Welcome to City-Data.com Forum!
U.S. CitiesCity-Data Forum Index
Go Back   City-Data Forum > U.S. Forums > South Carolina > Columbia area
 [Register]
Columbia area Columbia - Lexington - Irmo
Please register to participate in our discussions with 2 million other members - it's free and quick! Some forums can only be seen by registered members. After you create your account, you'll be able to customize options and access all our 15,000 new posts/day with fewer ads.
View detailed profile (Advanced) or search
site with Google Custom Search

Search Forums  (Advanced)
 
Old 11-14-2021, 09:53 AM
 
403 posts, read 234,118 times
Reputation: 89

Advertisements

The last P&C article is what I was referring to and still includes plans for a riverfront park. See below.

Cleaning up 100 year old toxic goo in SC’s Congaree will require partial damming of river

COLUMBIA — Toxic tar was discovered by a kayaker on the bottom of the Congaree River in 2010. Nearly a decade later, work could finally begin to remove it.

The saga surrounding what to do about the remnant from a former coal plant that produced gas to fuel street lights more than 100 years ago has concerned environmentalists and held up plans for riverfront development in Columbia.

Virginia-based Dominion Energy, which inherited the coal tar after completing its purchase of SCANA this year, anticipates filing in the spring for what Congaree Riverkeeper Bill Stangler calls the hardest of the necessary permits for cleanup — one that would allow partial damming of the river.

“Whenever you talk about building a dam in a river, that water has to go somewhere,” said Brice McKoy, Columbia branch chief for the Army Corps of Engineers Regulatory Division.

The latest plan calls for installing temporary barriers, called cofferdams, around the 3-acre work sites, pushing the water away while excavation occurs. The work could start May 2021 and last until 2024. Previous cost estimates for cleanup have ranged from $9 million to $18 million, though those numbers could change.

The plan won’t remove all the tar, which can contain cancer-causing chemicals and can irritate skin, but it could eliminate 70 to 75 percent from the areas of the river between the Gervais and Blossom street bridges, where most recreation and public access happens, Stangler said. The coal tar would be loaded onto dump trucks and hauled to a landfill. Most of the coal tar is on the Columbia side of the river.

In order to win the Corps’ permission, Dominion must show the temporary dam won’t cause major flooding on the West Columbia and Cayce side of the Congaree while work is occurring.

The dam is going through a series of studies.

Dominion is awaiting comments from the Corps on an analysis of how the dam could affect flooding during heavy downpours, according to its latest filing with the S.C. Department of Health and Environmental Control. Still on the list are engineering studies determining stability, height and width of the dam as well as dam leakage estimates.

Dominion is also considering a different type of cofferdam that could reduce the size of the work area and eliminate adverse effects on the river’s western shoreline. Dominion anticipates winning approval for the dam in about a year. Floodplain approvals also are needed from the Federal Emergency Management Agency.

“It gets very, very technical,” McKoy said.

Dominion also plans to begin work early next year on determining how large a work site is needed on the riverbank, according to the DHEC filing.

Not knowing how much land will be needed for these operations has held up further development of Columbia’s riverfront, said Charlie Thompson, who manages a roughly 60-acre swath of land owned by the Guignard family between Huger Street and the Congaree.

The Guignards and the city of Columbia have long-laid plans for a riverfront park edged by shops and restaurants, Thompson said, similar to the type of development seen across the river in West Columbia.

Thompson is worried that delays in getting tar removal allow time for the economy to dip or for momentum around the public portion of the project to falter. Richland County is already discussing cuts to its penny tax project list, a program slated to pay for some of the infrastructure in the riverfront area.

Stangler had expected the permit filing to take place this fall.

“This is a complex project with several moving parts, and we will keep working to make sure this effort continues to move forward,” Stangler said.

Dominion stated it is committed to completing the cleanup project.

These projects are not rare in the Carolinas.

“Over the last 28 years, SCANA subsidiaries, which are now part of Dominion Energy, have worked diligently to clean up manufactured gas plant sites in Charleston, Columbia, Florence and Sumter, S.C., and Concord, Gastonia, Statesville, Durham and Raleigh, N.C.,” company spokeswoman Aimée Murray said in an email.

Utilities have been cleaning up some coal tar sites for a quarter-century. Duke Energy, South Carolina’s other large investor-owned utility, has conducted cleanup at locations in Greenville, Spartanburg and Anderson.

McKoy said there have been other water-based removal efforts in the state but “not in a very dynamic river system like this” where there can be a lot of changes in water velocity and flow.

In Charleston, SCANA dug up soil along the Cooper River contaminated with coal tar on the site that now houses the S.C. Aquarium. In the river itself, the company installed a stone and fabric cap. A similar solution was proposed by SCANA for the Congaree in 2017 until Congaree Riverkeeper sued to force a return to removal efforts.

