Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Gallup, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 106Number of bridges
  • 1,181ft / 360mTotal length
  • $8,333,000Total costs
  • 1,005,826Total average daily traffic
  • 348,507Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Gallup
  • No street view available for this location

New bridges in Gallup, NM - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 21930-1939
  • 71940-1949
  • 41950-1959
  • 91960-1969
  • 261970-1979
  • 181980-1989
  • 121990-1999
  • 162000-2009
  • 102010-2019
Reconstructed bridges in Gallup, NM - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31950-1959
  • 51960-1969
  • 01970-1979
  • 31980-1989
  • 31990-1999
  • 82000-2009
Average Bridge Daily Traffic in Gallup, NM
Average Bridge Truck Traffic in Gallup, NM
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.8%Very good
  • 60.4%Good
  • 26.4%Satisfactory
  • 7.5%Fair
  • 1.9%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.7%Very good
  • 54.7%Good
  • 26.4%Satisfactory
  • 9.4%Fair
  • 3.8%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.8%Very good
  • 50.9%Good
  • 28.3%Satisfactory
  • 15.1%Fair
  • 1.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 19.7%Very good
  • 60.6%Good
  • 9.1%Satisfactory
  • 9.1%Fair
  • 1.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 8.8%Very good
  • 38.2%Good
  • 50.0%Satisfactory
  • 2.9%Fair
Find on map >>   Show street view

Structure Number: 81,  Location: 41.3 MI N JCT I-40/US-491 (Lat: 36.063217,  Lng: -108.681997),  Route carried "on" structure: City street 6664,  Year Built: 1928,  Year Reconstructed: 1969,  Status: Posted for load,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 544 (year 2020),  Average Future Daily Traffic: 913 (year 2040),  Design Load: H 15,  Features Intersected: NASCHITTI WASH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 8.0m (26.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 13.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 4.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.90m (19.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $425,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 701,  Location: JCT GRANT/ROSARIO (Lat: 35.692836,  Lng: -105.939439),  Route carried "on" structure: City street 5788,  Year Built: 1920,  Status: Posted for load,  Structure Length: 1.70m (5.58ft),  Average Daily Traffic: 3,112 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,071 (year 2040),  Design Load: H 15,  Features Intersected: ARROYO DE LAS MASCARAS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $147,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3079,  Location: 0.15 MI W FORD DR/GALLUP (Lat: 35.530128,  Lng: -108.729706),  Route carried "on" structure: State highway 118,  Year Built: 1931,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 11,456 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 13,122 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.387,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: 3081,  Location: .1 M W BOARDMAN RD/GALLUP (Lat: 35.529400,  Lng: -108.711900),  Route carried "on" structure: State highway 118,  Year Built: 1931,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 18,243 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 15,807 (year 2040),  Design Load: HS 20,  Features Intersected: Caltalpa Canyon
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.055,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 5385,  Location: 13.15 MI E OF ARIZ LINE (Lat: 35.493686,  Lng: -108.890353),  Route carried "on" structure: State highway 118,  Year Built: 1948,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,982 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,704 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.199,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 5386,  Location: 1.2 MI W OF I-40 EXIT-16 (Lat: 35.502064,  Lng: -108.851192),  Route carried "on" structure: State highway 118,  Year Built: 1948,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,982 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,704 (year 2040),  Design Load: HS 20,  Features Intersected: Twin Buttes Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.900,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019
Find on map >>   Show street view

Structure Number: 5387,  Location: .1 mi. E., I-40 Exit 16 (Lat: 35.506078,  Lng: -108.828119),  Route carried "on" structure: State highway 118,  Year Built: 1948,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 8,760 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,227 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.003,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.4m (86.6ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2019
Find on map >>   Show street view

