Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Springfield, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 71Number of bridges
  • 1,916ft / 584mTotal length
  • $432,408,000Total costs
  • 2,980,672Total average daily traffic
  • 154,192Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Springfield
  • No street view available for this location

New bridges in Springfield, MA - historical statistics
  • New bridges - historical statistics
  • 3Before 1900
  • 21900-1909
  • 41920-1929
  • 61930-1939
  • 91950-1959
  • 371960-1969
  • 71970-1979
  • 11990-1999
  • 22010-2019
Reconstructed bridges in Springfield, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21920-1929
  • 01930-1939
  • 11940-1949
  • 21950-1959
  • 11960-1969
  • 11970-1979
  • 11980-1989
  • 21990-1999
  • 12000-2009
  • 52010-2019
Average Bridge Daily Traffic in Springfield, MA
Average Bridge Truck Traffic in Springfield, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.7%Excellent
  • 3.7%Very good
  • 25.9%Good
  • 40.7%Satisfactory
  • 22.2%Fair
  • 3.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.1%Very good
  • 13.6%Good
  • 33.9%Satisfactory
  • 40.7%Fair
  • 6.8%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.7%Very good
  • 20.3%Good
  • 44.1%Satisfactory
  • 30.5%Fair
  • 3.4%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Good
  • 64.3%Satisfactory
  • 7.1%Fair
Find on map >>   Show street view

Structure Number: S240030UJDOTNBI,  Location: NORTH END BRIDGE (Lat: 42.108856,  Lng: -72.613983),  Route carried "on" structure: US 20,  Year Built: 1924,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 36.13m (118.54ft),  Average Daily Traffic: 31,000 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 23,690 (year 2032),  Design Load: HS 20,  Features Intersected: WATER CONNECTICUT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 100.774,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Navigation Control: Yes ( Vertical Clearance: 48.8m (160.1ft), Horizontal Clearance: 8.5m (27.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 2,  Length of Maximum Span: 50.2m (164.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 36.20m (118.77ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $30,288,000,  Roadway Improvement Cost: $3,029,000,  Total Project Cost: $45,433,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S2401614JDOT634,  Location: AT JCT ALBANY ST. (Lat: 42.115478,  Lng: -72.581867),  Route carried "on" structure: City street ,  Year Built: 1934,  Status: Posted for load,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 35,000 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,915 (year 2031),  Features Intersected: RR CSX,  Facility Carried by Structure: HWY ARMORY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.6m (90.6ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $4,479,000,  Roadway Improvement Cost: $448,000,  Total Project Cost: $6,719,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: S2401714KDOT634,  Location: ADJACENT TO I-291 (Lat: 42.126364,  Lng: -72.567019),  Route carried "on" structure: City street ,  Year Built: 1956,  Year Reconstructed: 1969,  Status: Temporarily open,  Structure Length: 2.63m (8.63ft),  Average Daily Traffic: 34,300 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 29,817 (year 2032),  Design Load: HS 20,  Features Intersected: RR CSX,  Facility Carried by Structure: HWY ST JAMES AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.5m (83.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 28.0m (91.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 49.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,970,000,  Roadway Improvement Cost: $298,000,  Total Project Cost: $4,456,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S2401814LDOT634,  Location: .1 M S JCT COTTAGE ST. (Lat: 42.140386,  Lng: -72.524350),  Route carried "on" structure: City street ,  Year Built: 1920,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 21,300 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 47,379 (year 2032),  Design Load: H 20,  Features Intersected: RR CSX,  Facility Carried by Structure: HWY BRKSHRE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,907,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $2,861,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: S24019AKCDOT634,  Location: .35 M N JCT BOSTON RD. (Lat: 42.145336,  Lng: -72.503236),  Route carried "on" structure: US 20,  Year Built: 1994,  Status: Open,  Structure Length: 4.65m (15.26ft),  Average Daily Traffic: 23,146 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 34,745 (year 2032),  Design Load: HS 20,  Features Intersected: RR CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 111.315,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.8m (81.4ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.70m (15.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $331,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $497,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S2402214HDOT634,  Location: .15 M W JCT ROCUS ST. (Lat: 42.150822,  Lng: -72.527569),  Route carried "on" structure: US 20,  Year Built: 1968,  Status: Open,  Structure Length: 2.81m (9.22ft),  Average Daily Traffic: 25,200 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 39,167 (year 2031),  Design Load: H 20,  Features Intersected: RR CSX SPURR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 116.352,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,051,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $3,077,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S2402614MDOT634,  Location: S JCT OF ALBANY ST. (Lat: 42.114917,  Lng: -72.581167),  Route carried "on" structure: City street ,  Year Built: 1934,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 20,285 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,159 (year 2031),  Features Intersected: RR CSX (ABANDONED),  Facility Carried by Structure: HWY ARMORY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.7m (61.4ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,195,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,793,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: S2402814NDOT634,  Location: .1 M S JCT ALBANY ST. (Lat: 42.121283,  Lng: -72.570239),  Route carried "on" structure: City street ,  Year Built: 1903,  Year Reconstructed: 1992,  Status: Posted for load,  Structure Length: 1.57m (5.15ft),  Average Daily Traffic: 21,207 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,506 (year 2032),  Features Intersected: RR CONRAIL (ABANDNED),  Facility Carried by Structure: HWY ST JAMES AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 46.