built: 1961,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,013 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,500 (year 2041),  Design Load: H 15,  Features Intersected: LITTLE PILCHUCK CREEK,  Facility Carried by Structure: 44TH ST NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $760,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,520,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 86046,  Location: 0.01 S North Lksh Dr (Lat: 48.014836,  Lng: -122.064108),  Route carried "on" structure: City street 660,  Year Built: 1993,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 6,150 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,000 (year 2039),  Design Load: HS 20,  Features Intersected: LAKE STEVENS OUTFLOW,  Facility Carried by Structure: 124TH AVE NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $775,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $1,550,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86047,  Location: 0.01 E JCT HARTFORD DR (Lat: 48.015533,  Lng: -122.063372),  Route carried "on" structure: City street 660,  Year Built: 1993,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 3,900 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,000 (year 2039),  Design Load: HS 20,  Features Intersected: LAKE STEVENS OUTFLOW,  Facility Carried by Structure: 20TH STREET NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $420,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86113,  Location: 1.6 MI NE JCT SR 9 (Lat: 47.986767,  Lng: -122.077794),  Route carried "on" structure: County highway 664,  Year Built: 1995,  Status: Open,  Structure Length: 12.62m (41.40ft),  Average Daily Traffic: 4,838 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,500 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SO END LAKE STEVENS,  Facility Carried by Structure: SO LK STEVENS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.92m (42.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $6,445,000,  Roadway Improvement Cost: $1,289,000,  Total Project Cost: $12,890,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86201,  Location: 3.1 S JCT SR92 (Lat: 48.007467,  Lng: -122.033625),  Route carried "on" structure: County highway 49502,  Year Built: 1996,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 773 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,200 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: PILCHUCK RIVER,  Facility Carried by Structure: RUSSELL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.80m (22.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,390,000,  Roadway Improvement Cost: $678,000,  Total Project Cost: $6,779,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86264,  Location: 2.4 E JCT SR 9 (Lat: 48.032139,  Lng: -122.058250),  Route carried "on" structure: State highway 92,  Year Built: 1996,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 12,955 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 18,758 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: CENTENNIAL TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.895,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $967,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $1,934,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86276,  Location: 1.9 S JCT SR 92 (Lat: 48.011758,  Lng: -122.052800),  Route carried "on" structure: City street 43600,  Year Built: 1998,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 1,060 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,500 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: CATHERINE CREEK,  Facility Carried by Structure: 16TH ST NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 91.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 54.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,064,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86277,  Location: 0.38 E JCT 124TH AV NE (Lat: 48.015444,  Lng: -122.055694),  Route carried "on" structure: City street 660,  Year Built: 1997,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 3,200 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,000 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: CATHERINE CREEK,  Facility Carried by Structure: 20TH ST NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $364,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $728,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86559,  Location: 0.7 NE JCT SR9 (Lat: 48.010994,  Lng: -122.102781),  Route carried "on" structure: City street 94748,  Year Built: 2001,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 6,050 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,000 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: WETLAND @ N LAKE STEVENS,  Facility Carried by Structure: VERNON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.7m (140.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.53m (27.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,904,000,  Roadway Improvement Cost: $381,000,  Total Project Cost: $3,808,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 86632,  Location: 0.7 S JCT SR92 (Lat: 48.025444,  Lng: -122.064900),  Route carried "on" structure: City street 664,  Year Built: 1998,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,500 (year 2039),  Design Load: HS 20,  Features Intersected: CATHERINE CREEK,  Facility Carried by Structure: CATHERINE DR
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $252,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $504,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 86829,  Location: 1.7 S JCT SR 92 (Lat: 48.011703,  Lng: -122.048658),  Route carried "on" structure: County highway 664,  Year Built: 2002,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 1,909 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,000 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: LITTLE PILCHUCK CREEK,  Facility Carried by Structure: 16TH ST NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,596,000,  Roadway Improvement Cost: $319,000,  Total Project Cost: $3,192,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 13995D,  Location: JCT US 2 (Lat: 47.977833,  Lng: -122.138250),  Route carried "under" structure: State highway 204,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 5,963 (year 2019),  Truck Traffic: 4%,  Features Intersected: US 2 WB, SR 204, RAMPS,  Facility Carried by Structure: US 2 RAMP
Minimum Vertical Clearance: 15.24m (50.00ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 13995D,  Location: JCT SR 204 (Lat: 47.977833,  Lng: -122.138250),  Route carried "under" structure: US 2,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 15,159 (year 2019),  Truck Traffic: 9%,  Features Intersected: US 2 WB, SR 204, RAMPS
Minimum Vertical Clearance: 6.27m (20.57ft),  Kilometerpoint: 3.862,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 13995E,  Location: JCT US 2 (Lat: 47.977708,  Lng: -122.138167),  Route carried "under" structure: State highway 204,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 5,963 (year 2019),  Truck Traffic: 4%,  Features Intersected: US 2 WB, SR 204,  Facility Carried by Structure: US 2 RAMP
Minimum Vertical Clearance: 17.37m (56.99ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 52.4m (171.9ft)

Find on map >>   Show street view

Structure Number: 13995E,  Location: JCT SR 204 (Lat: 47.977708,  Lng: -122.138167),  Route carried "under" structure: US 2,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 15,159 (year 2019),  Truck Traffic: 9%,  Features Intersected: US 2 WB, SR 204
Minimum Vertical Clearance: 7.32m (24.02ft),  Kilometerpoint: 3.879,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 52.4m (171.9ft)