Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Savanna, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 220ft / 66.7mTotal length
  • $28,281,000Total costs
  • 198,434Total average daily traffic
  • 50,388Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Savanna
  • No street view available for this location

New bridges in Savanna, OK - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 21950-1959
  • 191960-1969
  • 21970-1979
  • 11990-1999
  • 22000-2009
Reconstructed bridges in Savanna, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 11970-1979
  • 01980-1989
  • 31990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Savanna, OK
Average Bridge Truck Traffic in Savanna, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.8%Very good
  • 50.0%Good
  • 25.0%Satisfactory
  • 6.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Very good
  • 18.8%Good
  • 37.5%Satisfactory
  • 6.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.8%Very good
  • 31.3%Good
  • 37.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 23.5%Very good
  • 17.6%Good
  • 41.2%Satisfactory
  • 17.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 42.9%Very good
  • 42.9%Good
  • 14.3%Serious
Find on map >>   Show street view

Structure Number: 5982,  Location: 0.2S & 0.5E TULLAHASSEE (Lat: 35.835983,  Lng: -95.431275),  Route carried "on" structure: County highway E0814,  Year Built: 1938,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 24 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 38 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.79m (9.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $143,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 6253,  Location: 1. S 2. E OF SAVANNA (Lat: 34.811142,  Lng: -95.806739),  Route carried "on" structure: County highway E1520,  Year Built: 1938,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: ROCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $294,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6414,  Location: 1 S 2 E OF SAVANA (Lat: 34.814514,  Lng: -95.811953),  Route carried "on" structure: County highway N4050,  Year Built: 1938,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CHUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $448,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6707,  Location: 4. N OF PITTSBURG (Lat: 34.776325,  Lng: -95.847150),  Route carried "on" structure: County highway 6160C,  Year Built: 1939,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.533,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.79m (9.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $143,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11733,  Location: 1.8E 2.5N OF SAVANAH (Lat: 34.866022,  Lng: -95.807033),  Route carried "on" structure: County highway N4050,  Year Built: 1997,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Serious,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.79m (9.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13605,  Location: 5.3 N JCT SH 63 (Lat: 34.792514,  Lng: -95.874269),  Route carried "on" structure: US 69,  Year Built: 1956,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 16,900 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 27,040 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.998,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $299,000,  Roadway Improvement Cost: $493,000,  Total Project Cost: $837,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13728,  Location: 36.82 MI.NE OF TP GATE (Lat: 36.512064,  Lng: -95.268514),  Route carried "on" structure: Interstate 44,  Year Built: 1957,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 15,000 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 24,000 (year 2040),  Design Load: HS 20,  Features Intersected: CRAIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 34.4m (112.9ft),  Out-to-Out Width: 35.1m (115.2ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 15949,  Location: 10.6 N JCT SH 63 (Lat: 34.858983,  Lng: -95.816317),  Route carried "on" structure: US 69,  Year Built: 1964,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 20,500 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 32,800 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.121,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $322,000,  Roadway Improvement Cost: $531,000,  Total Project Cost: $902,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 16019,  Location: 0.2 N INDIAN NATIONS TPK (Lat: 34.864719,  Lng: -95.811075),  Route carried "on" structure: US 69,  Year Built: 1964,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 10,550 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 16,880 (year 2040),  Design Load: HS 20,  Features Intersected: DANCING RABBIT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.958,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.61m (21.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $885,000,  Roadway Improvement Cost: $1,460,000,  Total Project Cost: $2,478,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16282,  Location: 40.3 MI S OF I-40 (Lat: 34.870003,  Lng: -95.818836),  Route carried "on" structure: Other road ,  Year Built: 1965,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 8,400 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 13,440 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: IND. NATION TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 56.7m (186.0ft),  Out-to-Out Width: 57.3m (188.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 16487,  Location: 40.45 MI'S S. JCT I-40 (Lat: 34.869639,  Lng: -95.818786),  Route carried "on" structure: Other road E1480,  Year Built: 1965,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 8,400 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 13,440 (year 2040),  Design Load: HS 20,  Features Intersected: CO. RD. E1480 UNDER,  Facility Carried by Structure: IND. NATION TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 25.3m (83.0ft),  Out-to-Out Width: 26.4m (86.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 73.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $434,000,  Roadway Improvement Cost: $651,000,  Total Project Cost: $1,248,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16518,  Location: 39.41 MI'S S. JCT I-40 (Lat: 34.883889,  Lng: -95.821667),  Route carried "on" structure: County highway E1470,  Year Built: 1965,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 4,860 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 7,776 (year 2040),  Design Load: H 20,  Features Intersected: IND. NATION TP UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.79m (15.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $598,000,  Roadway Improvement Cost: $897,000,  Total Project Cost: $1,713,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16592,  Location: 41.02 MI S JCT I-40 (Lat: 34.862083,  Lng: -95.813058),  Route carried "on" structure: Other road ,  Year Built: 1965,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 4,200 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 6,720 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 69 UNDER,  Facility Carried by Structure: IND. NATION TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $742,000,  Roadway Improvement Cost: $1,113,000,  Total Project Cost: $2,122,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16954,  Location: 1.0 MI S OF SAVANAH (Lat: 34.816981,  Lng: -95.840908),  Route carried "on" structure: County highway 6160C,  Year Built: 1967,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CHUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.264,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.86m (22.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $560,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17112,  Location: 41.5 MI S OF I-40 (Lat: 34.855761,  Lng: -95.807328),  Route carried "on" structure: Other road ,  Year Built: 1968,  Status: Open,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 3,800 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 6,080 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: IND. NATION TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.571,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 54.3m (178.1ft),  Out-to-Out Width: 54.9m (180.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1726,  Location: 42.79 MI'S S. JCT I-40 (Lat: 34.840278,  Lng: -95.799444),  Route carried "on" structure: County highway 6184C,  Year Built: 1968,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 15,  Features Intersected: IND. NATION TP UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.801,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.82m (15.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $603,000,  Roadway Improvement Cost: $905,000,  Total Project Cost: $1,728,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17465,  Location: 0.2 N INDIAN NATIONS TPK (Lat: 34.864767,  Lng: -95.810369),  Route carried "on" structure: US 69,  Year Built: 1969,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 10,650 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 17,040 (year 2040),  Design Load: HS 20,  Features Intersected: DANCING RABBIT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.958,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.83m (22.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $770,000,  Roadway Improvement Cost: $1,271,000,  Total Project Cost: $2,157,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17519,  Location: 44.88 MI'S S. JCT I-40 (Lat: 34.811111,  Lng: -95.789444),  Route carried "on" structure: County highway E1520,  Year Built: 1969,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 2,500 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,000 (year 2040),  Design Load: HS 20,  Features Intersected: IND. NATION TP UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.421,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.43m (17.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $679,000,  Roadway Improvement Cost: $1,019,000,  Total Project Cost: $1,943,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17539,  Location: 41.02 MI S JCT I-40 (Lat: 34.862378,  Lng: -95.812947),  Route carried "on" structure: Other road ,  Year Built: 1965,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 4,050 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 6,480 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 69 UNDER,  Facility Carried by Structure: IND. NATION TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $742,000,  Roadway Improvement Cost: $1,113,000,  Total Project Cost: $2,122,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1757,  Location: 44.14 MI'S S. JCT I-40 (Lat: 34.823278,  Lng: -95.795133),  Route carried "on" structure: Other road ,  Year Built: 1969,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 3,800 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 6,080 (year 2040),  Design Load: HS 20,  Features Intersected: PEACEABLE CREEK,  Facility Carried by Structure: IND. NATION TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.031,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.21m (36.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,401,000,  Roadway Improvement Cost: $2,102,000,  Total Project Cost: $3,992,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19037,  Location: 12.38 N ATOKA C/L (Lat: 34.835833,  Lng: -95.836944),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 69 UNDER,  Facility Carried by Structure: NAVAL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.919,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,087,000,  Roadway Improvement Cost: $1,794,000,  Total Project Cost: $3,044,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28378,  Location: 2.3MI.S OF SAVANNA (Lat: 34.790772,  Lng: -95.840808),  Route carried "on" structure: County highway D4030,  Year Built: 2006,  Status: Open,  Structure Length: 1.54m (5.05ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CHUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.2m (46.6ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.69m (5.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $184,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $294,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 28708,  Location: 40.83 M S. JCT I-40 (Lat: 34.865756,  Lng: -95.815714),  Route carried "on" structure: Other road ,  Year Built: 2006,  Status: Open,  Structure Length: 1.23m (4.04ft),  Average Daily Traffic: 8,400 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 13,440 (year 2040),  Design Load: HS 20,  Features Intersected: DANCING RABBIT CREEK,  Facility Carried by Structure: IND. NATION TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.553,  Lanes on structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 90.8m (297.9ft),  Out-to-Out Width: 91.4m (299.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 16487,  Location: 40.45 MI'S S. JCT I-40 (Lat: 34.869639,  Lng: -95.818786),  Route carried "under" structure: County highway 6186C,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 15%,  Features Intersected: CO. RD. E1480 UNDER,  Facility Carried by Structure: IND. NATION TP
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.9m (39.0ft)

