ST. CLOUD, Minn. – A $2.3 million federal stimulus project at the Veterans Affairs Medical Center in St. Cloud is giving green energy initiatives a bad name.
A 600-kilowatt wind turbine -- some 245 foot tall -- stands on the wintry VA grounds, frozen in time and temperature, essentially inoperable for the past 1 1/2 years. No one is working to fix it, though many attempts were made to repair the turbine, once billed as a model green energy project.
Veterans Affairs wind turbine, built for $2.3 million, stands dormant | Fox News