Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ruidoso, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 35Number of bridges
  • 148ft / 45.1mTotal length
  • $3,203,000Total costs
  • 87,893Total average daily traffic
  • 13,397Total average daily truck traffic
  • 101,376Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ruidoso
  • No street view available for this location

New bridges in Ruidoso, NM - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11940-1949
  • 21950-1959
  • 91960-1969
  • 41970-1979
  • 11980-1989
  • 11990-1999
  • 102000-2009
  • 52010-2019
Reconstructed bridges in Ruidoso, NM - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in Ruidoso, NM
Average Bridge Truck Traffic in Ruidoso, NM
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 31.3%Good
  • 31.3%Satisfactory
  • 25.0%Fair
  • 12.5%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Good
  • 25.0%Satisfactory
  • 31.3%Fair
  • 6.3%Poor
  • 12.5%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Good
  • 37.5%Satisfactory
  • 18.8%Fair
  • 6.3%Poor
  • 12.5%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.9%Excellent
  • 11.8%Very good
  • 38.2%Good
  • 29.4%Satisfactory
  • 11.8%Fair
  • 2.9%Imminent failure
  • 2.9%Failed
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 36.8%Good
  • 57.9%Satisfactory
  • 5.3%Fair
Find on map >>   Show street view

Structure Number: 3219,  Location: 5.1 MI E OF NM-48/CAPITAN (Lat: 33.519889,  Lng: -105.494864),  Route carried "on" structure: US 380,  Year Built: 1935,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 822 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,194 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 145.205,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2020
Find on map >>   Show street view

Structure Number: 322,  Location: 6.0 M E JCT NM-48/CAPITAN (Lat: 33.518611,  Lng: -105.481061),  Route carried "on" structure: US 380,  Year Built: 1936,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 822 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,194 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 146.872,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 6309,  Location: 1.6 M NW OF US-70/RUIDOSO (Lat: 33.323989,  Lng: -105.654714),  Route carried "on" structure: State highway 48,  Year Built: 1960,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 10,765 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,149 (year 2040),  Design Load: HS 20,  Features Intersected: CARRIZO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.607,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 631,  Location: 3.5 MI N OF US-70/RUIDOSO (Lat: 33.334728,  Lng: -105.681147),  Route carried "on" structure: State highway 48,  Year Built: 1960,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 9,604 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,515 (year 2040),  Design Load: HS 20,  Features Intersected: RUIDOSO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.601,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 6311,  Location: 4.7 MI N JCT US70/RUIDOSO (Lat: 33.351011,  Lng: -105.674842),  Route carried "on" structure: State highway 48,  Year Built: 1961,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 9,029 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,705 (year 2040),  Design Load: H 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.644,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 19.0m (62.3ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $62,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $94,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 847,  Location: 5.6 MI E OF NM-48/CAPTIAN (Lat: 33.517675,  Lng: -105.487669),  Route carried "on" structure: US 380,  Year Built: 1983,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 822 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,194 (year 2040),  Design Load: HS 20,  Features Intersected: BONITO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 145.943,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018
Find on map >>   Show street view

Structure Number: 8693,  Location: 0.4 MI NW O JCT NM-48 (Lat: 33.325386,  Lng: -105.636358),  Route carried "on" structure: County highway 5976,  Year Built: 1959,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 750 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,222 (year 2040),  Design Load: HS 15,  Features Intersected: RIO RUIDOSO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8694,  Location: 0.1 miles N of NM 48 (Lat: 33.324478,  Lng: -105.647558),  Route carried "on" structure: County highway 5975,  Year Built: 1960,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,747 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,317 (year 2040),  Design Load: HS 20,  Features Intersected: RIO RUIDOSO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8879,  Location: 2.2 MI S OF US-380 (Lat: 33.498722,  Lng: -105.522831),  Route carried "on" structure: City street 220,  Year Built: 1993,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 109 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 93 (year 2040),  Design Load: HS 20,  Features Intersected: RIO BONITO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.128,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9072,  Location: 400' S JCT NM-48 & (Lat: 33.447133,  Lng: -105.660969),  Route carried "on" structure: State highway 48,  Year Built: 2005,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 3,986 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 5,786 (year 2040),  Design Load: HS 20,  Features Intersected: BONITO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.761,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9078,  Location: 6.5 M.N. JCT NM48&US70 (Lat: 33.372889,  Lng: -105.670386),  Route carried "on" structure: State highway 48,  Year Built: 2000,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 5,200 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,014 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.461,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.0m (6.6ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 9079,  Location: 8.6 M.N. JCT NM48&US70 (Lat: 33.396875,  Lng: -105.679089),  Route carried "on" structure: State highway 48,  Year Built: 2001,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 10,188 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 7,863 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.840,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 9144,  Location: 4.67 M S JCT US-70&NM-48 (Lat: 33.277581,  Lng: -105.694142),  Route carried "on" structure: US 70,  Year Built: 1940,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 6,103 (year 2020),  Truck Traffic: 33%,  Average Future Daily Traffic: 5,701 (year 2040),  Design Load: H 15,  Features Intersected: SNOW CANYON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 411.831,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 0.0m

