Bridge Statistics for Salem, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 128ft / 38.8mTotal length
  • $20,998,000Total costs
  • 9,396Total average daily traffic
  • 767Total average daily truck traffic
  • 11,477Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Salem
  • No street view available for this location

New bridges in Salem, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21920-1929
  • 41930-1939
  • 61940-1949
  • 21950-1959
  • 11970-1979
  • 12000-2009
  • 22010-2019
Reconstructed bridges in Salem, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41980-1989
  • 51990-1999
  • 42000-2009
Average Bridge Daily Traffic in Salem, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.3%Excellent
  • 21.1%Very good
  • 47.4%Good
  • 15.8%Satisfactory
  • 10.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.3%Excellent
  • 47.4%Very good
  • 10.5%Good
  • 21.1%Satisfactory
  • 10.5%Fair
  • 5.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.8%Very good
  • 10.5%Good
  • 42.1%Satisfactory
  • 21.1%Fair
  • 5.3%Poor
  • 5.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.3%Very good
  • 42.1%Good
  • 15.8%Satisfactory
  • 36.8%Fair
Find on map >>   Show street view

Structure Number: 101708,  Location: 0.1 MI S JCT RTES 22& 153 (Lat: 43.170744,  Lng: -73.326867),  Route carried "on" structure: State highway 22,  Year Built: 1928,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 3,146 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,355 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WHITE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.433,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $887,000,  Roadway Improvement Cost: $519,000,  Total Project Cost: $1,406,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102073,  Location: 1.2 MI E JCT 20 &BATTEN K (Lat: 43.149931,  Lng: -73.384939),  Route carried "on" structure: State highway 29,  Year Built: 2013,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 1,750 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,825 (year 2040),  Design Load: HL 93,  Features Intersected: BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.641,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $943,000,  Roadway Improvement Cost: $552,000,  Total Project Cost: $1,495,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320371,  Location: 1.8 MI WNW OF SALEM (Lat: 43.176697,  Lng: -73.368200),  Route carried "on" structure: Other road ,  Year Built: 1958,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 116 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 162 (year 2038),  Design Load: H 15,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: MCKINNEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 31.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $220,000,  Total Project Cost: $594,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320372,  Location: 2.5 MI S OF WEST HEBRON (Lat: 43.187419,  Lng: -73.377047),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 235 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 329 (year 2038),  Design Load: H 15,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: BLACK CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.149,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.7m (25.3ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $680,000,  Roadway Improvement Cost: $398,000,  Total Project Cost: $1,079,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320373,  Location: 2 MI_SW OF SALEM (Lat: 43.160806,  Lng: -73.369892),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 251 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 351 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: CEMETERY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.0m (78.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $818,000,  Roadway Improvement Cost: $479,000,  Total Project Cost: $1,298,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 330581,  Location: 5 MILES NE OF SALEM (Lat: 43.222278,  Lng: -73.270375),  Route carried "on" structure: County highway ,  Year Built: 1928,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 628 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 879 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WHITE CREEK,  Facility Carried by Structure: COUNTY ROAD 153
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.627,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 85.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $580,000,  Roadway Improvement Cost: $340,000,  Total Project Cost: $920,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330592,  Location: 3.5 MI SE JCT SH22 & SH29 (Lat: 43.099550,  Lng: -73.302933),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 596 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 834 (year 2039),  Design Load: H 20,  Features Intersected: BATTEN KILL,  Facility Carried by Structure: BUFFUM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.951,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.74m (12.27ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $2,761,000,  Roadway Improvement Cost: $1,617,000,  Total Project Cost: $4,377,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330594,  Location: 2.5 MI SW OF SALEM (Lat: 43.145181,  Lng: -73.397747),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 263 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 368 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BATTEN KILL,  Facility Carried by Structure: E GREENWICH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 6.18m (20.