  • 71Number of bridges
  • 1,217ft / 371mTotal length
  • $243,771,000Total costs
  • 968,239Total average daily traffic
  • 112,985Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Yakima
  • No street view available for this location

New bridges in Yakima, WA - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 41950-1959
  • 211960-1969
  • 231970-1979
  • 11980-1989
  • 91990-1999
  • 52000-2009
  • 52010-2019
Reconstructed bridges in Yakima, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Yakima, WA
Average Bridge Truck Traffic in Yakima, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.0%Very good
  • 60.0%Good
  • 18.0%Satisfactory
  • 8.0%Fair
  • 4.0%Poor
  • 4.0%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.0%Very good
  • 58.0%Good
  • 18.0%Satisfactory
  • 14.0%Fair
  • 2.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 74.0%Good
  • 14.0%Satisfactory
  • 2.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Very good
  • 12.5%Good
  • 12.5%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: 1583A,  Location: 0.4 E JCT SR 823 (Lat: 46.631056,  Lng: -120.516833),  Route carried "on" structure: Interstate 82,  Year Built: 1932,  Status: Posted for load,  Structure Length: 9.66m (31.69ft),  Average Daily Traffic: 12,774 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 16,759 (year 2039),  Design Load: H 15,  Features Intersected: YAKIMA RIVER
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 49.536,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 68.0m (223.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 9.66m (31.69ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $2,472,000,  Roadway Improvement Cost: $494,000,  Total Project Cost: $4,945,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1583B,  Location: 0.5 E JCT SR 823 (Lat: 46.630228,  Lng: -120.515403),  Route carried "on" structure: Interstate 82,  Year Built: 1932,  Status: Posted for load,  Structure Length: 8.41m (27.59ft),  Average Daily Traffic: 24,222 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 31,779 (year 2039),  Design Load: H 15,  Features Intersected: NACHES RIVER
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 49.729,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 54.9m (180.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 8.41m (27.59ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $2,318,000,  Roadway Improvement Cost: $464,000,  Total Project Cost: $4,637,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 6123B,  Location: 0.4 E JCT SR 823 (Lat: 46.631403,  Lng: -120.518025),  Route carried "on" structure: Interstate 82,  Year Built: 1960,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 12,774 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 16,759 (year 2039),  Design Load: HS 20,  Features Intersected: YAKIMA RIVER
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 49.520,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 85.3m (279.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.66m (28.41ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $2,840,000,  Roadway Improvement Cost: $568,000,  Total Project Cost: $5,680,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6123C,  Location: 0.5 E JCT SR 823 (Lat: 46.630050,  Lng: -120.516033),  Route carried "on" structure: Interstate 82,  Year Built: 1960,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 24,222 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 31,779 (year 2039),  Design Load: HS 20,  Features Intersected: NACHES RIVER
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 49.729,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 85.3m (279.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.66m (28.41ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $3,508,000,  Roadway Improvement Cost: $702,000,  Total Project Cost: $7,015,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 6195A,  Location: 1.0 E JCT SR 823 (Lat: 46.627694,  Lng: -120.511667),  Route carried "on" structure: Interstate 82,  Year Built: 1959,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 13,354 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 17,520 (year 2039),  Design Load: HS 20,  Features Intersected: N FIRST ST / SR 823
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.163,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 31.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.97m (16.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,141,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $2,282,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6195B,  Location: 0.6 E JCT US 12 (Lat: 46.621167,  Lng: -120.497528),  Route carried "on" structure: Interstate 82,  Year Built: 1960,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 26,107 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 34,252 (year 2039),  Design Load: HS 20,  Features Intersected: OVERFLOW CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.483,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,088,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $2,176,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 6195C,  Location: 0.6 E JCT US 12 (Lat: 46.621278,  Lng: -120.497306),  Route carried "on" structure: Interstate 82,  Year Built: 1960,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 26,107 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 34,252 (year 2039),  Design Load: HS 20,  Features Intersected: OVERFLOW CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.483,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,280,000,  Roadway Improvement Cost: $256,000,  Total Project Cost: $2,560,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 6615A,  Location: 1.1 E JCT US 12 (Lat: 46.615389,  Lng: -120.492194),  Route carried "on" structure: Interstate 82,  Year Built: 1961,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 26,107 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 34,252 (year 2039),  Design