Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Toledo, Ohio (OH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 309Number of bridges
  • 7,083ft / 2,159mTotal length
  • $659,445,000Total costs
  • 7,287,020Total average daily traffic
  • 979,698Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Toledo
  • No street view available for this location

New bridges in Toledo, OH - historical statistics
  • New bridges - historical statistics
  • 51910-1919
  • 21920-1929
  • 71930-1939
  • 31940-1949
  • 201950-1959
  • 571960-1969
  • 371970-1979
  • 141980-1989
  • 281990-1999
  • 562000-2009
  • 612010-2019
  • 192020-2022
Reconstructed bridges in Toledo, OH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
  • 31980-1989
  • 111990-1999
  • 192000-2009
  • 192010-2019
  • 52020-2022
Average Bridge Daily Traffic in Toledo, OH
Average Bridge Truck Traffic in Toledo, OH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 32.0%Excellent
  • 32.6%Very good
  • 23.3%Good
  • 7.0%Satisfactory
  • 3.5%Fair
  • 1.2%Poor
  • 0.6%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.2%Excellent
  • 26.4%Very good
  • 31.6%Good
  • 10.9%Satisfactory
  • 1.7%Fair
  • 1.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.9%Excellent
  • 29.3%Very good
  • 33.3%Good
  • 10.9%Satisfactory
  • 0.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 24.7%Excellent
  • 34.4%Very good
  • 24.7%Good
  • 12.9%Satisfactory
  • 2.2%Fair
  • 1.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Very good
  • 55.6%Good
  • 27.8%Satisfactory
Find on map >>   Show street view

Structure Number: 4861701,  Location: E. OF NORTH HAVEN (Lat: 41.704739,  Lng: -83.567639),  Route carried "on" structure: City street M0344,  Year Built: 1976,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,007 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,398 (year 2014),  Design Load: HS 20,  Features Intersected: SHANTEE CREEK,  Facility Carried by Structure: CRIBB STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.012,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 4861728,  Location: W. OF NORTH HAVEN (Lat: 41.703800,  Lng: -83.569539),  Route carried "on" structure: City street M0630,  Year Built: 1976,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 798 (year 1995),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,108 (year 2015),  Design Load: HS 20,  Features Intersected: SHANTEE CREEK,  Facility Carried by Structure: HAWK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.028,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 4861761,  Location: 165' W OF OTTAWA PARKWAY (Lat: 41.666911,  Lng: -83.594261),  Route carried "on" structure: City street M2460,  Year Built: 2016,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 500 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,796 (year 2035),  Design Load: HL 93,  Features Intersected: OTTAWA RIVER,  Facility Carried by Structure: EAST CIRCLE LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.849,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.4m (37.4ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 3.3m (10.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4861949,  Location: S. OF LUDDINGTON (Lat: 41.664339,  Lng: -83.690450),  Route carried "on" structure: City street M2110,  Year Built: 1950,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,382 (year 1997),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,918 (year 2017),  Design Load: HS 20,  Features Intersected: HILL DITCH,  Facility Carried by Structure: ORCHARD HILLS BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.595,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 8729085,  Location: 3.7MI EAST OF EXIT 59 (Lat: 41.577431,  Lng: -83.601461),  Route carried "on" structure: Interstate 80K,  Year Built: 1954,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 15,824 (year 2015),  Truck Traffic: 37%,  Average Future Daily Traffic: 21,964 (year 2035),  Design Load: HS 20,  Features Intersected: SR65,  Facility Carried by Structure: I80 OH TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4800249,  Location: JCT. SR 2 & IR 75 (Lat: 41.637650,  Lng: -83.546769),  Route carried "under" structure: City street M1086,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 565 (year 0209),  Truck Traffic: 23%,  Features Intersected: SR 2
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 11.346,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 4800303,  Location: 0.2 mile East of Summit (Lat: 41.641889,  Lng: -83.539981),  Route carried "under" structure: City street M1645,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 2
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 0.208,  Lanes on structure: 4,  Lanes under structure: 13,  Material/Design: Steel,  Design/Construction: Suspension,  Length of Maximum Span: 239.3m (785.1ft)