Structure Number: 5388,  Location: .4 mi, E. of I-40 exit 16 (Lat: 35.506872,  Lng: -108.823575),  Route carried "on" structure: State highway 118,  Year Built: 1948,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 8,760 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,227 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.547,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 5389,  Location: 1.4 MI E OF I-40/GALLUP (Lat: 35.509817,  Lng: -108.806850),  Route carried "on" structure: State highway 118,  Year Built: 1948,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 8,760 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,227 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.869,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $189,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $284,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 5391,  Location: 3.3 MI E OF JCT US-491 (Lat: 35.529242,  Lng: -108.699253),  Route carried "on" structure: State highway 118,  Year Built: 1951,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 8,775 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,796 (year 2040),  Design Load: HS 20,  Features Intersected: PARRITTI WASH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.220,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.9m (78.4ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $750,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 5392,  Location: 1.9 MI E OF I-40 EXIT-26 (Lat: 35.532178,  Lng: -108.638189),  Route carried "on" structure: State highway 118,  Year Built: 1946,  Status: Open,  Structure Length: 1.39m (4.56ft),  Average Daily Traffic: 8,364 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,771 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.756,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $171,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 6553,  Location: 0.2 Mi E Jct I-40/NM-118 (Lat: 35.508853,  Lng: -108.827639),  Route carried "on" structure: Interstate 40,  Year Built: 1966,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 19,032 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 32,581 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF Railroad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.825,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6554,  Location: 0.2 Mi E Jct I-40/NM-118 (Lat: 35.508861,  Lng: -108.827928),  Route carried "on" structure: Interstate 40,  Year Built: 1966,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 22,077 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 27,743 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF Railroad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.808,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.0m (52.5ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6706,  Location: 1.0 Mi. E. of I-40/NM118 (Lat: 35.531653,  Lng: -108.655047),  Route carried "on" structure: Interstate 40,  Year Built: 1965,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 20,921 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 35,816 (year 2040),  Design Load: HS 20,  Features Intersected: LOCAL RD TO REHOBETH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.385,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.7m (25.3ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft)

Condition: Culverts: Satisfactory,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $253,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 6708,  Location: 2.0 MI E NM-118/EXIT-26 (Lat: 35.531678,  Lng: -108.638686),  Route carried "on" structure: Interstate 40,  Year Built: 1965,  Status: Open,  Structure Length: 1.44m (4.72ft),  Average Daily Traffic: 20,921 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 35,816 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.836,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 6729,  Location: 1.35 MI W OF US-491 (Lat: 35.521700,  Lng: -108.782931),  Route carried "on" structure: Interstate 40,  Year Built: 1966,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 19,032 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 32,581 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.255,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $750,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 701,  Location: 1.1 MI E OF I-40/EXIT-16 (Lat: 35.508850,  Lng: -108.812353),  Route carried "on" structure: State highway 118,  Year Built: 1948,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 8,760 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,227 (year 2040),  Design Load: HS 20,  Features Intersected: WEST YARD DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.484,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.9m (52.2ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7092,  Location: 0.1 MI W OF BOARDMAN DR (Lat: 35.528019,  Lng: -108.710619),  Route carried "on" structure: City street 4430,  Year Built: 1966,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,623 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,099 (year 2040),  Design Load: HS 20,  Features Intersected: CATALPA CANYON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.394,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2019
Find on map >>   Show street view

Structure Number: 7158,  Location: 6.5 MI N OF NM-118 (Lat: 35.611617,  Lng: -108.560356),  Route carried "on" structure: State highway 566,  Year Built: 1970,  Status: Open,  Structure Length: 5.76m (18.90ft),  Average Daily Traffic: 5,001 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 7,258 (year 2040),  Design Load: HS 20,  Features Intersected: RIO PUERCO (NORTH FORK)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.396,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7221,  Location: 4.68 MI N OF NM-118 (Lat: 35.589608,  Lng: -108.577350),  Route carried "on" structure: State highway 566,  Year Built: 1970,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 5,001 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 7,258 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.725,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.3m (40.4ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2018
Find on map >>   Show street view

