Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Middlebourne, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 289ft / 88.4mTotal length
  • $4,624,000Total costs
  • 23,663Total average daily traffic
  • 1,827Total average daily truck traffic
  • 31,301Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Middlebourne
  • No street view available for this location

New bridges in Middlebourne, WV - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 21920-1929
  • 21950-1959
  • 11970-1979
  • 41980-1989
  • 71990-1999
  • 52000-2009
  • 32010-2019
Reconstructed bridges in Middlebourne, WV - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Middlebourne, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 73.9%Good
  • 13.0%Satisfactory
  • 4.3%Fair
  • 8.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 62.5%Good
  • 16.7%Satisfactory
  • 16.7%Fair
  • 4.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 45.8%Good
  • 20.8%Satisfactory
  • 20.8%Fair
  • 12.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.0%Very good
  • 44.0%Good
  • 24.0%Satisfactory
  • 20.0%Fair
  • 8.0%Poor
Find on map >>   Show street view

Structure Number: 48A006,  Location: 0.03 mi. East jct CR 7/10 (Lat: 39.454689,  Lng: -80.921411),  Route carried "on" structure: County highway 63,  Year Built: 1950,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 150 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 183 (year 2039),  Features Intersected: Little Sancho Creek,  Facility Carried by Structure: County Route 6/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.097,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.3m (27.2ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $92,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $185,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 48A009,  Location: 0.08 mi. South jct CR7/6 (Lat: 39.442900,  Lng: -80.912611),  Route carried "on" structure: County highway 7,  Year Built: 1990,  Status: Open,  Structure Length: 1.57m (5.15ft),  Average Daily Traffic: 350 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 473 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Sancho Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.727,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.35m (7.71ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $171,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $339,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A019,  Location: 0.04 mi. East jct WV 18 (Lat: 39.532569,  Lng: -80.890869),  Route carried "on" structure: County highway 11,  Year Built: 1918,  Status: Posted for load,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 500 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 610 (year 2039),  Features Intersected: Point Pleasant Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $244,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $671,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: 48A037,  Location: 0.52 mi. South jct CR 11 (Lat: 39.531739,  Lng: -80.897389),  Route carried "on" structure: State highway 18,  Year Built: 1992,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 4,300 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,805 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Point Plesant Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.148,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A039,  Location: 0.15 mi. North jct CR18/5 (Lat: 39.541481,  Lng: -80.899969),  Route carried "on" structure: State highway 18,  Year Built: 1987,  Status: Open,  Structure Length: 1.69m (5.54ft),  Average Daily Traffic: 1,800 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,430 (year 2040),  Design Load: HS 20,  Features Intersected: Dry Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.466,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $54,000,  Total Project Cost: $54,000 ( Estimate for 2019),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 48A04,  Location: 0.01 mi. North jct CR18/2 (Lat: 39.536169,  Lng: -80.942289),  Route carried "on" structure: State highway 18,  Year Built: 1987,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 2,000 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,700 (year 2038),  Design Load: HS 20,  Features Intersected: Badger Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.891,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $32,000,  Total Project Cost: $32,000 ( Estimate for 2018),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A049,  Location: 0.01 mi. West jct WV18 (Lat: 39.489631,  Lng: -80.904969),  Route carried "on" structure: County highway 26,  Year Built: 1975,  Status: Open,  Structure Length: 10.79m (35.40ft),  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,215 (year 2039),  Design Load: HS 20,  Features Intersected: Middle Island Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.70m (35.10ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $287,000,  Total Project Cost: $287,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 48A051,  Location: 0.05 mi. East jct WV 180 (Lat: 39.551750,  Lng: -80.880339),  Route carried "on" structure: County highway 32,  Year Built: 1922,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 305 (year 2039),  Features Intersected: Point Pleasant Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.6m (44.6ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $249,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $684,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 48A058,  Location: 0.31 Mi. West Jct. WV 18 (Lat: 39.529431,  Lng: -80.924519),  Route carried "on" structure: County highway 184,  Year Built: 1996,  Status: Open,  Structure Length: 2.25m (7.38ft),  Average Daily Traffic: 150 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 183 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Pursley Creek,  Facility Carried by Structure: County Route 18/4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.134,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 30.78m (100.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $310,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A066,  Location: 0.06 mi. South jct CR6/3 (Lat: 39.451911,  Lng: -80.945081),  Route carried "on" structure: County highway 75,  Year Built: 1987,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 10 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 12 (year 2040),  Design Load: H 20,  Features Intersected: Little Sancho Creek,  Facility Carried by Structure: County Route 7/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.782,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $92,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $183,000 ( Estimate for 2019),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 48A068,  Location: 0.02 MI WEST JCT WV 18 (Lat: 39.532931,  Lng: -80.929461),  Route carried "on" structure: County highway 183,  Year Built: 1989,  Status: Open,  Structure Length: 1.24m (4.07ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 61 (year 2039),  Features Intersected: PURSLEY CREEK,  Facility Carried by Structure: COUNTY ROUTE 18/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $107,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $212,000 ( Estimate for 2020),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 48A071,  Location: 0.01 mile West jct WV18 (Lat: 39.518669,  Lng: -80.892911),  Route carried "on" structure: County highway 1820,  Year Built: 1993,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 