Find on map >>   Show street view

Structure Number: 4800303,  Location: 0.2 mile East of Summit (Lat: 41.641889,  Lng: -83.539981),  Route carried "under" structure: County highway C0557,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 7,311 (year 2019),  Truck Traffic: 11%,  Features Intersected: SR 2
Minimum Vertical Clearance: 15.26m (50.07ft),  Kilometerpoint: 1.341,  Lanes on structure: 4,  Lanes under structure: 13,  Material/Design: Steel,  Design/Construction: Suspension,  Length of Maximum Span: 239.3m (785.1ft)

Find on map >>   Show street view

Structure Number: 4800303,  Location: 0.2 mile East of Summit (Lat: 41.641889,  Lng: -83.539981),  Route carried "under" structure: City street M1731,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 2
Minimum Vertical Clearance: 11.63m (38.16ft),  Kilometerpoint: 0.182,  Lanes on structure: 4,  Lanes under structure: 13,  Material/Design: Steel,  Design/Construction: Suspension,  Length of Maximum Span: 239.3m (785.1ft)

Find on map >>   Show street view

Structure Number: 4800303,  Location: 0.2 mile East of Summit (Lat: 41.641889,  Lng: -83.539981),  Route carried "under" structure: City street M2102,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2019),  Features Intersected: SR 2
Minimum Vertical Clearance: 4.04m (13.25ft),  Kilometerpoint: 1.907,  Lanes on structure: 4,  Lanes under structure: 13,  Material/Design: Steel,  Design/Construction: Suspension,  Length of Maximum Span: 239.3m (785.1ft)

Find on map >>   Show street view

Structure Number: 4800303,  Location: 0.2 mile East of Summit (Lat: 41.641889,  Lng: -83.539981),  Route carried "under" structure: City street M2255,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 750 (year 2019),  Features Intersected: SR 2
Minimum Vertical Clearance: 3.91m (12.83ft),  Kilometerpoint: 1.345,  Lanes on structure: 4,  Lanes under structure: 13,  Material/Design: Steel,  Design/Construction: Suspension,  Length of Maximum Span: 239.3m (785.1ft)

Find on map >>   Show street view

Structure Number: 4800613,  Location: JCT. USR 20 AND IR 475 (Lat: 41.674689,  Lng: -83.694369),  Route carried "under" structure: Interstate 475,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 92,002 (year 2019),  Truck Traffic: 9%,  Features Intersected: USR 20
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 24.591,  Lanes on structure: 6,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.5m (90.2ft)

Find on map >>   Show street view

Structure Number: 4801563,  Location: WB SR 25 over Collingwood (Lat: 41.641881,  Lng: -83.551581),  Route carried "under" structure: City street C0514,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 6,499 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 25,  Facility Carried by Structure: CR 514 Collingwood
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 12.167,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 4801598,  Location: EB SR-25 over Collingwood (Lat: 41.641861,  Lng: -83.551400),  Route carried "under" structure: City street C0514,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 6,499 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 25
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 11.282,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 480216,  Location: .09 MI S OF HILL AVE-US24 (Lat: 41.637500,  Lng: -83.591111),  Route carried "under" structure: US 24,  Year Built: 1912,  Structure Length: 0. m,  Average Daily Traffic: 19,283 (year 2017),  Truck Traffic: 6%,  Features Intersected: NS RR PRIVATE RD
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 36.210,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.7m (64.6ft)

Find on map >>   Show street view

Structure Number: 4802373,  Location: JCT IR 75 & USR 24 (Lat: 41.666869,  Lng: -83.568869),  Route carried "under" structure: Interstate 75,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 87,560 (year 2010),  Truck Traffic: 15%,  Features Intersected: USR 24
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 6.421,  Lanes on structure: 6,  Lanes under structure: 9,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 4802706,  Location: 750 Ft. S. of Maumee Riv. (Lat: 41.620261,  Lng: -83.541189),  Route carried "under" structure: State highway 65,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 21,504 (year 2019),  Truck Traffic: 7%,  Features Intersected: IR 75
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.602,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.0m (85.3ft)

Find on map >>   Show street view

Structure Number: 4802775,  Location: 0.84 MI. N. OF COUNTY LIN (Lat: 41.629711,  Lng: -83.542181),  Route carried "under" structure: City street C0533,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 8,264 (year 2019),  Truck Traffic: 7%,  Features Intersected: IR 75
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 4.720,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 4802854,  Location: IR 75 over Segur Ave (Lat: 41.636669,  Lng: -83.543889),  Route carried "under" structure: City street M1933,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2019),  Features Intersected: IR 75
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 11.394,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.6m (93.8ft)