Structure Number: 7384,  Location: JCT US-602/NM-118/GALLUP (Lat: 35.524072,  Lng: -108.758422),  Route carried "on" structure: US 491,  Year Built: 1974,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 29.11m (95.51ft),  Average Daily Traffic: 16,408 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 12,664 (year 2040),  Design Load: HS 20,  Features Intersected: NM118/BNSF RR/RIO PUERCO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.0m (65.6ft),  Skew: 22 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 48.5m (159.1ft),  Curb-To-Curb Width: 22.2m (72.8ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 29.11m (95.51ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 60 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: October 2016,  Bridge Improvement Cost: $2,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $2,720,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7447,  Location: 0.2 MI E OF JCT US-491 (Lat: 35.528492,  Lng: -108.756958),  Route carried "on" structure: Interstate 40,  Year Built: 1975,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 20,514 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 29,149 (year 2040),  Design Load: HS 20,  Features Intersected: GAMERCO WASH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.740,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 75,  Location: 0.1 MI N OF NM 118/GALLUP (Lat: 35.510419,  Lng: -108.814175),  Route carried "on" structure: City street 31001,  Year Built: 1976,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 1,198 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,342 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF RAILROAD,  Facility Carried by Structure: 31-Z001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7542,  Location: 0.1 MI N OF NM-118/GALLUP (Lat: 35.530128,  Lng: -108.743725),  Route carried "on" structure: State highway 4425,  Year Built: 1977,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 4,215 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,931 (year 2040),  Design Load: HS 20,  Features Intersected: RIO PUERCO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 95.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7543,  Location: 0.1 MI N OF NM-118/GALLUP (Lat: 35.529639,  Lng: -108.745289),  Route carried "on" structure: City street 4424,  Year Built: 1977,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 243 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 341 (year 2040),  Design Load: HS 20,  Features Intersected: RIO PUERCO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 95.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7611,  Location: 0.5 MI E OF US-491/GALLUP (Lat: 35.528722,  Lng: -108.751694),  Route carried "on" structure: Interstate 40,  Year Built: 1980,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 26,903 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 38,547 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF R/R SPUR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.261,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7612,  Location: 0.5 MI E OF US-491/GALLUP (Lat: 35.528517,  Lng: -108.751569),  Route carried "on" structure: Interstate 40,  Year Built: 1980,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 26,903 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 38,547 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF R/R SPUR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.244,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.0m (42.7ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7613,  Location: 0.8 MI E OF US-491/GALLUP (Lat: 35.530100,  Lng: -108.745500),  Route carried "on" structure: Interstate 40,  Year Built: 1980,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 26,903 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 38,547 (year 2040),  Design Load: HS 20,  Features Intersected: THIRD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.842,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.0m (42.7ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7614,  Location: 0.8 MI E OF US-491/GALLUP (Lat: 35.530292,  Lng: -108.745578),  Route carried "on" structure: Interstate 40,  Year Built: 1980,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 26,903 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 38,547 (year 2040),  Design Load: HS 20,  Features Intersected: THIRD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.829,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7615,  Location: 0.9 MI E OF US-491/GALLUP (Lat: 35.530747,  Lng: -108.744003),  Route carried "on" structure: Interstate 40,  Year Built: 1980,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 26,903 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 38,547 (year 2040),  Design Load: HS 20,  Features Intersected: SECOND STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.986,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7616,  Location: 0.9 MI E OF US-491/GALLUP (Lat: 35.530503,  Lng: -108.743900),  Route carried "on" structure: Interstate 40,  Year Built: 1980,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 26,903 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 38,547 (year 2040),  Design Load: HS 20,  Features Intersected: SECOND STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.987,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7617,  Location: 0.1 MI N OF NM118/GALLUP (Lat: 35.531675,  Lng: -108.727083),  Route carried "on" structure: State highway 609,  Year Built: 1978,  Status: Open,  Structure Length: 11.70m (38.39ft),  Average Daily Traffic: 11,487 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,165 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF R/R RIO PUERCO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.354,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 23.4m (76.8ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2016,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7618,  Location: GALLUP / EXIT 22 (Lat: 35.533278,  Lng: -108.726917),  Route carried "on" structure: State highway 609,  Year Built: 1978,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 12,200 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,252 (year 2040),  Design Load: HS 20,  Features Intersected: I-40 EBL/WBL mp 22.75
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.269,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7669,  Location: 4.6 MI E OF JCT US-491 (Lat: 35.534372,  Lng: -108.680508),  Route carried "on" structure: Interstate 40,  Year Built: 1978,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 38,115 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 54,612 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.765,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.9m (42.3ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 767,  Location: 4.6 MI E OF JCT US-491 (Lat: 35.534583,  Lng: -108.680297),  Route carried "on" structure: Interstate 40,  Year Built: 1978,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 38,115 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 54,612 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.773,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 787,  Location: 5.0 MI E OF US-491/GALLUP (Lat: 35.531483,  Lng: -108.673017),  Route carried "on" structure: Interstate 40,  Year Built: 1980,  Status: Open,  Structure Length: 25.21m (82.71ft),  Average Daily Traffic: 25,606 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 36,688 (year 2040),  Design Load: HS 20,  Features Intersected: NM118,BNSF RR,Rio Puerco
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.455,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7871,  Location: 5.0 MI E OF US-491 (Lat: 35.531558,  Lng: -108.672758),  Route carried "on" structure: Interstate 40,  Year Built: 1980,  Status: Open,  Structure Length: 25.21m (82.71ft),  Average Daily Traffic: 25,606 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 36,688 (year 2040),  Design Load: HS 20,  Features Intersected: NM118,BNSF RR,Rio Puerco
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.471,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7975,  Location: 3.1 MI E OF US-491/GALLUP (Lat: 35.532306,  Lng: -108.706983),  Route carried "on" structure: Interstate 40,  Year Built: 1978,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 38,115 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 54,612 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.374,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.1m (102.0ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018
Find on map >>   Show street view