Find on map >>   Show street view

Structure Number: 16518,  Location: 39.41 MI'S S. JCT I-40 (Lat: 34.883889,  Lng: -95.821667),  Route carried "under" structure: Other road ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,400 (year 2020),  Truck Traffic: 25%,  Features Intersected: IND. NATION TP UNDER,  Facility Carried by Structure: CO. RD. E1470
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 16592,  Location: 41.02 MI S JCT I-40 (Lat: 34.862083,  Lng: -95.813058),  Route carried "under" structure: US 69,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 20,500 (year 2020),  Truck Traffic: 25%,  Features Intersected: U.S. 69 UNDER,  Facility Carried by Structure: IND. NATION TP
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 23.604,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 1726,  Location: 42.79 MI'S S. JCT I-40 (Lat: 34.840278,  Lng: -95.799444),  Route carried "under" structure: Other road ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 3,800 (year 2020),  Truck Traffic: 25%,  Features Intersected: IND. NATION TP UNDER,  Facility Carried by Structure: CO. RD. 6184C
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 28.801,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 17519,  Location: 44.88 MI'S S. JCT I-40 (Lat: 34.811111,  Lng: -95.789444),  Route carried "under" structure: Other road ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 3,800 (year 2020),  Truck Traffic: 25%,  Features Intersected: IND. NATION TP UNDER,  Facility Carried by Structure: CO. RD. E1520
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 25.421,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 17539,  Location: 41.02 MI S JCT I-40 (Lat: 34.862378,  Lng: -95.812947),  Route carried "under" structure: US 69,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 20,500 (year 2020),  Truck Traffic: 25%,  Features Intersected: U.S. 69 UNDER,  Facility Carried by Structure: IND. NATION TP
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 23.572,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 19037,  Location: 12.38 N ATOKA C/L (Lat: 34.835833,  Lng: -95.836944),  Route carried "under" structure: US 69,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 18,300 (year 2020),  Truck Traffic: 25%,  Features Intersected: U.S. 69 UNDER,  Facility Carried by Structure: NAVAL RD
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 19.919,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Discuss Savanna, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.