Find on map >>   Show street view

Structure Number: 4802889,  Location: JCT. SR 2 (Lat: 41.637481,  Lng: -83.544719),  Route carried "under" structure: State highway 2,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 2019),  Truck Traffic: 5%,  Features Intersected: IR 75
Minimum Vertical Clearance: 5.17m (16.96ft),  Kilometerpoint: 29.290,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 69.9m (229.3ft)

Find on map >>   Show street view

Structure Number: 4802889,  Location: JCT. SR 2 (Lat: 41.637481,  Lng: -83.544719),  Route carried "under" structure: City street M1086,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 822 (year 2019),  Truck Traffic: 17%,  Features Intersected: IR 75,  Facility Carried by Structure: Emerald Ave.
Minimum Vertical Clearance: 9.45m (31.00ft),  Kilometerpoint: 0.819,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 69.9m (229.3ft)

Find on map >>   Show street view

Structure Number: 4802943,  Location: 1.52 MI. NORTH of SR 65 (Lat: 41.640561,  Lng: -83.548061),  Route carried "under" structure: City street C0514,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 6,499 (year 2019),  Truck Traffic: 5%,  Features Intersected: IR 75,  Facility Carried by Structure: CR 514 COLLINGWOOD
Minimum Vertical Clearance: 8.78m (28.81ft),  Kilometerpoint: 0.451,  Lanes on structure: 3,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.0m (200.1ft)

Find on map >>   Show street view

Structure Number: 4802943,  Location: 1.52 MI. NORTH of SR 65 (Lat: 41.640561,  Lng: -83.548061),  Route carried "under" structure: Ramp State highway 25,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 1,505 (year 2019),  Truck Traffic: 4%,  Features Intersected: IR 75
Minimum Vertical Clearance: 6.49m (21.29ft),  Kilometerpoint: 13.657,  Lanes on structure: 3,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.0m (200.1ft)

Find on map >>   Show street view

Structure Number: 4802943,  Location: 1.52 MI. NORTH of SR 65 (Lat: 41.640561,  Lng: -83.548061),  Route carried "under" structure: Ramp State highway 25,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 7,555 (year 2019),  Truck Traffic: 7%,  Features Intersected: IR 75
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 13.657,  Lanes on structure: 3,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.0m (200.1ft)

Find on map >>   Show street view

Structure Number: 4802943,  Location: 1.52 MI. NORTH of SR 65 (Lat: 41.640561,  Lng: -83.548061),  Route carried "under" structure: City street C0518,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 1,505 (year 2019),  Truck Traffic: 4%,  Features Intersected: IR 75,  Facility Carried by Structure: CR 518 ERIE ST.
Minimum Vertical Clearance: 6.01m (19.72ft),  Kilometerpoint: 0.026,  Lanes on structure: 3,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.0m (200.1ft)

Find on map >>   Show street view

Structure Number: 4802943,  Location: 1.52 MI. NORTH of SR 65 (Lat: 41.640561,  Lng: -83.548061),  Route carried "under" structure: State highway 25,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 24,316 (year 2019),  Truck Traffic: 4%,  Features Intersected: IR 75
Minimum Vertical Clearance: 7.50m (24.61ft),  Kilometerpoint: 13.657,  Lanes on structure: 3,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.0m (200.1ft)

Find on map >>   Show street view

Structure Number: 4802944,  Location: 1.52 MILES NORTH SR 65 (Lat: 41.640719,  Lng: -83.548150),  Route carried "under" structure: Ramp State highway 25,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 7,555 (year 2019),  Truck Traffic: 7%,  Features Intersected: IR 75
Minimum Vertical Clearance: 6.19m (20.31ft),  Kilometerpoint: 13.691,  Lanes on structure: 3,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 60.8m (199.5ft)

Find on map >>   Show street view

Structure Number: 4802944,  Location: 1.52 MILES NORTH SR 65 (Lat: 41.640719,  Lng: -83.548150),  Route carried "under" structure: Ramp State highway 25,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 1,505 (year 2019),  Truck Traffic: 4%,  Features Intersected: IR 75
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 13.691,  Lanes on structure: 3,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 60.8m (199.5ft)

