Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Summerton, South Carolina (SC)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 164ft / 49.5mTotal length
  • $761,000Total costs
  • 199,250Total average daily traffic
  • 36,751Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Summerton
  • No street view available for this location

New bridges in Summerton, SC - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 41940-1949
  • 11950-1959
  • 131960-1969
  • 31990-1999
Reconstructed bridges in Summerton, SC - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 21970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Summerton, SC
Average Bridge Truck Traffic in Summerton, SC
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Good
  • 60.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 60.0%Good
  • 30.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 30.0%Good
  • 40.0%Satisfactory
  • 20.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.3%Very good
  • 63.6%Good
  • 9.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Very good
  • 16.7%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 1447,  Location: 1MI SE SUMMERTON (Lat: 33.606392,  Lng: -80.330950),  Route carried "on" structure: State highway 38,  Year Built: 1948,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,752 (year 2040),  Design Load: H 20,  Features Intersected: TAWCAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.418,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 1449,  Location: 4.0MI NW SUMMERTON (Lat: 33.631636,  Lng: -80.379558),  Route carried "on" structure: State highway 57,  Year Built: 1948,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 450 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 626 (year 2040),  Design Load: H 15,  Features Intersected: TRIB TO JACKS CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.882,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 1609,  Location: 1MI N OF SUMMERTON (Lat: 33.607558,  Lng: -80.339367),  Route carried "on" structure: US 301,  Year Built: 1949,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,100 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,526 (year 2040),  Design Load: H 15,  Features Intersected: TAWCAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.697,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 161,  Location: 2MI N OF SUMMERTON (Lat: 33.614178,  Lng: -80.326981),  Route carried "on" structure: US 301,  Year Built: 1931,  Year Reconstructed: 1949,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,100 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,526 (year 2040),  Design Load: H 15,  Features Intersected: TRIB CAW CAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.046,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 1613,  Location: 1MI SE SUMMERTON (Lat: 33.600008,  Lng: -80.341717),  Route carried "on" structure: State highway 25,  Year Built: 1949,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,100 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,606 (year 2040),  Design Load: H 20,  Features Intersected: TAWCAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.590,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 2314,  Location: 2MI SE SUMMERTON (Lat: 33.584192,  Lng: -80.340283),  Route carried "on" structure: State highway 56,  Year Built: 1956,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 650 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 949 (year 2041),  Design Load: H 10,  Features Intersected: TAWCAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.96m (6.43ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $198,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $297,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4086,  Location: 2MI W SUMMERTON (Lat: 33.609922,  Lng: -80.389728),  Route carried "on" structure: State highway 26,  Year Built: 1963,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 700 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,022 (year 2040),  Design Load: H 10,  Features Intersected: JACKS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.952,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Very good,  Operating Rating: 21.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 3.06m (10.04ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $309,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $464,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4981,  Location: 2MI NE OF SUMMERTON (Lat: 33.594397,  Lng: -80.341525),  Route carried "on" structure: Interstate 95,  Year Built: 1967,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 35,200 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 61,600 (year 2041),  Design Load: HS 20,  Features Intersected: TAWCAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 175.346,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 42.7m (140.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 42.7m (140.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 4982,  Location: 1MI SE OF SUMMERTON (Lat: 33.598158,  Lng: -80.331200),  Route carried "on" structure: Interstate 95,  Year Built: 1967,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 14,500 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 25,375 (year 2040),  Design Load: HS 20,  Features Intersected: S-25 & S-38
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 176.381,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4988,  Location: 1MI SE OF SUMMERTON (Lat: 33.598389,  Lng: -80.331372),  Route carried "on" structure: Interstate 95,  Year Built: 1967,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 14,500 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 25,375 (year 2040),  Design Load: HS 20,  Features Intersected: S-25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 176.368,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4999,  Location: 1MI S SUMMERTON (Lat: 33.589219,  Lng: -80.356728),  Route carried "on" structure: State highway 102,  Year Built: 1967,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 2,200 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,498 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: I-95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.636,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.45m (31.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5268,  Location: 1MI S SUMMERTON (Lat: 33.592761,  Lng: -80.347042),  Route carried "on" structure: State highway 56,  Year Built: 1968,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 650 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 949 (year 2040),  Design Load: HS 15,  Features Intersected: I-95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.266,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5273,  Location: 6MI SW MANNING (Lat: 33.618175,  Lng: -80.307750),  Route carried "on" structure: State highway 420,  Year Built: 1968,  Status: Open,  Structure Length: 9.54m (31.30ft),  Average Daily Traffic: 550 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 803 (year 2040),  Design Load: HS 15,  Features Intersected: I-95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.826,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.54m (31.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8342,  Location: 3MI SW SUMMERTON (Lat: 33.593206,  Lng: -80.392669),  Route carried "on" structure: State highway 76,  Year Built: 1990,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 320 (year 2040),  Design Load: HS 20,  Features Intersected: JACKS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.442,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8633,  Location: 3.5MI SE SUMMERTON (Lat: 33.560167,  Lng: -80.367606),  Route carried "on" structure: State highway 127,  Year Built: 1993,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 400 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 584 (year 2040),  Design Load: HS 20,  Features Intersected: TRIB OF TAWCAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.129,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 30.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8822,  Location: 3MI S SUMMERTON (Lat: 33.565067,  Lng: -80.353383),  Route carried "on" structure: State highway 127,  Year Built: 1995,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 400 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 584 (year 2040),  Design Load: HS 20,  Features Intersected: TAWCAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.644,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4982,  Location: 1MI SE OF SUMMERTON (Lat: 33.598158,  Lng: -80.331200),  Route carried "under" structure: State highway 25,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 550 (year 2020),  Truck Traffic: 6%,  Features Intersected: S-25 & S-38,  Facility Carried by Structure: I-95 NB
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 22.468,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 4988,  Location: 1MI SE OF SUMMERTON (Lat: 33.598389,  Lng: -80.331372),  Route carried "under" structure: State highway 25,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 550 (year 2020),  Truck Traffic: 6%,  Features Intersected: S-25,  Facility Carried by Structure: I-95 SB
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 22.499,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 4999,  Location: 1MI S SUMMERTON (Lat: 33.589219,  Lng: -80.356728),  Route carried "under" structure: Interstate 95,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 30,600 (year 2020),  Truck Traffic: 19%,  Features Intersected: I-95,  Facility Carried by Structure: S-14-102
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 173.874,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 5268,  Location: 1MI S SUMMERTON (Lat: 33.592761,  Lng: -80.347042),  Route carried "under" structure: Interstate 95,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 29,000 (year 2020),  Truck Traffic: 19%,  Features Intersected: I-95,  Facility Carried by Structure: S-14-56
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 174.855,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 5272,  Location: 3MI SW SUMMERTON (Lat: 33.566750,  Lng: -80.389542),  Route carried "under" structure: Interstate 95,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 30,600 (year 2020),  Truck Traffic: 19%,  Features Intersected: I-95,  Facility Carried by Structure: S-14-373
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 169.931,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 5273,  Location: 6MI SW MANNING (Lat: 33.618175,  Lng: -80.307750),  Route carried "under" structure: Interstate 95,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 29,000 (year 2020),  Truck Traffic: 19%,  Features Intersected: I-95,  Facility Carried by Structure: S-14-420
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 179.555,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Discuss Summerton, South Carolina (SC) on our hugely popular South Carolina forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.