500 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 610 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: POINT PLEASANT CREEK,  Facility Carried by Structure: County Route 18/20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2019,  Bridge Improvement Cost: $150,000,  Total Project Cost: $160,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A072,  Location: 0.01 mi. South jct WV 180 (Lat: 39.540100,  Lng: -80.889131),  Route carried "on" structure: County highway 116,  Year Built: 1993,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 550 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 671 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: Point Pleasant Creek,  Facility Carried by Structure: Count Route 11/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.660,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $70,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $85,000 ( Estimate for 2019),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A074,  Location: 0.03 Mi. North Jct. CR 11 (Lat: 39.534589,  Lng: -80.891211),  Route carried "on" structure: State highway 18,  Year Built: 1997,  Status: Open,  Structure Length: 2.63m (8.63ft),  Average Daily Traffic: 4,300 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,805 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: Pursley Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.178,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.4m (83.3ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A077,  Location: 0.05 mi. East jct CR18/6 (Lat: 39.521500,  Lng: -80.847119),  Route carried "on" structure: County highway 11,  Year Built: 1998,  Status: Open,  Structure Length: 1.82m (5.97ft),  Average Daily Traffic: 500 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 675 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Elk Fork
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.536,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $49,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $59,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A083,  Location: 0.07 mi. West jct CR 7 (Lat: 39.453931,  Lng: -80.916719),  Route carried "on" structure: County highway 63,  Year Built: 2000,  Status: Open,  Structure Length: 2.95m (9.68ft),  Average Daily Traffic: 150 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 183 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Sancho Creek,  Facility Carried by Structure: County Route 6/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.564,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.4m (93.2ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $336,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $887,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A084,  Location: 0.31 mi. East jct CR11/1 (Lat: 39.528450,  Lng: -80.854689),  Route carried "on" structure: County highway 11,  Year Built: 2000,  Status: Open,  Structure Length: 3.09m (10.14ft),  Average Daily Traffic: 450 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 765 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Elk Fork
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.120,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A087,  Location: 0.28 mi. South of CR18/20 (Lat: 39.515231,  Lng: -80.894911),  Route carried "on" structure: State highway 18,  Year Built: 2001,  Status: Open,  Structure Length: 5.59m (18.34ft),  Average Daily Traffic: 2,900 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,915 (year 2038),  Features Intersected: Point Pleasant Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.040,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A089,  Location: 0.27 mi. South jct CR 12 (Lat: 39.499281,  Lng: -80.958269),  Route carried "on" structure: County highway 101,  Year Built: 2002,  Status: Open,  Structure Length: 8.00m (26.25ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 244 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Middle Island Creek,  Facility Carried by Structure: County Route 10/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.794,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.5m (129.6ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A09,  Location: 0.23 mi. West jct CR 24/2 (Lat: 39.487081,  Lng: -80.933689),  Route carried "on" structure: County highway 24,  Year Built: 2002,  Status: Open,  Structure Length: 8.79m (28.84ft),  Average Daily Traffic: 383 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 467 (year 2037),  Features Intersected: Middle Island Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.255,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A101,  Location: 0.03 mi. South jct CR 24 (Lat: 39.503461,  Lng: -80.902111),  Route carried "on" structure: State highway 18,  Year Built: 2014,  Status: Open,  Structure Length: 5.14m (16.86ft),  Average Daily Traffic: 2,900 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,538 (year 2038),  Design Load: HL 93,  Features Intersected: Point Pleasant Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.237,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 69.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A102,  Location: 0.01 mi South jct WV 18 (Lat: 39.477261,  Lng: -80.851850),  Route carried "on" structure: County highway 187,  Year Built: 2014,  Status: Open,  Structure Length: 8.00m (26.25ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 61 (year 2039),  Design Load: HL 93,  Features Intersected: Middle Island Creek,  Facility Carried by Structure: County Route 18/7
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 6.051,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A105,  Location: .05 Miles south WVCR7/8 (Lat: 39.420089,  Lng: -80.948289),  Route carried "on" structure: County highway 700,  Year Built: 2017,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 366 (year 2040),  Design Load: HL 93,  Features Intersected: Sugar Run Creek,  Facility Carried by Structure: WV CR 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.909,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.6m (21.7ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 48A106,  Location: 0.01 mi. South jct CR 11 (Lat: 39.514739,  Lng: -80.790331),  Route carried "on" structure: County highway 36,  Year Built: 1924,  Year Reconstructed: 1974,  Status: Posted for load,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 10 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 12 (year 2040),  Features Intersected: Elk Fork
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.784,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.5m (8.2ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.96m (3.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $375,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 48A9,  Location: 0.01 mi. South jct WV 18 (Lat: 39.481850,  Lng: -80.869531),  Route carried "on" structure: Other road N0099,  Year Built: 1950,  Status: Posted for load,  Structure Length: 5.60m (18.37ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 12 (year 2039),  Features Intersected: Middle Island Creek,  Facility Carried by Structure: 4H Camp Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: Local Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 15.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.58m (18.31ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $101,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Middlebourne, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.