Quote:
Originally Posted by fidorelo07
Meeker asked for 2 more feet to be held in the lake. That is a great move in the right direction.
|
I kind of doubt the Corps of Engineers would go for that. Raleigh really needs to accelerate the construction of the treatment plant they're building on Lake Benson (due to open in '09 I think). That would take a lot of the strain off Falls Lake.