Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Santa Ynez, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 276ft / 84.4mTotal length
  • 44,593Total average daily traffic
  • 2,444Total average daily truck traffic
  • 103,285Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Santa Ynez
  • No street view available for this location

New bridges in Santa Ynez, CA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11950-1959
  • 21970-1979
  • 21980-1989
  • 12000-2009
  • 72010-2019
  • 12020-2022
Average Bridge Daily Traffic in Santa Ynez, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 83.3%Good
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 85.7%Good
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 46.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 51 0078,  Location: 05-SB-154-R9.97 (Lat: 34.590317,  Lng: -120.032975),  Route carried "on" structure: State highway 154,  Year Built: 1971,  Status: Open,  Structure Length: 6.18m (20.28ft),  Average Daily Traffic: 14,500 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 32,165 (year 2043),  Design Load: HS 20+Mod,  Features Intersected: SANTA AGUEDA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.970,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 76.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51 0079,  Location: 05-SB-154-R10.12 (Lat: 34.589064,  Lng: -120.030997),  Route carried "on" structure: State highway 154,  Year Built: 1971,  Status: Open,  Structure Length: 31.00m (101.71ft),  Average Daily Traffic: 14,500 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 32,165 (year 2043),  Design Load: HS 20+Mod,  Features Intersected: SANTA INEZ RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.120,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51 0267,  Location: 05-SB-154-R6.94 (Lat: 34.622486,  Lng: -120.069425),  Route carried "on" structure: State highway 154,  Year Built: 1936,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 9,000 (year 2009),  Truck Traffic: 7%,  Average Future Daily Traffic: 29,607 (year 2041),  Features Intersected: BRANCH COTA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.940,  Lanes on structure: 3,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 51C0074,  Location: 0.4 MI E SR 154 (Lat: 34.594500,  Lng: -120.029381),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 291 (year 2014),  Truck Traffic: 11%,  Average Future Daily Traffic: 544 (year 2042),  Design Load: HS 20,  Features Intersected: SANTA AQUEDA CREEK,  Facility Carried by Structure: ARMOUR RANCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51C0075,  Location: 2.8 MI E SR 154 (Lat: 34.620211,  Lng: -120.021875),  Route carried "on" structure: County highway ,  Year Built: 1952,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 873 (year 2014),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,092 (year 2042),  Design Load: HS 15,  Features Intersected: SANTA AQUEDA CREEK,  Facility Carried by Structure: HAPPY CANYON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Other Special Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51C0217,  Location: 1.52 MI S SR 246 (Lat: 34.584467,  Lng: -120.100625),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 24.38m (79.99ft),  Average Daily Traffic: 1,303 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 655 (year 2042),  Design Load: HS 20,  Features Intersected: SANTA YNEZ RIVER,  Facility Carried by Structure: REFUGIO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51C0354,  Location: 0.1 MI S SR246 OFF EDISON (Lat: 34.609917,  Lng: -120.083581),  Route carried "on" structure: Business County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 3,000 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,525 (year 2044),  Design Load: HS 20,  Features Intersected: SANJA DE COTA CREEK,  Facility Carried by Structure: SANJA COTA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.9m (32.5ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51C0378,  Location: 2.5 MI S SANTA YNEZ RIVER (Lat: 34.559133,  Lng: -120.084378),  Route carried "on" structure: Bypass County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 150 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 204 (year 2036),  Features Intersected: QUIOTA CREEK,  Facility Carried by Structure: SOUTH REFUGIO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018
Find on map >>   Show street view

Structure Number: 51C0379,  Location: 2.4 MI S SANTA YNEZ RIVER (Lat: 34.559661,  Lng: -120.084747),  Route carried "on" structure: Bypass County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 150 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 204 (year 2036),  Features Intersected: QUIOTA CREEK,  Facility Carried by Structure: SOUTH REFUGIO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018
Find on map >>   Show street view

Structure Number: 51C0387,  Location: 2.1 MI S SANTA YNEZ RIVER (Lat: 34.561892,  Lng: -120.087981),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 1.76m (5.77ft),  Average Daily Traffic: 150 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 208 (year 2040),  Design Load: HL 93,  Features Intersected: QUIOTA CREEK,  Facility Carried by Structure: SOUTH REFUGIO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018
Find on map >>   Show street view

Structure Number: 51C0388,  Location: 1.5 MI S SANTA YNEZ RIVER (Lat: 34.567325,  Lng: -120.095097),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 1.76m (5.77ft),  Average Daily Traffic: 76 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 92 (year 2044),  Design Load: Greater than HL93,  Features Intersected: QUIOTA CREEK,  Facility Carried by Structure: SOUTH REFUGIO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 51C0389,  Location: 2.2 MI S SANTA YNEZ RIVER (Lat: 34.561319,  Lng: -120.086597),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 1.79m (5.87ft),  Average Daily Traffic: 150 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 208 (year 2040),  Design Load: HL 93,  Features Intersected: QUIOTA CREEK,  Facility Carried by Structure: SOUTH REFUGIO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018
Find on map >>   Show street view

Structure Number: 51C0393,  Location: 2.35 MI S SANTA YNEZ RIVR (Lat: 34.560019,  Lng: -120.085050),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 150 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 204 (year 2037),  Design Load: HL 93,  Features Intersected: QUIOTA CREEK,  Facility Carried by Structure: SOUTH REFUGIO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020
Find on map >>   Show street view

Structure Number: 51C0394,  Location: 3.0 MI S SANTA YNEZ RIVER (Lat: 34.554750,  Lng: -120.081689),  Route carried "on" structure: Bypass County highway ,  Year Built: 2019,  Status: Open,  Structure Length: 1.97m (6.46ft),  Average Daily Traffic: 150 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 208 (year 2042),  Design Load: HL 93,  Features Intersected: QUIOTA CREEK,  Facility Carried by Structure: SOUTH REFUGIO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 51C0395,  Location: 2.7 MI S SANTA YNEZ RIVER (Lat: 34.558542,  Lng: -120.083608),  Route carried "on" structure: Bypass County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 1.79m (5.87ft),  Average Daily Traffic: 150 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 204 (year 2037),  Features Intersected: QUIOTA CREEK,  Facility Carried by Structure: SOUTH REFUGIO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Discuss Santa Ynez, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.