The coal tar came from an old SCE&G coal gasification plant, leaking into the river in the early to mid-20th century.

Coal tar can contain benzene, a cancer-causing material, and while there has been no evidence at the Congaree site, in other parts of the country, tumors have been found on fish exposed to coal-tar polluted water.
Reply With Quote Quick reply to this message

 
Old 11-14-2021, 02:07 PM
 
757 posts, read 567,653 times
Reputation: 162
Quote:
Originally Posted by forestcracker View Post
The last P&C article is what I was referring to and still includes plans for a riverfront park. See below.

Cleaning up 100 year old toxic goo in SC’s Congaree will require partial damming of river

COLUMBIA — Toxic tar was discovered by a kayaker on the bottom of the Congaree River in 2010. Nearly a decade later, work could finally begin to remove it.

The saga surrounding what to do about the remnant from a former coal plant that produced gas to fuel street lights more than 100 years ago has concerned environmentalists and held up plans for riverfront development in Columbia.

Virginia-based Dominion Energy, which inherited the coal tar after completing its purchase of SCANA this year, anticipates filing in the spring for what Congaree Riverkeeper Bill Stangler calls the hardest of the necessary permits for cleanup — one that would allow partial damming of the river.

“Whenever you talk about building a dam in a river, that water has to go somewhere,” said Brice McKoy, Columbia branch chief for the Army Corps of Engineers Regulatory Division.

The latest plan calls for installing temporary barriers, called cofferdams, around the 3-acre work sites, pushing the water away while excavation occurs. The work could start May 2021 and last until 2024. Previous cost estimates for cleanup have ranged from $9 million to $18 million, though those numbers could change.

The plan won’t remove all the tar, which can contain cancer-causing chemicals and can irritate skin, but it could eliminate 70 to 75 percent from the areas of the river between the Gervais and Blossom street bridges, where most recreation and public access happens, Stangler said. The coal tar would be loaded onto dump trucks and hauled to a landfill. Most of the coal tar is on the Columbia side of the river.

In order to win the Corps’ permission, Dominion must show the temporary dam won’t cause major flooding on the West Columbia and Cayce side of the Congaree while work is occurring.

The dam is going through a series of studies.

Dominion is awaiting comments from the Corps on an analysis of how the dam could affect flooding during heavy downpours, according to its latest filing with the S.C. Department of Health and Environmental Control. Still on the list are engineering studies determining stability, height and width of the dam as well as dam leakage estimates.

Dominion is also considering a different type of cofferdam that could reduce the size of the work area and eliminate adverse effects on the river’s western shoreline. Dominion anticipates winning approval for the dam in about a year. Floodplain approvals also are needed from the Federal Emergency Management Agency.

“It gets very, very technical,” McKoy said.

Dominion also plans to begin work early next year on determining how large a work site is needed on the riverbank, according to the DHEC filing.

Not knowing how much land will be needed for these operations has held up further development of Columbia’s riverfront, said Charlie Thompson, who manages a roughly 60-acre swath of land owned by the Guignard family between Huger Street and the Congaree.

The Guignards and the city of Columbia have long-laid plans for a riverfront park edged by shops and restaurants, Thompson said, similar to the type of development seen across the river in West Columbia.

Thompson is worried that delays in getting tar removal allow time for the economy to dip or for momentum around the public portion of the project to falter. Richland County is already discussing cuts to its penny tax project list, a program slated to pay for some of the infrastructure in the riverfront area.

Stangler had expected the permit filing to take place this fall.

“This is a complex project with several moving parts, and we will keep working to make sure this effort continues to move forward,” Stangler said.

Dominion stated it is committed to completing the cleanup project.

These projects are not rare in the Carolinas.

“Over the last 28 years, SCANA subsidiaries, which are now part of Dominion Energy, have worked diligently to clean up manufactured gas plant sites in Charleston, Columbia, Florence and Sumter, S.C., and Concord, Gastonia, Statesville, Durham and Raleigh, N.C.,” company spokeswoman Aimée Murray said in an email.

Utilities have been cleaning up some coal tar sites for a quarter-century. Duke Energy, South Carolina’s other large investor-owned utility, has conducted cleanup at locations in Greenville, Spartanburg and Anderson.

McKoy said there have been other water-based removal efforts in the state but “not in a very dynamic river system like this” where there can be a lot of changes in water velocity and flow.

In Charleston, SCANA dug up soil along the Cooper River contaminated with coal tar on the site that now houses the S.C. Aquarium. In the river itself, the company installed a stone and fabric cap. A similar solution was proposed by SCANA for the Congaree in 2017 until Congaree Riverkeeper sued to force a return to removal efforts.