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: August 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,200,000,  Roadway Improvement Cost: $221,000,  Total Project Cost: $3,301,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: S2403015BDOTNBI,  Location: MEMRL BR RR#61.43 (Lat: 42.099192,  Lng: -72.594800),  Route carried "on" structure: State highway 147,  Year Built: 1922,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 47.12m (154.59ft),  Average Daily Traffic: 18,907 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 37,587 (year 2031),  Design Load: HS 20,  Features Intersected: COMB AMTRAK & CONN RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.495,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 13.7m (44.9ft), Horizontal Clearance: 52.7m (172.9ft)),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 10,  Length of Maximum Span: 63.7m (209.0ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 25.2m (82.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 70.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 47.20m (154.86ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2020,  Underwater Inspection Date: September 2019,  Bridge Improvement Cost: $46,722,000,  Roadway Improvement Cost: $4,673,000,  Total Project Cost: $70,084,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S240320N7MUNNBI,  Location: .2 MI NW OF WILBRAHAM RD (Lat: 42.115958,  Lng: -72.550578),  Route carried "on" structure: City street ,  Year Built: 1937,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 20,690 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 32,676 (year 2032),  Features Intersected: HWY ROOSEVELT AVE,  Facility Carried by Structure: HWY STATE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.814,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.3m (53.5ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 73.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,402,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $2,104,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: S240330N8MUNNBI,  Location: .5 M S OF WILBRAHAM RD (Lat: 42.105800,  Lng: -72.546456),  Route carried "on" structure: City street ,  Year Built: 1937,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 7.71m (25.30ft),  Average Daily Traffic: 4,785 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,845 (year 2033),  Design Load: HS 20,  Features Intersected: WATER WATERSHOPS POND,  Facility Carried by Structure: HWY ROOSEVELT AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.333,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 66.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $5,577,000,  Roadway Improvement Cost: $558,000,  Total Project Cost: $8,366,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S24037BKHMUNNBI,  Location: .39 MI N ARCH ST (Lat: 42.118797,  Lng: -72.610261),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 1.64m (5.38ft),  Average Daily Traffic: 14,095 (year 2021),  Truck Traffic: 7%,  Design Load: HS 20,  Features Intersected: OTHER GERENA TUNNEL,  Facility Carried by Structure: HWY BIRNIE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,590,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $2,386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S240380N5MUNNBI,  Location: .5M SE OF RTE 116 (Lat: 42.093639,  Lng: -72.569728),  Route carried "on" structure: City street ,  Year Built: 1925,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 17,844 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,844 (year 2032),  Design Load: H 20,  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.078,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: June 2021,  Underwater Inspection Date: Febuary 2021,  Bridge Improvement Cost: $690,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,036,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S240390N2MUNNBI,  Location: .3 MI SW OF CENTRAL ST (Lat: 42.094214,  Lng: -72.567817),  Route carried "on" structure: City street ,  Year Built: 1957,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 9,698 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,581 (year 2032),  Design Load: H 20,  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY HANCOCK ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $896,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $1,345,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S240400N9MUNNBI,  Location: AT JCT OF CENTRAL ST (Lat: 42.097103,  Lng: -72.563672),  Route carried "on" structure: City street ,  Year Built: 1875,  Year Reconstructed: 1927,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 7,878 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 25,269 (year 2032),  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY ALLEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 20 degrees,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $972,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,459,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: S240400NCMUNNBI,  Location: INT RIFLE ST (Lat: 42.097100,  Lng: -72.563678),  Route carried "on" structure: City street ,  Year Built: 1875,  Year Reconstructed: 1927,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 20,100 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 44,220 (year 2032),  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY ALLEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 20 degrees,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Underwater Inspection Date: May 2019,  Bridge Improvement Cost: $348,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $523,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: S240410N4MUNNBI,  Location: AT JCT OF MILL ST (Lat: 42.090394,  Lng: -72.576897),  Route carried "on" structure: City street ,  Year Built: 1884,  Year Reconstructed: 1946,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 28,060 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 22,110 (year 2032),  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY BELMONT AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 35.4m (116.1ft),  Skew: 29 degrees,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 44.4m (145.7ft),  Out-to-Out Width: 65.6m (215.2ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 86.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,804,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $2,707,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: S240420WEDOTNBI,  Location: JCT I-91 (Lat: 42.082622,  Lng: -72.579144),  Route carried "on" structure: US 5,  Year Built: 1954,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 14,000 (year 2000),  Truck Traffic: 10%,  Average Future Daily Traffic: 22,110 (year 2031),  Design Load: H 20,  Features Intersected: I 91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.759,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.0m (55.