Find on map >>   Show street view

Structure Number: 4802944,  Location: 1.52 MILES NORTH SR 65 (Lat: 41.640719,  Lng: -83.548150),  Route carried "under" structure: State highway 25,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 24,316 (year 2019),  Truck Traffic: 4%,  Features Intersected: IR 75
Minimum Vertical Clearance: 6.93m (22.74ft),  Kilometerpoint: 13.691,  Lanes on structure: 3,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 60.8m (199.5ft)

Find on map >>   Show street view

Structure Number: 4802944,  Location: 1.52 MILES NORTH SR 65 (Lat: 41.640719,  Lng: -83.548150),  Route carried "under" structure: City street C0518,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 1,505 (year 2019),  Truck Traffic: 4%,  Features Intersected: IR 75,  Facility Carried by Structure: CR 518 ERIE ST.
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 0.051,  Lanes on structure: 3,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 60.8m (199.5ft)

Find on map >>   Show street view

Structure Number: 4802944,  Location: 1.52 MILES NORTH SR 65 (Lat: 41.640719,  Lng: -83.548150),  Route carried "under" structure: City street C0514,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 6,499 (year 2019),  Truck Traffic: 5%,  Features Intersected: IR 75,  Facility Carried by Structure: CR 514 COLLINGWOOD
Minimum Vertical Clearance: 8.08m (26.51ft),  Kilometerpoint: 0.443,  Lanes on structure: 3,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 60.8m (199.5ft)

Find on map >>   Show street view

Structure Number: 4803095,  Location: IR 75 UNDER INDIANA AVE. (Lat: 41.650361,  Lng: -83.549050),  Route carried "under" structure: Interstate 75,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 112,610 (year 2018),  Truck Traffic: 23%,  Features Intersected: INDIANA AVE
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 3.766,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 4803159,  Location: I-75 under Collingwood (Lat: 41.654711,  Lng: -83.554861),  Route carried "under" structure: Interstate 75,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 84,445 (year 2018),  Truck Traffic: 22%,  Features Intersected: COLLINGWOOD AVE
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 4.506,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 4803183,  Location: I-75 under Oakwood Ave. (Lat: 41.656619,  Lng: -83.559350),  Route carried "under" structure: Interstate 75,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 90,000 (year 2018),  Truck Traffic: 22%,  Features Intersected: OAKWOOD AVE
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 4.844,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.2m (190.9ft)

Find on map >>   Show street view

Structure Number: 4803213,  Location: I-75 under Lincoln Ave. (Lat: 41.657500,  Lng: -83.561561),  Route carried "under" structure: Interstate 75,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 90,000 (year 2018),  Truck Traffic: 22%,  Features Intersected: LINCOLN AVE
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 5.053,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 4803272,  Location: I-75 under Bancroft St. (Lat: 41.663750,  Lng: -83.564339),  Route carried "under" structure: Interstate 75,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 85,337 (year 2018),  Truck Traffic: 22%,  Features Intersected: BANCROFT ST
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 5.858,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 4803361,  Location: I-75 under Delaware Ave. (Lat: 41.670831,  Lng: -83.573031),  Route carried "under" structure: Interstate 75,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 85,958 (year 2018),  Truck Traffic: 22%,  Features Intersected: DELAWARE AVE
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 6.985,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 4803418,  Location: JCT. IR 475/IR 75 (Lat: 41.674550,  Lng: -83.573919),  Route carried "under" structure: Ramp Interstate 475,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 26,060 (year 2010),  Truck Traffic: 17%,  Features Intersected: IR 75 SB
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 7.419,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.1m (121.7ft)

Find on map >>   Show street view

Structure Number: 4803671,  Location: I-75 over Willys Parkway (Lat: 41.681981,  Lng: -83.571469),  Route carried "under" structure: Ramp Interstate 75,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 8,632 (year 2014),  Truck Traffic: 4%,  Features Intersected: IR 75 SB RAMP,  Facility Carried by Structure: WILLYS RAMP TO SB
Minimum Vertical Clearance: 5.34m (17.52ft),  Kilometerpoint: 8.240,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.8m (81.4ft)