The coal tar came from an old SCE&G coal gasification plant, leaking into the river in the early to mid-20th century.

Coal tar can contain benzene, a cancer-causing material, and while there has been no evidence at the Congaree site, in other parts of the country, tumors have been found on fish exposed to coal-tar polluted water.
I stand corrected- thanks for finding this! The bit about the park though feels a bit off as the park was envisioned in the Sasaki plan that is only partially being used and the funding mechanism for the park (penny tax) was removed, leaving it a "nice to have" that competes with all of Cola's other priorities. The game changer here would be private money, similar to the donors who are moving the riverwalk forward.
Reply With Quote Quick reply to this message
 
Old 11-14-2021, 07:42 PM
 
37,882 posts, read 41,956,856 times
Reputation: 27279
Quote:
Originally Posted by kingofCola View Post
Kirkman Finley and one other state politician were dissing Columbia’s convention center expansion ambitions
Oh I knew about that but that doesn't mean an expansion won't happen.
Reply With Quote Quick reply to this message
 
Old 11-16-2021, 07:44 PM
 
403 posts, read 234,118 times
Reputation: 89
Rickenmann is the winner and 37th Mayor of Columbia. Along with Taylor and Bussells winning this is likely going to be the most business friendly council in some time. Will be interesting to see if they can lure more jobs and development to Columbia as they’ve promised.
Reply With Quote Quick reply to this message
 
Old 11-16-2021, 07:54 PM
 
Location: Charleston, South Carolina
12,918 posts, read 18,761,054 times
Reputation: 3141
The results are in keeping with Columbia’s now being about 53% white as reflected in the 2020 census.
Reply With Quote Quick reply to this message
 
Old 11-16-2021, 08:18 PM
 
Location: Columbia, South Carolina
1,802 posts, read 2,032,122 times
Reputation: 405
Quote:
Originally Posted by Charlestondata View Post
The results are in keeping with Columbia’s now being about 53% white as reflected in the 2020 census.
You can’t possibly be serious. You do realize we had a multiple-term African American mayor with the same demographics, right?
Reply With Quote Quick reply to this message
 
Old 11-16-2021, 08:26 PM
 
Location: Charleston, South Carolina
12,918 posts, read 18,761,054 times
Reputation: 3141
Quote:
Originally Posted by SCxpBrussel View Post
You can’t possibly be serious. You do realize we had a multiple-term African American mayor with the same demographics, right?
Not quite the same demographics. They have been shifting. Just because the results are in keeping with an increase in the white majority, that doesn’t mean that the increase is the only reason for the results.
Reply With Quote Quick reply to this message
 
Old 11-17-2021, 08:54 AM
 
757 posts, read 567,653 times
Reputation: 162
Quote:
Originally Posted by Charlestondata View Post
The results are in keeping with Columbia’s now being about 53% white as reflected in the 2020 census.
Is the implication that white voters focus on business-friendly candidates more, white voters vote for white candidates, or both? Worth noting that Dr. Bussells is Indian-American if the second or third.
Reply With Quote Quick reply to this message
 
Old 11-17-2021, 09:36 AM
 
Location: Charleston, South Carolina
12,918 posts, read 18,761,054 times
Reputation: 3141
Quote:
Originally Posted by carolinagarnet View Post
Is the implication that white voters focus on business-friendly candidates more, white voters vote for white candidates, or both? Worth noting that Dr. Bussells is Indian-American if the second or third.
Both tendencies, but of course with exceptions, and the percentages of white and Black residents even since the last election shifted enough to make for a 52-48 margin, especially with the Black percentage falling at twice the rate as the white percentage.

Even Devine last night said, “I think tonight it was confirmed how divided the city is by race and economic class.” Whether she’s right or wrong in her statement, the results most likely would have been different if the shift in Black to white demographics were the other way around.
Reply With Quote Quick reply to this message
 
Old 11-17-2021, 10:40 AM
 
1,101 posts, read 1,337,669 times
Reputation: 184
Default Nah not buying it

Both candidates had been in power for 12 years. One was more like than the other.
Reply With Quote Quick reply to this message
Please register to post and access all features of our very popular forum. It is free and quick. Over $68,000 in prizes has already been given out to active posters on our forum. Additional giveaways are planned.

Detailed information about all U.S. cities, counties, and zip codes on our site: City-data.com.


Reply

Quick Reply
Message:




Over $104,000 in prizes was already given out to active posters on our forum and additional giveaways are planned!

Go Back   City-Data Forum > U.S. Forums > South Carolina > Columbia area

All times are GMT -6. The time now is 11:13 PM.

© 2005-2024, Advameg, Inc. · Please obey Forum Rules · Terms of Use and Privacy Policy · Bug Bounty

City-Data.com - Contact Us - Archive 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37 - Top