Load: HS 20,  Features Intersected: NP RY MOXEE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.255,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,278,000,  Roadway Improvement Cost: $256,000,  Total Project Cost: $2,556,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 6615B,  Location: 1.1 E JCT US 12 (Lat: 46.615472,  Lng: -120.491947),  Route carried "on" structure: Interstate 82,  Year Built: 1961,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 26,107 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 34,252 (year 2039),  Design Load: HS 20,  Features Intersected: NP RY MOXEE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.255,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,278,000,  Roadway Improvement Cost: $256,000,  Total Project Cost: $2,556,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 6744A,  Location: 1.9 E JCT US 12 (Lat: 46.605167,  Lng: -120.486389),  Route carried "on" structure: City street 82,  Year Built: 1962,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 23,453 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 32,968 (year 2038),  Design Load: HS 20,  Features Intersected: I-82,  Facility Carried by Structure: TERRACE HTS/YAKIMA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 30.6m (100.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,994,000,  Roadway Improvement Cost: $799,000,  Total Project Cost: $7,987,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6967A,  Location: 2.0 E JCT US 12 (Lat: 46.605944,  Lng: -120.485917),  Route carried "on" structure: Ramp Interstate 82,  Year Built: 1962,  Status: Open,  Structure Length: 11.16m (36.61ft),  Average Daily Traffic: 4,724 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,197 (year 2039),  Design Load: HS 20,  Features Intersected: I-82,  Facility Carried by Structure: N-W RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 1,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.16m (36.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,684,000,  Roadway Improvement Cost: $337,000,  Total Project Cost: $3,367,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6967B,  Location: 2.0 E JCT US 12 (Lat: 46.604861,  Lng: -120.484778),  Route carried "on" structure: Ramp Interstate 82,  Year Built: 1962,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 4,724 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,197 (year 2039),  Design Load: HS 20,  Features Intersected: TERRACE HTS WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 1,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.33m (17.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $980,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $1,960,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6967C,  Location: 2.5 E JCT US 12 (Lat: 46.597611,  Lng: -120.479472),  Route carried "on" structure: Interstate 82,  Year Built: 1962,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 26,232 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 34,416 (year 2039),  Design Load: HS 20,  Features Intersected: BEECH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.444,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $376,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $752,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 6967D,  Location: 2.5 E JCT US 12 (Lat: 46.597722,  Lng: -120.479528),  Route carried "on" structure: Interstate 82,  Year Built: 1962,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 26,232 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 34,416 (year 2039),  Design Load: HS 20,  Features Intersected: BEECH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.444,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $376,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $752,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8616A,  Location: 16.9 E JCT SR 410 (Lat: 46.626028,  Lng: -120.512333),  Route carried "on" structure: US 12,  Year Built: 1969,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 14,546 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 19,084 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 823 (N 1ST ST)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 325.892,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 27.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,696,000,  Roadway Improvement Cost: $339,000,  Total Project Cost: $3,392,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8616B,  Location: 16.9 E JCT SR 410 (Lat: 46.626222,  Lng: -120.512333),  Route carried "on" structure: US 12,  Year Built: 1969,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 14,546 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 19,084 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 823 (N 1ST ST)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 325.892,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,696,000,  Roadway Improvement Cost: $339,000,  Total Project Cost: $3,392,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8616C,  Location: 16.7 E JCT SR 410 (Lat: 46.626611,  Lng: -120.507167),  Route carried "on" structure: US 12,  Year Built: 1969,  Status: Open,  Structure Length: 11.73m (38.48ft),  Average Daily Traffic: 9,939 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 13,039 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: I-82