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 9145,  Location: 3.9 M SW JCT NM-48 (Lat: 33.284597,  Lng: -105.676683),  Route carried "on" structure: US 70,  Year Built: 2004,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 6,103 (year 2020),  Truck Traffic: 33%,  Average Future Daily Traffic: 5,701 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 413.923,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 9146,  Location: 2.6 M SW JCT NM-48 (Lat: 33.297508,  Lng: -105.659069),  Route carried "on" structure: US 70,  Year Built: 2005,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 6,103 (year 2020),  Truck Traffic: 33%,  Average Future Daily Traffic: 5,701 (year 2040),  Design Load: HS 20,  Features Intersected: BILL CANYON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 415.854,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 9187,  Location: 200' N OF JCT MAIN RO (Lat: 33.336931,  Lng: -105.721869),  Route carried "on" structure: County highway 27007,  Year Built: 1979,  Status: Posted for load-capacity,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 276 (year 2020),  Average Future Daily Traffic: 396 (year 2040),  Design Load: HS 15,  Features Intersected: RIO RUIDOSO,  Facility Carried by Structure: 27-Z007
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $28,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 9188,  Location: .1 miles NW of main road (Lat: 33.337233,  Lng: -105.720933),  Route carried "on" structure: County highway 27004,  Year Built: 1979,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 276 (year 2020),  Average Future Daily Traffic: 396 (year 2040),  Design Load: HS 15,  Features Intersected: RIO RUIDOSO,  Facility Carried by Structure: 27-Z004
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $28,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 9189,  Location: EAST END OF N. LOOP DR. (Lat: 33.335500,  Lng: -105.709000),  Route carried "on" structure: County highway 27010,  Year Built: 1965,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 276 (year 2020),  Average Future Daily Traffic: 396 (year 2040),  Design Load: HS 15,  Features Intersected: RIO RUIDOSO,  Facility Carried by Structure: 27-Z010
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $147,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $300,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 919,  Location: WEST END OF N.LOOP DR. (Lat: 33.336939,  Lng: -105.714158),  Route carried "on" structure: County highway 27010,  Year Built: 1965,  Status: Closed,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 276 (year 2020),  Average Future Daily Traffic: 396 (year 2040),  Design Load: H 20,  Features Intersected: RIO RUIDOSO,  Facility Carried by Structure: 27-Z010
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Imminent failure,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $30,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9193,  Location: 0.1 MI S OF MAIN ROAD (Lat: 33.333158,  Lng: -105.694019),  Route carried "on" structure: County highway 27003,  Year Built: 1970,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 267 (year 2020),  Average Future Daily Traffic: 382 (year 2040),  Design Load: HS 20,  Features Intersected: RIO RUIDOSO,  Facility Carried by Structure: 27-Z003
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 7.3 metric tons,  Method Used To Determine Operating Rating: No rating analysis performed,  Inventory Rating: 4.5 metric tons,  Method Used To Determine Inventory Rating: No rating analysis performed,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $28,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 9196,  Location: RIVER TRAIL/RIO RUIDOSO (Lat: 33.330614,  Lng: -105.665231),  Route carried "on" structure: County highway 27006,  Year Built: 1950,  Status: Closed,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 267 (year 2020),  Average Future Daily Traffic: 382 (year 2040),  Design Load: HS 15,  Features Intersected: RIO RUIDOSO,  Facility Carried by Structure: 27-Z006
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 2.7m (8.9ft),  Out-to-Out Width: 2.8m (9.2ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Failed,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $280,000 ( Estimate for 2020),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 9197,  Location: NEAR RIVER TRAIL (Lat: 33.329089,  Lng: -105.660564),  Route carried "on" structure: County highway 27003,  Year Built: 1960,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 267 (year 2020),  Average Future Daily Traffic: 382 (year 2040),  Design Load: HS 15,  Features Intersected: RIO RUIDOSO,  Facility Carried by Structure: 27-Z003
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9466,  Location: 535' N of US-70 (Lat: 33.334947,  Lng: -105.598803),  Route carried "on" structure: City street 27004,  Year Built: 1960,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 267 (year 2020),  Average Future Daily Traffic: 382 (year 2040),  Design Load: HS 20,  Features Intersected: Rio Ruidoso,  Facility Carried by Structure: 27-Z004
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9477,  Location: 540' N of Gavilian Canyon (Lat: 33.326428,  Lng: -105.628464),  Route carried "on" structure: City street 27001,  Year Built: 2009,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 267 (year 2020),  Average Future Daily Traffic: 382 (year 2040),  Design Load: HS 20,  Features Intersected: Ruidoso,  Facility Carried by Structure: 27-Z001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2017
Find on map >>   Show street view