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,286,000,  Roadway Improvement Cost: $753,000,  Total Project Cost: $2,039,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330609,  Location: 6.0 MI N OF ANAQUASSACOOK (Lat: 43.153664,  Lng: -73.267922),  Route carried "on" structure: County highway ,  Year Built: 1931,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 143 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 200 (year 2039),  Design Load: HS 20,  Features Intersected: CAMDEN VALLEY CRK,  Facility Carried by Structure: CAMDEN VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.128,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $371,000,  Roadway Improvement Cost: $217,000,  Total Project Cost: $588,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33061,  Location: 3 MI SOUTH EAST OF SALEM (Lat: 43.137919,  Lng: -73.282475),  Route carried "on" structure: County highway ,  Year Built: 1931,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 143 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 200 (year 2039),  Design Load: HS 20,  Features Intersected: CAMDEN VALLEY CRK,  Facility Carried by Structure: CAMDEN VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.891,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $329,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $522,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330622,  Location: 1 MI E JCT SH 29 & SH 22 (Lat: 43.134817,  Lng: -73.355614),  Route carried "on" structure: Other road ,  Year Built: 1874,  Year Reconstructed: 2007,  Status: Posted for load,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 162 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 227 (year 2039),  Features Intersected: BATTEN KILL,  Facility Carried by Structure: REXLEIGH ROAD
Minimum Vertical Clearance: 3.63m (11.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $1,084,000,  Roadway Improvement Cost: $635,000,  Total Project Cost: $1,719,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 330657,  Location: 2.5 MI NE OF SALEM (Lat: 43.195639,  Lng: -73.296278),  Route carried "on" structure: Other road ,  Year Built: 1942,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 86 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 120 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WHITE CREEK,  Facility Carried by Structure: CHAMBERS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $346,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $548,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330658,  Location: IN SALEM (Lat: 43.169133,  Lng: -73.329900),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 512 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 717 (year 2040),  Design Load: HS 20,  Features Intersected: WHITE CREEK,  Facility Carried by Structure: ARCHIBALD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $564,000,  Roadway Improvement Cost: $330,000,  Total Project Cost: $895,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330659,  Location: 3.5 MILES SE OF SALEM (Lat: 43.146083,  Lng: -73.273375),  Route carried "on" structure: County highway ,  Year Built: 1942,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 143 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 200 (year 2039),  Design Load: H 20,  Features Intersected: CAMDEN VALLEY CRK,  Facility Carried by Structure: CAMDEN VLLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.130,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $334,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $529,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33066,  Location: 5 MI SSE OF SALEM (Lat: 43.102756,  Lng: -73.299778),  Route carried "on" structure: County highway ,  Year Built: 1942,  Status: Posted for load,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 73 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 102 (year 2038),  Design Load: H 20,  Features Intersected: CAMDEN VALLEY CREEK,  Facility Carried by Structure: HICKORY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Fair,  Channel: Fair,  Operating Rating: 19.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $378,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330661,  Location: VILLAGE OF SALEM (Lat: 43.175883,  Lng: -73.314358),  Route carried "on" structure: Other road ,  Year Built: 1942,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 216 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 302 (year 2039),  Design Load: H 20,  Features Intersected: WHITE CREEK,  Facility Carried by Structure: BLIND BUCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $412,000,  Roadway Improvement Cost: $241,000,  Total Project Cost: $654,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330662,  Location: 1 MI NE OF SALEM (Lat: 43.186372,  Lng: -73.302006),  Route carried "on" structure: Other road ,  Year Built: 1942,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 153 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 214 (year 2038),  Design Load: H 20,  Features Intersected: WHITE CREEK,  Facility Carried by Structure: BEATTIE HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $633,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 330663,  Location: 1.5 MI SW OF SALEM (Lat: 43.151683,  Lng: -73.353775),  Route carried "on" structure: Other road ,  Year Built: 1942,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 520 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 728 (year 2039),  Design Load: H 20,  Features Intersected: WHITE CREEK,  Facility Carried by Structure: HANKS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 75.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $411,000,  Roadway Improvement Cost: $241,000,  Total Project Cost: $652,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 330676,  Location: 2.4 MI S WEST HEBRON (Lat: 43.193033,  Lng: -73.380139),  Route carried "on" structure: Other road ,  Year Built: 1950,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 260 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 364 (year 2039),  Features Intersected: BLACK CREEK,  Facility Carried by Structure: JOE BEANE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.788,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $424,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $672,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other