Find on map >>   Show street view

Structure Number: 4803701,  Location: JCT. IR 75/WILLYS PKWY (Lat: 41.683331,  Lng: -83.570281),  Route carried "under" structure: City street C2230,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 9,370 (year 2014),  Truck Traffic: 2%,  Features Intersected: IR 75,  Facility Carried by Structure: WILLYS PKWY
Minimum Vertical Clearance: 5.37m (17.62ft),  Kilometerpoint: 0.085,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 4803744,  Location: JCT. IR 75/WILLYS PKWY (Lat: 41.682781,  Lng: -83.569719),  Route carried "under" structure: City street C2230,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 9,370 (year 2014),  Truck Traffic: 2%,  Features Intersected: IR 75,  Facility Carried by Structure: WILLYS PARKWAY
Minimum Vertical Clearance: 5.37m (17.62ft),  Kilometerpoint: 8.369,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.0m (108.3ft)

Find on map >>   Show street view

Structure Number: 480376,  Location: JCT I-75 and WILLYS PKWY (Lat: 41.683331,  Lng: -83.570831),  Route carried "under" structure: City street C2230,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 9,370 (year 2014),  Truck Traffic: 2%,  Features Intersected: IR 75 Ramp,  Facility Carried by Structure: WILLYS PARKWAY
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 8.369,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 4803787,  Location: 0.2 MI E INT USR24 & IR75 (Lat: 41.686931,  Lng: -83.552139),  Route carried "under" structure: City street C0510,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 11,296 (year 2015),  Truck Traffic: 7%,  Features Intersected: IR 75,  Facility Carried by Structure: Phillips Ave.
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 6.550,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 4803795,  Location: 1.05 Mi. N. of I-475 (Lat: 41.688461,  Lng: -83.562381),  Route carried "under" structure: US 24,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 16,400 (year 2014),  Truck Traffic: 8%,  Features Intersected: IR 75
Minimum Vertical Clearance: 7.41m (24.31ft),  Kilometerpoint: 42.678,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.9m (160.4ft)

Find on map >>   Show street view

Structure Number: 4803795,  Location: 1.05 Mi. N. of I-475 (Lat: 41.688461,  Lng: -83.562381),  Route carried "under" structure: County highway C0500,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 20,840 (year 2014),  Truck Traffic: 2%,  Features Intersected: IR 75,  Facility Carried by Structure: CR 500 BERDAN AVE.
Minimum Vertical Clearance: 5.83m (19.13ft),  Kilometerpoint: 9.447,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.9m (160.4ft)

Find on map >>   Show street view

Structure Number: 4803809,  Location: 1.05 MI. N of I-475 (Lat: 41.688369,  Lng: -83.562219),  Route carried "under" structure: County highway C0500,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 20,840 (year 2014),  Truck Traffic: 2%,  Features Intersected: IR 75,  Facility Carried by Structure: CR 500 BERDAN AVE.
Minimum Vertical Clearance: 5.83m (19.13ft),  Kilometerpoint: 9.415,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.9m (160.4ft)

Find on map >>   Show street view

Structure Number: 4803809,  Location: 1.05 MI. N of I-475 (Lat: 41.688369,  Lng: -83.562219),  Route carried "under" structure: US 24,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 16,400 (year 2014),  Truck Traffic: 8%,  Features Intersected: IR 75
Minimum Vertical Clearance: 7.41m (24.31ft),  Kilometerpoint: 42.644,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.9m (160.4ft)