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 326.166,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.73m (38.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,310,000,  Roadway Improvement Cost: $462,000,  Total Project Cost: $4,620,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8709A,  Location: 14.4 E JCT SR 410 (Lat: 46.622389,  Lng: -120.565083),  Route carried "on" structure: US 12,  Year Built: 1970,  Status: Open,  Structure Length: 13.59m (44.59ft),  Average Daily Traffic: 6,680 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,764 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: W-W RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 321.740,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.59m (44.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,746,000,  Roadway Improvement Cost: $749,000,  Total Project Cost: $7,493,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8709B,  Location: 14.4 E JCT SR 410 (Lat: 46.622222,  Lng: -120.564167),  Route carried "on" structure: US 12,  Year Built: 1970,  Status: Open,  Structure Length: 12.10m (39.70ft),  Average Daily Traffic: 6,680 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,764 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: RAMP & BNRR (ABANDONED)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 321.788,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.10m (39.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,335,000,  Roadway Improvement Cost: $667,000,  Total Project Cost: $6,670,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8709D,  Location: 14.4 E JCT SR 410 (Lat: 46.622583,  Lng: -120.564694),  Route carried "on" structure: Ramp State highway 12,  Year Built: 1959,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 3,785 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,965 (year 2039),  Design Load: HS 20,  Features Intersected: PP&L CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $420,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 8846A,  Location: 14.6 E JCT SR 410 (Lat: 46.622944,  Lng: -120.560861),  Route carried "on" structure: US 12,  Year Built: 1970,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 6,680 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,764 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: W-E RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 322.078,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,268,000,  Roadway Improvement Cost: $254,000,  Total Project Cost: $2,537,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8846B,  Location: 14.6 E JCT SR 410 (Lat: 46.623194,  Lng: -120.560889),  Route carried "on" structure: US 12,  Year Built: 1970,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 6,680 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,764 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: W-E RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 322.078,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,411,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $2,822,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8846C,  Location: 16.0 E JCT SR 410 (Lat: 46.623694,  Lng: -120.531306),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 8,210 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,540 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: US 12,  Facility Carried by Structure: N 16TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.64m (21.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,918,000,  Roadway Improvement Cost: $384,000,  Total Project Cost: $3,837,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8846D,  Location: 16.4 E JCT SR 410 (Lat: 46.626042,  Lng: -120.520281),  Route carried "on" structure: US 12,  Year Built: 1971,  Status: Open,  Structure Length: 12.50m (41.01ft),  Average Daily Traffic: 19,476 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 25,552 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: RR & N GORDON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 325.281,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Serious,  Superstructure: Good,  Substructure: Good,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.50m (41.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,280,000,  Roadway Improvement Cost: $656,000,  Total Project Cost: $6,560,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8846E,  Location: 16.4 E JCT SR 410 (Lat: 46.626239,  Lng: -120.520286),  Route carried "on" structure: US 12,  Year Built: 1971,  Status: Open,  Structure Length: 11.95m (39.21ft),  Average Daily Traffic: 19,476 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 25,552 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: RR & N GORDON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 325.281,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 21.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.95m (39.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,136,000,  Roadway Improvement Cost: $627,000,  Total Project Cost: $6,272,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8846F,  Location: 9.4 S KITTITAS CO (Lat: 46.626389,  Lng: -120.506694),  Route carried "on" structure: Ramp Interstate 82,  Year Built: 1970,  Status: Open,  Structure Length: 22.59m (74.11ft),  Average Daily Traffic: 1,532 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,009 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: I-82,  Facility Carried by Structure: W-S RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 1,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 39.9m (130.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Serious,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 22.59m (74.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $4,446,000,  Roadway Improvement Cost: $889,000,  Total Project Cost: $8,892,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 14584A,  Location: 2.0 E JCT US 12 (Lat: 46.606000,  Lng: -120.487417),  Route carried "on" structure: Interstate 82,  Year Built: 1996,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 4,724 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,197 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: FAIR AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.612,  Lanes on structure: 1,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $666,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,331,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14584B,  Location: 2.0 E JCT US 12 (Lat: 46.605167,  Lng: -120.487889),  Route carried "on" structure: City street 82,  Year Built: 1996,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 23,453 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 32,968 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: FAIR AVE,  Facility Carried by Structure: E YAKIMA AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 5,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.3m (10.8ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 32.5m (106.