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,641,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $2,462,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S240430WDDOTNBI,  Location: JCT I-91 (Lat: 42.081858,  Lng: -72.578939),  Route carried "on" structure: US 5,  Year Built: 1954,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 16,477 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 24,795 (year 2031),  Design Load: H 20,  Features Intersected: I 91 & RMP A TO US 5 NB,  Facility Carried by Structure: I 91 RAMP C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.598,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.4m (63.6ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 43.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,723,000,  Roadway Improvement Cost: $273,000,  Total Project Cost: $4,085,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S240480N3MUNNBI,  Location: AT NBR MILL RIVER (Lat: 42.129603,  Lng: -72.513842),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,715 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,224 (year 2032),  Design Load: H 15,  Features Intersected: WATER N BR MILL RIVER,  Facility Carried by Structure: HWY FOX RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.6m (21.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 78.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 51.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $415,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $623,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S24049121DOTNBI,  Location: AT JCT I-91 (Lat: 42.077667,  Lng: -72.580056),  Route carried "on" structure: State highway 21,  Year Built: 1958,  Status: Open,  Structure Length: 6.90m (22.64ft),  Average Daily Traffic: 7,320 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,560 (year 2032),  Design Load: H 20,  Features Intersected: I 91,  Facility Carried by Structure: ST 83 SB RAMP Y
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 6.276,  Lanes on structure: 1,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.8m (74.8ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.00m (22.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,530,000,  Roadway Improvement Cost: $254,000,  Total Project Cost: $3,796,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S24050120DOTNBI,  Location: AT JCT I-91 (Lat: 42.077806,  Lng: -72.580000),  Route carried "on" structure: State highway 21,  Year Built: 1958,  Status: Open,  Structure Length: 12.62m (41.40ft),  Average Daily Traffic: 5,100 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,633 (year 2032),  Design Load: HS 20,  Features Intersected: I 91 & ST83 SB,  Facility Carried by Structure: ST 83 NB RAMP Z
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.276,  Lanes on structure: 1,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.70m (41.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,590,000,  Roadway Improvement Cost: $460,000,  Total Project Cost: $6,886,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S240510WCDOTNBI,  Location: JCT I-91 (Lat: 42.074908,  Lng: -72.583214),  Route carried "on" structure: US 5,  Year Built: 1958,  Status: Open,  Structure Length: 8.17m (26.80ft),  Average Daily Traffic: 14,588 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 23,532 (year 2031),  Design Load: H 20,  Features Intersected: I 91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.649,  Lanes on structure: 1,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.20m (26.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,784,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $4,177,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S2405410FDOTNBI,  Location: MM 4.5 ON I-91 (Lat: 42.087578,  Lng: -72.580828),  Route carried "on" structure: Interstate 91,  Year Built: 1963,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 91,200 (year 1999),  Truck Traffic: 6%,  Average Future Daily Traffic: 144,032 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HWY MAIN ST (S END)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.274,  Lanes on structure: 7,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.2m (66.3ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 34.2m (112.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $7,120,000,  Roadway Improvement Cost: $713,000,  Total Project Cost: $10,681,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S2405510UDOTNBI,  Location: .1 M N JCT MAIN ST. (Lat: 42.088642,  Lng: -72.581219),  Route carried "on" structure: Interstate 91,  Year Built: 1961,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 107,542 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 169,143 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: WATER MILL RIVER CONDUIT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.403,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: S2405610GDOTNBI,  Location: MM 4.9 ON I-91 (Lat: 42.092289,  Lng: -72.582631),  Route carried "on" structure: Interstate 91,  Year Built: 1962,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 89,309 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 141,046 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY BROAD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.886,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.7m (110.6ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 33.7m (110.6ft),  Out-to-Out Width: 36.0m (118.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $5,374,000,  Roadway Improvement Cost: $538,000,  Total Project Cost: $8,062,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: S2405710HDOTNBI,  Location: JCT UNION ST. (Lat: 42.096808,  Lng: -72.587081),  Route carried "on" structure: Interstate 91,  Year Built: 1962,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 4.81m (15.78ft),  Average Daily Traffic: 114,200 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 180,356 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: HWY UNION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.401,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 32.5m (106.6ft),  Out-to-Out Width: 37.2m (122.0ft)