Find on map >>   Show street view

Structure Number: 4803876,  Location: I-75 over Lagrange St. (Lat: 41.688669,  Lng: -83.544931),  Route carried "under" structure: City street C0506,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 7,616 (year 2015),  Truck Traffic: 7%,  Features Intersected: IR 75,  Facility Carried by Structure: LAGRANGE ST.
Minimum Vertical Clearance: 5.14m (16.86ft),  Kilometerpoint: 6.582,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 4803973,  Location: 0.5 Mi. E. of LaGrange St (Lat: 41.689269,  Lng: -83.534469),  Route carried "under" structure: Interstate 75,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 79,462 (year 2019),  Truck Traffic: 23%,  Features Intersected: Polish Village Overpass
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 11.652,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 4804058,  Location: IR 75 over Stickney Ave. (Lat: 41.689850,  Lng: -83.527239),  Route carried "under" structure: City street M0169,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 11,003 (year 2019),  Truck Traffic: 3%,  Features Intersected: IR 75,  Facility Carried by Structure: Stickey Ave.
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 6.630,  Lanes on structure: 8,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 4804279,  Location: JCT. IR 75 & IR 280 (Lat: 41.690131,  Lng: -83.518519),  Route carried "under" structure: Interstate 280,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 14,040 (year 2018),  Truck Traffic: 14%,  Features Intersected: IR 75
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 12.987,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 4804333,  Location: JCT. IR 75 & IR 280 (Lat: 41.690231,  Lng: -83.516731),  Route carried "under" structure: Interstate 280,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 14,347 (year 2017),  Truck Traffic: 29%,  Features Intersected: IR 75
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 13.148,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 4804414,  Location: 1/4 MI N OF JCT IR 280 (Lat: 41.691411,  Lng: -83.510669),  Route carried "under" structure: County highway C2240,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 4,735 (year 2018),  Truck Traffic: 7%,  Features Intersected: IR 75,  Facility Carried by Structure: CR 2240 CHRYSLER
Minimum Vertical Clearance: 6.76m (22.18ft),  Kilometerpoint: 0.409,  Lanes on structure: 7,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 4804473,  Location: 1/2 MI W. OF JCT IR 280 (Lat: 41.691789,  Lng: -83.508481),  Route carried "under" structure: City street M1336,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 1974),  Features Intersected: IR 75
Minimum Vertical Clearance: 6.65m (21.82ft),  Kilometerpoint: 0.441,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 4804678,  Location: 150 YDS W JCT SUDER AVE (Lat: 41.706461,  Lng: -83.501939),  Route carried "under" structure: Interstate 75,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 64,045 (year 2019),  Truck Traffic: 23%,  Features Intersected: OTTAWA RIVER ROAD RAMP
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 15.804,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 4804724,  Location: 100 YDS. WEST OF SUDER (Lat: 41.712661,  Lng: -83.501611),  Route carried "under" structure: Interstate 75,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 60,874 (year 2010),  Truck Traffic: 31%,  Features Intersected: BENORE ROAD
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 16.447,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 4804759,  Location: 1/4 MI N ALEXIS RD INTER (Lat: 41.725639,  Lng: -83.495331),  Route carried "under" structure: Interstate 75,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 54,240 (year 2010),  Truck Traffic: 32%,  Features Intersected: SUDER AVENUE
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 18.153,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 4805038,  Location: JCT IR 75 (Lat: 41.678000,  Lng: -83.573750),  Route carried "under" structure: Interstate 75,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 92,832 (year 2015),  Truck Traffic: 15%,  Features Intersected: SR 120
Minimum Vertical Clearance: 5.47m (17.95ft),  Kilometerpoint: 7.805,  Lanes on structure: 5,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 4805127,  Location: JCT. SR 184/STICKNEY AVE (Lat: 41.722539,  Lng: -83.529269),  Route carried "under" structure: City street C0169,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 2,414 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 184
Minimum Vertical Clearance: 7.75m (25.43ft),  Kilometerpoint: 7.451,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 4805178,  Location: 0.5 MI S SUDER AVE & IR75 (Lat: 41.721431,  Lng: -83.501300),  Route carried "under" structure: Interstate 75,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 64,045 (year 2019),  Truck Traffic: 23%,  Features Intersected: SR 184
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 17.429,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 4805259,  Location: Monroe SR 51 over IR 475 (Lat: 41.685281,  Lng: -83.614039),  Route carried "under" structure: Interstate 475,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 75,286 (year 2019),  Truck Traffic: 9%,  Features Intersected: SR 51 MONROE ST.
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 22.499,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 4805372,  Location: Monroe St SR-51 over I-75 (Lat: 41.661419,  Lng: -83.563661),  Route carried "under" structure: Interstate 75,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 96,886 (year 2015),  Truck Traffic: 14%,  Features Intersected: SR 51
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 5.617,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 4805497,  Location: DORR ST. OVER IR 75 (Lat: 41.652969,  Lng: -83.552100),  Route carried "under" structure: Interstate 75,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 112,610 (year 2018),  Truck Traffic: 12%,  Features Intersected: SR 246 Dorr St.
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 4.104,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 51.1m (167.7ft)