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,890,000,  Roadway Improvement Cost: $378,000,  Total Project Cost: $3,780,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15137C,  Location: 0.4 N JCT US 12 (Lat: 46.631183,  Lng: -120.517250),  Route carried "on" structure: State highway 823,  Year Built: 1999,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 6,998 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,181 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: YAKIMA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 67.4m (221.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.97m (35.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,880,000,  Roadway Improvement Cost: $576,000,  Total Project Cost: $5,760,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15137D,  Location: 0.3 N JCT US 12 (Lat: 46.629950,  Lng: -120.515083),  Route carried "on" structure: State highway 823,  Year Built: 1999,  Status: Open,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 6,998 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,181 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: NACHES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 53.6m (175.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.87m (29.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,328,000,  Roadway Improvement Cost: $466,000,  Total Project Cost: $4,656,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15137E,  Location: 1.0 E JCT SR 823 (Lat: 46.627981,  Lng: -120.512583),  Route carried "on" structure: Interstate 82,  Year Built: 1999,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 13,354 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 17,520 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: SR 823/N FIRST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.099,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.4m (116.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.77m (22.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,510,000,  Roadway Improvement Cost: $302,000,  Total Project Cost: $3,019,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15137J,  Location: 1.0 E JCT SR 823 (Lat: 46.624897,  Lng: -120.511367),  Route carried "on" structure: Ramp Interstate 82,  Year Built: 1999,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 1,532 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,009 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: N FIRST STREET,  Facility Carried by Structure: W-S RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 1,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.3m (119.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.69m (28.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,098,000,  Roadway Improvement Cost: $420,000,  Total Project Cost: $4,197,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16933A,  Location: 0.5 E JCT I-82 (Lat: 46.582583,  Lng: -120.463472),  Route carried "on" structure: State highway 24,  Year Built: 2006,  Status: Open,  Structure Length: 47.70m (156.50ft),  Average Daily Traffic: 21,075 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 27,650 (year 2039),  Design Load: HL 93,  Features Intersected: YAKIMA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 55.2m (181.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m,  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 27.2m (89.2ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 47.70m (156.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $26,918,000,  Roadway Improvement Cost: $5,384,000,  Total Project Cost: $53,836,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16933B,  Location: JCT I-82 (Lat: 46.584972,  Lng: -120.473389),  Route carried "on" structure: State highway 24,  Year Built: 2006,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 22,827 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 29,949 (year 2039),  Design Load: HL 93,  Features Intersected: I-82 E NOB HILL BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 7,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m,  Curb-To-Curb Width: 30.5m (100.1ft),  Out-to-Out Width: 34.5m (113.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.82m (15.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,223,000,  Roadway Improvement Cost: $645,000,  Total Project Cost: $6,446,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 80981,  Location: 00.09 S NACHES HGTS (Lat: 46.627125,  Lng: -120.580967),  Route carried "on" structure: County highway 10020,  Year Built: 1930,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 7,000 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,000 (year 2039),  Features Intersected: COWICHE CREEK,  Facility Carried by Structure: POWERHOUSE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $821,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,642,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 81964,  Location: 00.03 N COWICHE CAN (Lat: 46.618908,  Lng: -120.593797),  Route carried "on" structure: County highway 23990,  Year Built: 1977,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 75 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 125 (year 2039),  Design Load: HS 20,  Features Intersected: COWICHE CREEK,  Facility Carried by Structure: COWICHE CANYON LN.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 23.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $882,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $1,763,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Yakima, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.