Structure Number: 8084,  Location: 0.6 MI W NM-602/RED ROCK (Lat: 35.456019,  Lng: -108.754789),  Route carried "on" structure: County highway 31002,  Year Built: 1976,  Status: Posted for load,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 270 (year 2020),  Average Future Daily Traffic: 445 (year 2040),  Features Intersected: BREAD SPRINGS WASH,  Facility Carried by Structure: 31-Z002
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.0m (16.4ft),  Material/Design: Aluminum, Iron,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 16.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $264,000 ( Estimate for 2020),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 8085,  Location: 0.1 MI N NM-118 /E GALLUP (Lat: 35.530253,  Lng: -108.686325),  Route carried "on" structure: County highway 31002,  Year Built: 1972,  Status: Posted for load,  Structure Length: 3.03m (9.94ft),  Average Daily Traffic: 270 (year 2020),  Average Future Daily Traffic: 445 (year 2040),  Features Intersected: RIO PUERCO,  Facility Carried by Structure: 31-Z043
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.003,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.5m (14.8ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 27.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $252,000 ( Estimate for 2020),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 8098,  Location: 3.1 MI NW ON NM-566 (Lat: 35.596681,  Lng: -108.628167),  Route carried "on" structure: County highway 31043,  Year Built: 1977,  Status: Posted for load,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 270 (year 2020),  Average Future Daily Traffic: 445 (year 2040),  Features Intersected: NOSE ROCK WASH,  Facility Carried by Structure: 31-MC43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Material/Design: Aluminum, Iron,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $178,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $267,000 ( Estimate for 2020),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 8241,  Location: .84 MI N OF JCT NM118 (Lat: 35.515336,  Lng: -108.845842),  Route carried "on" structure: County highway 31001,  Year Built: 1980,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 1,292 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,416 (year 2040),  Design Load: HS 20,  Features Intersected: RIO PUERCO OF THE WEST,  Facility Carried by Structure: 31-Z001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.3m (50.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Discuss Gallup, New Mexico (NM) on our hugely popular New Mexico forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.