  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 167ft / 50.7mTotal length
  • $11,567,000Total costs
  • 206,140Total average daily traffic
  • 9,475Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sparks
  • No street view available for this location

New bridges in Sparks, GA - historical statistics
  • New bridges - historical statistics
  • 71960-1969
  • 11970-1979
  • 11980-1989
  • 11990-1999
  • 22000-2009
Average Bridge Daily Traffic in Sparks, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 87.5%Good
  • 12.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Very good
  • 62.5%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 87.5%Good
  • 12.5%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 28.6%Good
  • 42.9%Satisfactory
  • 14.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 75.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 75003,  Location: APP 12 MI SW OF NEWTON (Lat: 31.190358,  Lng: -84.486039),  Route carried "on" structure: County highway 47,  Year Built: 1960,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 50 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2031),  Features Intersected: BIG CYPRESS CREEK,  Facility Carried by Structure: HOGGARD MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Critical,  Channel: Satisfactory,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 10.09m (33.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 750015,  Location: 3.5 MI N OF SPARKS (Lat: 31.214969,  Lng: -83.459928),  Route carried "on" structure: County highway 253,  Year Built: 1960,  Status: Open,  Structure Length: 6.00m (19.69ft),  Average Daily Traffic: 940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,410 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-75 (EXIT 45),  Facility Carried by Structure: BARNEYVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Other Special Inspection Date: November 2020,  Bridge Improvement Cost: $766,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,149,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750023,  Location: IN SOUTH WEST SPARKS (Lat: 31.157775,  Lng: -83.446922),  Route carried "on" structure: Interstate 75,  Year Built: 1960,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 34,110 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 51,165 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: GIDDENS MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 65.983,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 37.2m (122.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $284,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $426,000
Find on map >>   Show street view

Structure Number: 750029,  Location: IN WEST SPARKS (Lat: 31.165903,  Lng: -83.449350),  Route carried "on" structure: County highway 1211,  Year Built: 1960,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 2,150 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,225 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-75 (EXIT 41),  Facility Carried by Structure: ROUNDTREE BR. RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $735,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $1,102,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 75003,  Location: IN WEST SPARKS (Lat: 31.167850,  Lng: -83.434489),  Route carried "on" structure: County highway 1211,  Year Built: 1960,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,550 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,825 (year 2031),  Design Load: H 15,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: GAY AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 750031,  Location: APP 3.5 MI N OF SPARKS (Lat: 31.219047,  Lng: -83.419278),  Route carried "on" structure: County highway 1211,  Year Built: 1969,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 1,000 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,500 (year 2031),  Design Load: HS 15,  Features Intersected: BRUSHY CREEK,  Facility Carried by Structure: BRUSHY CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $422,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $633,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750034,  Location: APP 3.8 MI E OF SPARKS (Lat: 31.209658,  Lng: -83.396539),  Route carried "on" structure: County highway 2698,  Year Built: 1976,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 500 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 750 (year 2031),  Design Load: HS 15,  Features Intersected: BRUSHY CREEK,  Facility Carried by Structure: BARNEYVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $531,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $797,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750038,  Location: SOUTH SPARKS (Lat: 31.155808,  Lng: -83.431589),  Route carried "on" structure: US 41,  Year Built: 1993,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 5,450 (year 2011),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,175 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $871,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $1,307,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 755026,  Location: APP 1.2 MI S OF SPARKS (Lat: 31.151889,  Lng: -83.434589),  Route carried "on" structure: County highway 135,  Year Built: 1965,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,040 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,560 (year 2031),  Design Load: H 15,  Features Intersected: GIDDENS MILL CREEK,  Facility Carried by Structure: N. ELM STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $154,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $231,000
Find on map >>   Show street view

Structure Number: 755028,  Location: IN EAST SPARKS (Lat: 31.166000,  Lng: -83.433158),  Route carried "on" structure: County highway 164,  Year Built: 1980,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 760 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,140 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: PATTERSON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 755057,  Location: 1.5 MI N OF SPARKS (Lat: 31.185139,  Lng: -83.453778),  Route carried "on" structure: County highway 13,  Year Built: 2007,  Status: Open,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 960 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,440 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-75 @ 42.68N,  Facility Carried by Structure: SPRINGHILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,375,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $2,063,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 755062,  Location: NW SPARKS (Lat: 31.171281,  Lng: -83.450536),  Route carried "on" structure: Interstate 75,  Year Built: 2008,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 34,030 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 51,045 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.592,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 37.8m (124.0ft),  Skew: 34 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 39.8m (130.6ft),  Out-to-Out Width: 42.0m (137.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,866,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $2,798,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750015,  Location: 3.5 MI N OF SPARKS (Lat: 31.214969,  Lng: -83.459928),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 253 BARNEYVILLE RD,  Facility Carried by Structure: BARNEYVILLE ROAD
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 72.421,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 750029,  Location: IN WEST SPARKS (Lat: 31.165903,  Lng: -83.449350),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 40,300 (year 1999),  Truck Traffic: 10%,  Features Intersected: FAS 1211 ROUNDTREE BR RD,  Facility Carried by Structure: ROUNDTREE BR. RD
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 65.983,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 755057,  Location: 1.5 MI N OF SPARKS (Lat: 31.185139,  Lng: -83.453778),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 40,300 (year 1999),  Truck Traffic: 10%,  Features Intersected: SPRINGHILL ROAD,  Facility Carried by Structure: SPRINGHILL ROAD
Minimum Vertical Clearance: 5.35m (17.55ft),  Kilometerpoint: 69.202,  Lanes on structure: 2,  Length of Maximum Span: 0.0m