Find on map >>   Show street view

Structure Number: 4805739,  Location: 1.1 MI SE OF SR 65 (Lat: 41.643561,  Lng: -83.497750),  Route carried "under" structure: County highway C0555,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 9,226 (year 2019),  Truck Traffic: 3%,  Features Intersected: IR 280,  Facility Carried by Structure: CR 555 Starr Ave.
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 1.754,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 4805763,  Location: 0.60 MI SE OF SR 65 (Lat: 41.650111,  Lng: -83.501850),  Route carried "under" structure: County highway 525,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 2,758 (year 2019),  Truck Traffic: 2%,  Features Intersected: IR 280
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 2.414,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 4805836,  Location: S. SB APPR SPAN TO VGCS (Lat: 41.652269,  Lng: -83.503689),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 4,070 (year 2019),  Truck Traffic: 11%,  Features Intersected: IR 280 SB
Minimum Vertical Clearance: 6.99m (22.93ft),  Kilometerpoint: 9.093,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 4805844,  Location: S. NB APPR SPAN TO VGCS (Lat: 41.651589,  Lng: -83.503211),  Route carried "under" structure: State highway 65,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 13,189 (year 2019),  Truck Traffic: 10%,  Features Intersected: IR 280 NB
Minimum Vertical Clearance: 12.19m (39.99ft),  Kilometerpoint: 9.344,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 4805844,  Location: S. NB APPR SPAN TO VGCS (Lat: 41.651589,  Lng: -83.503211),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 4,070 (year 2019),  Truck Traffic: 11%,  Features Intersected: IR 280 NB
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 9.093,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 480586,  Location: RAMP A,SB,FROM GREENBELT (Lat: 41.669761,  Lng: -83.515261),  Route carried "under" structure: City street C7008,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 565 (year 2019),  Truck Traffic: 55%,  Features Intersected: IR 280 RAMP A
Minimum Vertical Clearance: 7.32m (24.02ft),  Kilometerpoint: 2.583,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 480586,  Location: RAMP A,SB,FROM GREENBELT (Lat: 41.669761,  Lng: -83.515261),  Route carried "under" structure: City street C0577,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 920 (year 2019),  Truck Traffic: 14%,  Features Intersected: IR 280 RAMP A
Minimum Vertical Clearance: 7.19m (23.59ft),  Kilometerpoint: 1.819,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 4805879,  Location: RAMP D TO GALENA ST. (Lat: 41.670889,  Lng: -83.514681),  Route carried "under" structure: City street C0577,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 920 (year 2019),  Truck Traffic: 14%,  Features Intersected: IR 280 RAMP D,  Facility Carried by Structure: CHAMPLAIN ST.
Minimum Vertical Clearance: 7.22m (23.69ft),  Kilometerpoint: 1.917,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.1m (148.0ft)