Condition: Deck: Excellent,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S240605QLMUNNBI,  Location: 665 FT W OF BRADLEY RD (Lat: 42.103681,  Lng: -72.521606),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 16,422 (year 2016),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: WATER S BR MILL RIVER,  Facility Carried by Structure: HWY PLUMTREE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.2m (36.7ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 42.4m (139.1ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $146,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $220,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: S2406110JDOTNBI,  Location: JCT VARIOUS CITY STREETS (Lat: 42.102517,  Lng: -72.594669),  Route carried "on" structure: Interstate 91,  Year Built: 1971,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 59.88m (196.46ft),  Average Daily Traffic: 125,740 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 165,195 (year 2032),  Design Load: HL 93,  Features Intersected: HWY CITY STS&GARAGE
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 8.529,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.4m (99.7ft),  Skew: 39 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 22,  Number Of Approach Spans: 6,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 30.5m (100.1ft),  Out-to-Out Width: 37.0m (121.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S2406110KDOTNBI,  Location: JCT CITY GARAGE & BMRR (Lat: 42.103497,  Lng: -72.597022),  Route carried "on" structure: Interstate 91,  Year Built: 1971,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 46.09m (151.21ft),  Average Daily Traffic: 125,740 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 169,143 (year 2032),  Design Load: HL 93,  Features Intersected: COMB STS & BMRR & GARGE
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 9.173,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.4m (96.5ft),  Skew: 39 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 14,  Number Of Approach Spans: 7,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 29.4m (96.5ft),  Out-to-Out Width: 46.2m (151.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S2406110LDOTNBI,  Location: JCT I-291 & CITY STREETS (Lat: 42.105161,  Lng: -72.599872),  Route carried "on" structure: Interstate 91,  Year Built: 1971,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 97.44m (319.69ft),  Average Daily Traffic: 105,002 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 169,143 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I 291 & CITY STS
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 9.656,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 29 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Number Of Approach Spans: 19,  Length of Maximum Span: 35.1m (115.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 46.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S24062118DOTNBI,  Location: .1 M E JCT MAIN ST. (Lat: 42.109556,  Lng: -72.596475),  Route carried "on" structure: Ramp Interstate 291,  Year Built: 1967,  Status: Open,  Structure Length: 3.15m (10.33ft),  Average Daily Traffic: 11,800 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,846 (year 2032),  Design Load: H 20,  Features Intersected: HWY DWIGHT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.1m (98.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $511,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S24063117DOTNBI,  Location: .1 M E JCT MAIN ST. (Lat: 42.109706,  Lng: -72.596664),  Route carried "on" structure: Ramp Interstate 291,  Year Built: 1967,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 5,100 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 55,276 (year 2032),  Design Load: H 20,  Features Intersected: HWY DWIGHT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,107,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,661,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S24063119DOTNBI,  Location: .1 M E JCT MAIN ST. (Lat: 42.109883,  Lng: -72.596858),  Route carried "on" structure: Ramp Interstate 291,  Year Built: 1967,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 78,178 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 138,584 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HWY DWIGHT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.647,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.6m (77.4ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 23.6m (77.4ft),  Out-to-Out Width: 27.5m (90.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $3,457,000,  Roadway Improvement Cost: $346,000,  Total Project Cost: $5,186,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S2406411ADOTNBI,  Location: .1 M E JCT MAIN ST (Lat: 42.110264,  Lng: -72.597289),  Route carried "on" structure: Ramp Interstate 291,  Year Built: 1967,  Status: Open,  Structure Length: 3.15m (10.33ft),  Average Daily Traffic: 19,310 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 38,535 (year 2033),  Design Load: H 20,  Features Intersected: HWY DWIGHT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 29 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.1m (98.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 52.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,816,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $4,225,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: S2406511BDOTNBI,  Location: .15 M E JCT MAIN ST. (Lat: 42.110517,  Lng: -72.595136),  Route carried "on" structure: Interstate 291,  Year Built: 1967,  Status: Open,  Structure Length: 2.51m (8.23ft),  Average Daily Traffic: 4,711 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 118,448 (year 2031),  Design Load: H 20,  Features Intersected: I 291 CONN A & RMP G
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.6m (77.4ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $879,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,319,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S2406613HDOTNBI,  Location: MM 0.7 ON I-291 (Lat: 42.111078,  Lng: -72.595047),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Posted for load,  Structure Length: 9.97m (32.71ft),  Average Daily Traffic: 16,277 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 35,376 (year 2031),  Design Load: H 20,  Features Intersected: I 291 CONN A/B/C/D&RMP F,  Facility Carried by Structure: HWY CHESTNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 11,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 28.3m (92.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 33.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $11,117,000,  Roadway Improvement Cost: $1,112,000,  Total Project Cost: $16,676,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Discuss Springfield, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.