Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Alderson, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 925ft / 282mTotal length
  • $83,618,000Total costs
  • 123,659Total average daily traffic
  • 14,934Total average daily truck traffic
  • 197,854Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Alderson
  • No street view available for this location

New bridges in Alderson, OK - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 31930-1939
  • 11940-1949
  • 21970-1979
  • 51980-1989
  • 61990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Alderson, OK
Average Bridge Truck Traffic in Alderson, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 64.3%Good
  • 14.3%Satisfactory
  • 7.1%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 35.7%Very good
  • 35.7%Good
  • 21.4%Satisfactory
  • 7.1%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 21.4%Very good
  • 35.7%Good
  • 28.6%Satisfactory
  • 7.1%Fair
  • 7.1%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.5%Very good
  • 31.6%Good
  • 42.1%Satisfactory
  • 10.5%Fair
  • 5.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Very good
  • 42.9%Good
  • 14.3%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
Find on map >>   Show street view

Structure Number: 659,  Location: 1.4 MI NE S.H. 9 (Lat: 35.029319,  Lng: -99.086231),  Route carried "on" structure: Business State highway 9B,  Year Built: 1918,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 3,500 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,600 (year 2040),  Features Intersected: CREEK,  Facility Carried by Structure: S.H. 9 BUS.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.140,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 2559,  Location: 1 S 3.6 W OF ROSS (Lat: 35.579511,  Lng: -97.063300),  Route carried "on" structure: County highway E0990,  Year Built: 1930,  Status: Temporarily open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 375 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 600 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.080,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Satisfactory,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $246,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 6356,  Location: 5TH ST. .6 E OF EASTERN (Lat: 35.023117,  Lng: -99.082708),  Route carried "on" structure: City street E1375,  Year Built: 1938,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.13m (13.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $335,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6457,  Location: .1 S OF HWY9 ON EASTERN (Lat: 35.014878,  Lng: -99.087525),  Route carried "on" structure: City street N2185,  Year Built: 1938,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.84m (15.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $393,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10061,  Location: 3.2 MI E OF KREBS (Lat: 34.930117,  Lng: -95.653136),  Route carried "on" structure: County highway 6105,  Year Built: 1943,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 475 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 760 (year 2040),  Design Load: H 20,  Features Intersected: EAST KREBS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.573,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 18653,  Location: 0.2 SW MERIDIAN (Lat: 35.422686,  Lng: -97.605806),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 20,000 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 32,000 (year 2040),  Features Intersected: CREEK,  Facility Carried by Structure: NEWCASTLE ROAD
Minimum Vertical Clearance: 7.34m (24.08ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.4m (14.4ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $61,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 19053,  Location: 3. S .3 W BACHE (Lat: 34.851814,  Lng: -95.654511),  Route carried "on" structure: County highway 6170C,  Year Built: 1975,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: PEACEABLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.72m (25.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $394,000,  Roadway Improvement Cost: $217,000,  Total Project Cost: $612,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19681,  Location: 2 S OF ALDERSON (Lat: 34.872258,  Lng: -95.701361),  Route carried "on" structure: County highway 6182C,  Year Built: 1980,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $276,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 21481,  Location: 4.5 MI W OF DOW (Lat: 34.869422,  Lng: -95.665708),  Route carried "on" structure: County highway 6126C,  Year Built: 1987,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.550,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 22421,  Location: AT JCT OF I-40 & 35 (Lat: 35.466547,  Lng: -97.500214),  Route carried "on" structure: Interstate 235,  Year Built: 1989,  Status: Open,  Structure Length: 44.38m (145.60ft),  Average Daily Traffic: 43,500 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 69,600 (year 2040),  Design Load: HS 20,  Features Intersected: RENO/BNSF R.R/I-235 RMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Number Of Approach Spans: 2,  Length of Maximum Span: 60.4m (198.2ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 56.37m (184.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $14,462,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $20,035,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22424,  Location: OSAGE KAY CO. LINE (Lat: 36.680361,  Lng: -97.067578),  Route carried "on" structure: US 60,  Year Built: 1989,  Status: Open,  Structure Length: 69.22m (227.10ft),  Average Daily Traffic: 6,800 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 10,880 (year 2040),  Design Load: HS 20,  Features Intersected: ARK RIVER & CO RD UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 18,  Length of Maximum Span: 38.7m (127.0ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 69.22m (227.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $6,668,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $11,801,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22426,  Location: 2.1 MI N OF I-40 (Lat: 35.485375,  Lng: -97.511031),  Route carried "on" structure: Interstate 235,  Year Built: 1989,  Status: Open,  Structure Length: 130.24m (427.30ft),  Average Daily Traffic: 46,600 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 74,560 (year 2040),  Design Load: HS 20,  Features Intersected: NE16TH PL/23RDST/RR/RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.380,  Lanes on structure: 3,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 26,  Length of Maximum Span: 50.3m (165.0ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 134.11m (439.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $34,408,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $41,110,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22427,  Location: 1E 9.4N OF US64/US281 (Lat: 36.933639,  Lng: -98.630631),  Route carried "on" structure: County highway N2460,  Year Built: 1990,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 24 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 38 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.4m (27.6ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 77.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.22m (10.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $165,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $261,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 22431,  Location: 1.1S 1.W OF OKEENE (Lat: 36.100314,  Lng: -98.334933),  Route carried "on" structure: County highway N2620,  Year Built: 1990,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $149,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $236,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 22697,  Location: 0.5 MI N OF BACHE (Lat: 34.903383,  Lng: -95.648239),  Route carried "on" structure: County highway N4140,  Year Built: 1991,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: BUCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.79m (9.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 22995,  Location: 2 E& 1 S OF KREBS (Lat: 34.912600,  Lng: -95.685275),  Route carried "on" structure: County highway 6124C,  Year Built: 1992,  Status: Open,  Structure Length: 1.69m (5.54ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: BUCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.56m (14.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $371,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23978,  Location: .5 E. OF EASTERN ON 3RD (Lat: 35.025772,  Lng: -99.083403),  Route carried "on" structure: City street E1372,  Year Built: 1994,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: FRISCO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 24577,  Location: 3.1 S .5 W OF ALDERSON (Lat: 34.855044,  Lng: -95.705836),  Route carried "on" structure: County highway 6126C,  Year Built: 1995,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: MILLER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.562,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.23m (17.16ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $267,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $426,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 25404,  Location: 1 N & 1 E OF DALE (Lat: 35.405586,  Lng: -97.028211),  Route carried "on" structure: County highway 6350C,  Year Built: 2001,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 340 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 544 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.11m (10.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26627,  Location: 4.96 E JCT US-59 (Lat: 34.874006,  Lng: -94.527672),  Route carried "on" structure: State highway 128,  Year Built: 2007,  Status: Open,  Structure Length: 10.13m (33.23ft),  Average Daily Traffic: 780 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 1,248 (year 2040),  Design Load: HL 93,  Features Intersected: SUGAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.981,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.14m (36.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,972,000,  Roadway Improvement Cost: $3,254,000,  Total Project Cost: $5,522,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31437,  Location: .6N .6W OF GIDEON (Lat: 36.018947,  Lng: -95.051347),  Route carried "on" structure: County highway E0687,  Year Built: 2017,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 265 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 424 (year 2040),  Design Load: HL 93,  Features Intersected: BLACKBIRD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Alderson, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.