Find on map >>   Show street view

Structure Number: 4805992,  Location: NB RAMP Y FROM FRONT ST (Lat: 41.655000,  Lng: -83.502789),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 3,869 (year 2019),  Truck Traffic: 9%,  Features Intersected: IR 280 RAMP Y
Minimum Vertical Clearance: 7.52m (24.67ft),  Kilometerpoint: 0.517,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 4806018,  Location: SB RMP Z TO SR 65/FRNT ST (Lat: 41.656919,  Lng: -83.509150),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 3,869 (year 2019),  Truck Traffic: 9%,  Features Intersected: IR 280 RAMP Z
Minimum Vertical Clearance: 7.52m (24.67ft),  Kilometerpoint: 5.118,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: 4806018,  Location: SB RMP Z TO SR 65/FRNT ST (Lat: 41.656919,  Lng: -83.509150),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 4,087 (year 2019),  Truck Traffic: 9%,  Features Intersected: IR 280 RAMP Z
Minimum Vertical Clearance: 7.52m (24.67ft),  Kilometerpoint: 5.134,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: 4806107,  Location: N.NB.APPR.SPAN TO VGCS. (Lat: 41.663050,  Lng: -83.513150),  Route carried "under" structure: City street C7008,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 565 (year 2019),  Truck Traffic: 55%,  Features Intersected: IR 280 NB
Minimum Vertical Clearance: 10.21m (33.50ft),  Kilometerpoint: 2.092,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: 4806107,  Location: N.NB.APPR.SPAN TO VGCS. (Lat: 41.663050,  Lng: -83.513150),  Route carried "under" structure: City street M3685,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 750 (year 2019),  Truck Traffic: 4%,  Features Intersected: IR 280 NB
Minimum Vertical Clearance: 11.81m (38.75ft),  Kilometerpoint: 1.320,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: 4806107,  Location: N.NB.APPR.SPAN TO VGCS. (Lat: 41.663050,  Lng: -83.513150),  Route carried "under" structure: City street C7007,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 553 (year 2019),  Truck Traffic: 9%,  Features Intersected: IR 280 NB
Minimum Vertical Clearance: 11.74m (38.52ft),  Kilometerpoint: 0.328,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: 4806107,  Location: N.NB.APPR.SPAN TO VGCS. (Lat: 41.663050,  Lng: -83.513150),  Route carried "under" structure: City street M1720,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 1,789 (year 2019),  Truck Traffic: 2%,  Features Intersected: IR 280 NB
Minimum Vertical Clearance: 11.13m (36.52ft),  Kilometerpoint: 2.623,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: 4806107,  Location: N.NB.APPR.SPAN TO VGCS. (Lat: 41.663050,  Lng: -83.513150),  Route carried "under" structure: City street C1980,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 7,231 (year 2019),  Truck Traffic: 5%,  Features Intersected: IR 280 NB
Minimum Vertical Clearance: 13.87m (45.51ft),  Kilometerpoint: 12.826,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: 4806107,  Location: N.NB.APPR.SPAN TO VGCS. (Lat: 41.663050,  Lng: -83.513150),  Route carried "under" structure: City street C0577,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 920 (year 2019),  Truck Traffic: 14%,  Features Intersected: IR 280 NB
Minimum Vertical Clearance: 8.69m (28.51ft),  Kilometerpoint: 1.867,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: 4806107,  Location: N.NB.APPR.SPAN TO VGCS. (Lat: 41.663050,  Lng: -83.513150),  Route carried "under" structure: City street C7005,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 593 (year 2019),  Truck Traffic: 16%,  Features Intersected: IR 280 NB
Minimum Vertical Clearance: 12.19m (39.99ft),  Kilometerpoint: 1.304,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: 4806115,  Location: N.SB.APPR.SPAN TO VGCS (Lat: 41.663081,  Lng: -83.513461),  Route carried "under" structure: City street C0577,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 920 (year 2019),  Truck Traffic: 14%,  Features Intersected: IR 280 SB
Minimum Vertical Clearance: 8.28m (27.17ft),  Kilometerpoint: 1.819,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 4806115,  Location: N.SB.APPR.SPAN TO VGCS (Lat: 41.663081,  Lng: -83.513461),  Route carried "under" structure: City street C1980,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 7,231 (year 2019),  Truck Traffic: 5%,  Features Intersected: IR 280 SB
Minimum Vertical Clearance: 13.84m (45.41ft),  Kilometerpoint: 12.810,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 4806115,  Location: N.SB.APPR.SPAN TO VGCS (Lat: 41.663081,  Lng: -83.513461),  Route carried "under" structure: City street M1720,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 1,789 (year 2019),  Truck Traffic: 2%,  Features Intersected: IR 280 SB
Minimum Vertical Clearance: 11.13m (36.52ft),  Kilometerpoint: 2.575,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 4806115,  Location: N.SB.APPR.SPAN TO VGCS (Lat: 41.663081,  Lng: -83.513461),  Route carried "under" structure: City street C7008,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 565 (year 2019),  Truck Traffic: 55%,  Features Intersected: IR 280 SB
Minimum Vertical Clearance: 10.21m (33.50ft),  Kilometerpoint: 2.044,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 4806115,  Location: N.SB.APPR.SPAN TO VGCS (Lat: 41.663081,  Lng: -83.513461),  Route carried "under" structure: City street C7005,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 593 (year 2019),  Truck Traffic: 16%,  Features Intersected: IR 280 SB
Minimum Vertical Clearance: 12.19m (39.99ft),  Kilometerpoint: 1.287,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 4806115,  Location: N.SB.APPR.SPAN TO VGCS (Lat: 41.663081,  Lng: -83.513461),  Route carried "under" structure: City street M3685,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 750 (year 2019),  Truck Traffic: 4%,  Features Intersected: IR 280 SB
Minimum Vertical Clearance: 11.81m (38.75ft),  Kilometerpoint: 1.304,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 4806115,  Location: N.SB.APPR.SPAN TO VGCS (Lat: 41.663081,  Lng: -83.513461),  Route carried "under" structure: City street C7007,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 553 (year 2019),  Truck Traffic: 9%,  Features Intersected: IR 280 SB
Minimum Vertical Clearance: 11.74m (38.52ft),  Kilometerpoint: 0.370,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.7m (149.9ft)

Discuss Toledo, Ohio (OH) on our hugely popular Ohio forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.