Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Maxwell, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 157ft / 48.3mTotal length
  • $1,491,000Total costs
  • 85,452Total average daily traffic
  • 29,818Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Maxwell
  • No street view available for this location

New bridges in Maxwell, NM - historical statistics
  • New bridges - historical statistics
  • 41940-1949
  • 11950-1959
  • 131960-1969
  • 21970-1979
Reconstructed bridges in Maxwell, NM - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 21980-1989
  • 01990-1999
  • 22000-2009
Average Bridge Daily Traffic in Maxwell, NM
Average Bridge Truck Traffic in Maxwell, NM
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Good
  • 85.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 42.9%Good
  • 42.9%Satisfactory
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Good
  • 33.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 44.4%Good
  • 44.4%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 384,  Location: 9.90 MI N OF JCT US-60 (Lat: 34.781444,  Lng: -105.549694),  Route carried "on" structure: US 285,  Year Built: 1940,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 5.40m (17.72ft),  Average Daily Traffic: 2,770 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 2,206 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 373.931,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $136,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $204,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 3841,  Location: 10.60 MI N OF JCT US-60 (Lat: 34.791242,  Lng: -105.555439),  Route carried "on" structure: US 285,  Year Built: 1940,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 2,770 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 2,206 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 374.977,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $95,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $143,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 4948,  Location: 3.0 MI N OF JCT NM-505 (Lat: 36.586656,  Lng: -104.541969),  Route carried "on" structure: State highway 445,  Year Built: 1942,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 219 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 162 (year 2040),  Design Load: H 15,  Features Intersected: IRRIGATION CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.847,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $99,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $149,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 4982,  Location: 10.0 MI N SPRINGER N INTR (Lat: 36.522086,  Lng: -104.551250),  Route carried "on" structure: Interstate 25,  Year Built: 1941,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 5,727 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 9,804 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 683.805,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 5784,  Location: 4.5 MI W OF JCT US-285 (Lat: 35.004133,  Lng: -105.730539),  Route carried "on" structure: Interstate 40,  Year Built: 1956,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 16,929 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 28,980 (year 2040),  Design Load: HS 20,  Features Intersected: OSITA DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 345.159,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $217,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $325,000 ( Estimate for 2030),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6682,  Location: 0.5 MI E OF I-25/ MAXWELL (Lat: 36.533864,  Lng: -104.531450),  Route carried "on" structure: County highway 7007,  Year Built: 1963,  Status: Open,  Structure Length: 8.14m (26.71ft),  Average Daily Traffic: 109 (year 2020),  Average Future Daily Traffic: 181 (year 2040),  Design Load: HS 20,  Features Intersected: CANADIAN RIVER,  Facility Carried by Structure: C.R. 07-A007
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.0m (16.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.14m (26.71ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2019,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $261,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7016,  Location: 17.3 MI N OF JCT US-56 (Lat: 36.596533,  Lng: -104.529478),  Route carried "on" structure: Interstate 25,  Year Built: 1969,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 5,319 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 9,752 (year 2040),  Design Load: HS 20,  Features Intersected: CURTIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 692.327,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7017,  Location: 17.3 MI N OF JCT US-56 (Lat: 36.596725,  Lng: -104.529886),  Route carried "on" structure: Interstate 25,  Year Built: 1969,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 5,319 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 9,752 (year 2040),  Design Load: HS 20,  Features Intersected: CURTIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 692.329,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 702,  Location: JCT I-25/NM-455/MAXWELL (Lat: 36.540033,  Lng: -104.539261),  Route carried "on" structure: Interstate 25,  Year Built: 1969,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 5,954 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 10,194 (year 2040),  Design Load: HS 20,  Features Intersected: NM-445
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 685.777,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 7021,  Location: JCT I-25/NM-445/MAXWELL (Lat: 36.540031,  Lng: -104.539494),  Route carried "on" structure: Interstate 25,  Year Built: 1969,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 5,954 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 10,194 (year 2040),  Design Load: HS 20,  Features Intersected: NM-445
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 685.777,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 7071,  Location: 13.0 MI N OF JCT US-56 (Lat: 36.535394,  Lng: -104.540947),  Route carried "on" structure: Interstate 25,  Year Built: 1969,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 6,460 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 9,599 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: LOCAL COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 685.305,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Culverts: Good,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $273,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $409,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 7072,  Location: 16.2 MI N OF JCT US-56 (Lat: 36.580975,  Lng: -104.535231),  Route carried "on" structure: Interstate 25,  Year Built: 1969,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 5,319 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 9,752 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LOCAL COUNTY ROAD
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 690.313,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Culverts: Good,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018
Find on map >>   Show street view

Structure Number: 7101,  Location: 9.7 MI N OF NM-21/SPRINGR (Lat: 36.496522,  Lng: -104.571022),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 5,727 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 9,804 (year 2040),  Design Load: HS 20,  Features Intersected: VERMEJO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 680.141,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7102,  Location: 9.7 MI N OF JCT NM-21 (Lat: 36.496806,  Lng: -104.571258),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 5,727 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 9,804 (year 2040),  Design Load: HS 20,  Features Intersected: VERMEJO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 680.152,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7217,  Location: 16.9 MI N OF JCT US-56 (Lat: 36.591092,  Lng: -104.533167),  Route carried "on" structure: Interstate 25,  Year Built: 1969,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 5,319 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 9,752 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 691.480,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 7233,  Location: 13.8 MI N OF JCT US-56 (Lat: 36.547428,  Lng: -104.538361),  Route carried "on" structure: Interstate 25,  Year Built: 1969,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 5,319 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 9,752 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 686.947,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2018
Find on map >>   Show street view

Structure Number: 702,  Location: JCT I-25/NM-455/MAXWELL (Lat: 36.540033,  Lng: -104.539261),  Route carried "under" structure: State highway 445,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 219 (year 2020),  Truck Traffic: 16%,  Features Intersected: NM-445,  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.9m (39.0ft)

Find on map >>   Show street view

Structure Number: 7021,  Location: JCT I-25/NM-445/MAXWELL (Lat: 36.540031,  Lng: -104.539494),  Route carried "under" structure: State highway 445,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 219 (year 2020),  Truck Traffic: 16%,  Features Intersected: NM-445,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.9m (39.0ft)

Find on map >>   Show street view

Structure Number: 7071,  Location: 13.0 MI N OF JCT US-56 (Lat: 36.535394,  Lng: -104.540947),  Route carried "under" structure: City street 7007,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 64 (year 2020),  Truck Traffic: 17%,  Features Intersected: LOCAL COUNTY ROAD,  Facility Carried by Structure: I-25 NBL/SBL
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.023,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 7.6m (24.9ft)

Find on map >>   Show street view

Structure Number: 7072,  Location: 16.2 MI N OF JCT US-56 (Lat: 36.580975,  Lng: -104.535231),  Route carried "under" structure: City street 7000,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 9 (year 2020),  Truck Traffic: 11%,  Features Intersected: LOCAL COUNTY ROAD,  Facility Carried by Structure: I-25 NBL/SBL
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.024,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 7.6m (24.9ft)

Discuss Maxwell, New Mexico (NM) on our hugely popular New Mexico forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.