Structure Number: 9482,  Location: 628 Ft. West Of NM-48 (Lat: 33.334775,  Lng: -105.683269),  Route carried "on" structure: City street 27001,  Year Built: 2009,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 267 (year 2020),  Average Future Daily Traffic: 382 (year 2040),  Design Load: HS 20,  Features Intersected: Rio Ruidoso,  Facility Carried by Structure: Sleepy Hollow Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.9m (12.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $800,000 ( Estimate for 2040)
Find on map >>   Show street view

Structure Number: 9483,  Location: 84 Ft. North Of Maine Rd. (Lat: 33.336792,  Lng: -105.716906),  Route carried "on" structure: City street 27001,  Year Built: 2009,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 276 (year 2020),  Average Future Daily Traffic: 396 (year 2040),  Design Load: HS 20,  Features Intersected: Rio Ruidoso,  Facility Carried by Structure: Mc Daniels Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $500,000 ( Estimate for 2040)
Find on map >>   Show street view

Structure Number: 9487,  Location: MAIN RD & FOX DRIVE (Lat: 33.333897,  Lng: -105.699808),  Route carried "on" structure: City street 27001,  Year Built: 2009,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,381 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,187 (year 2040),  Design Load: HS 20,  Features Intersected: RIO RUIDOSO,  Facility Carried by Structure: Main road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 9561,  Location: 0.5 M NW of US-70/NM-48 (Lat: 33.326153,  Lng: -105.634003),  Route carried "on" structure: City street 27001,  Year Built: 2007,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,713 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 2,331 (year 2040),  Design Load: HS 20,  Features Intersected: Rio Ruidoso,  Facility Carried by Structure: 27-Z001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 9562,  Location: 446' N of US-70 (Lat: 33.326694,  Lng: -105.625231),  Route carried "on" structure: City street 27001,  Year Built: 1960,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 267 (year 2020),  Average Future Daily Traffic: 382 (year 2040),  Design Load: HS 20,  Features Intersected: Rio Ruidoso,  Facility Carried by Structure: 27-Z001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 959,  Location: 457 fr of US-70 (Lat: 33.332731,  Lng: -105.670558),  Route carried "on" structure: City street 27001,  Year Built: 2011,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 1,221 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,368 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Rio Ruidoso,  Facility Carried by Structure: 27-Z001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 18.6m (61.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $300,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 982,  Location: JCT. MAIN RD/FLUME CAN.RD (Lat: 33.333961,  Lng: -105.689733),  Route carried "on" structure: County highway 27001,  Year Built: 2018,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,676 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,534 (year 2038),  Design Load: HS 20,  Features Intersected: RIO RUIDOSO,  Facility Carried by Structure: 27-Z001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018
Find on map >>   Show street view

Structure Number: M704,  Location: AT INN OF THE MTN. GODS (Lat: 33.294189,  Lng: -105.688156),  Route carried "on" structure: Federal lands road 4,  Year Built: 1974,  Status: Posted for load,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 900 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,053 (year 2041),  Features Intersected: INN OF MTN GODS ACC ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.500,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Culverts: Fair,  Operating Rating: 8.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Total Project Cost: $815,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 30801000017012,  Location: NO DATA ENTERED (Lat: 33.408717,  Lng: -105.740008),  Route carried "on" structure: Federal lands road 127,  Year Built: 2011,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 200 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 300 (year 2042),  Design Load: HL 93,  Features Intersected: NO DATA ENTERED
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.560,  Lanes on structure: 1,  Owner: U.S. Forest Service,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.1m (36.4ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 30801000017014,  Location: NO DATA ENTERED (Lat: 33.412867,  Lng: -105.744433),  Route carried "on" structure: Federal lands road 127,  Year Built: 2011,  Status: Open,  Structure Length: 1.12m (3.67ft),  Average Daily Traffic: 200 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 300 (year 2042),  Design Load: HL 93,  Features Intersected: NO DATA ENTERED
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.200,  Lanes on structure: 1,  Owner: U.S. Forest Service,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.5m (34.4ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 30802000017013,  Location: NO DATA ENTERED (Lat: 33.410100,  Lng: -105.741100),  Route carried "on" structure: Federal lands road 127,  Year Built: 2011,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 200 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 300 (year 2042),  Design Load: HL 93,  Features Intersected: NO DATA ENTERED
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.880,  Lanes on structure: 1,  Owner: U.S. Forest Service,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.4m (37.4ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Other
Discuss Ruidoso, New Mexico (NM) on our hugely popular New Mexico forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.