Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Anthon, Iowa (IA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 292ft / 89.2mTotal length
  • 14,835Total average daily traffic
  • 1,398Total average daily truck traffic
  • 14,835Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Anthon
  • No street view available for this location

New bridges in Anthon, IA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11920-1929
  • 21930-1939
  • 11940-1949
  • 61950-1959
  • 51960-1969
  • 31970-1979
  • 11980-1989
  • 41990-1999
  • 32000-2009
  • 22010-2019
  • 12020-2022
Average Bridge Daily Traffic in Anthon, IA
Average Bridge Truck Traffic in Anthon, IA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.2%Excellent
  • 8.3%Very good
  • 20.8%Good
  • 16.7%Satisfactory
  • 25.0%Fair
  • 16.7%Poor
  • 8.3%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.2%Excellent
  • 8.3%Very good
  • 20.8%Good
  • 25.0%Satisfactory
  • 20.8%Fair
  • 12.5%Poor
  • 8.3%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.2%Excellent
  • 8.3%Very good
  • 20.8%Good
  • 12.5%Satisfactory
  • 12.5%Fair
  • 20.8%Poor
  • 12.5%Serious
  • 8.3%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 6.7%Good
  • 50.0%Satisfactory
  • 23.3%Fair
  • 3.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 38,  Location: 087433207 (Lat: 42.388261,  Lng: -95.869028),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,220 (year 2019),  Average Future Daily Traffic: 1,220 (year 2039),  Design Load: HS 20,  Features Intersected: DRAINAGE,  Facility Carried by Structure: MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.472,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 391,  Location: 0884332 (Lat: 42.391517,  Lng: -95.866669),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 430 (year 2019),  Average Future Daily Traffic: 430 (year 2039),  Design Load: HS 20,  Features Intersected: DRAINAGE,  Facility Carried by Structure: 2ND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.367,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 1073,  Location: M70602000 (Lat: 42.556331,  Lng: -96.432006),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 50 (year 2019),  Average Future Daily Traffic: 50 (year 2041),  Features Intersected: DRAINAGE,  Facility Carried by Structure: WEST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.784,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 15.00m (49.21ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2020,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $38,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1242,  Location: P20100535 (Lat: 41.560789,  Lng: -93.732725),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 4,650 (year 2016),  Average Future Daily Traffic: 4,650 (year 2041),  Design Load: HS 20,  Features Intersected: JORDAN CREEK,  Facility Carried by Structure: FULLER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.849,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.20m (26.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $80,000,  Roadway Improvement Cost: $8,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3501,  Location: 3.3 MI. W OF W JCT SR V13 (Lat: 41.305439,  Lng: -92.533592),  Route carried "on" structure: State highway 92,  Year Built: 1958,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 2,640 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,640 (year 2041),  Design Load: H 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 298.685,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 5314,  Location: 1.3 mi. S of SR D38 (Lat: 42.357447,  Lng: -95.884219),  Route carried "on" structure: State highway 31,  Year Built: 1966,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 930 (year 2020),  Truck Traffic: 23%,  Average Future Daily Traffic: 930 (year 2041),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.058,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 5315,  Location: 1.9 mi. N of SR D30 (Lat: 42.422956,  Lng: -95.850517),  Route carried "on" structure: State highway 31,  Year Built: 1956,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 970 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 970 (year 2041),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.900,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 5316,  Location: 3.1 mi. S of SR D22 (Lat: 42.436967,  Lng: -95.840800),  Route carried "on" structure: State highway 31,  Year Built: 1956,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 970 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 970 (year 2041),  Design Load: H 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.671,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 6199,  Location: 097061104 (Lat: 43.232578,  Lng: -91.526750),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 430 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 430 (year 2040),  Features Intersected: BRANCH YELLOW RIVER,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.270,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 23.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 17.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 9193,  Location: 088321702 (Lat: 42.432708,  Lng: -94.612019),  Route carried "on" structure: County highway ,  Year Built: 1979,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 35 (year 2019),  Average Future Daily Traffic: 35 (year 2039),  Design Load: H 20,  Features Intersected: DD 9-13,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.283,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 351621,  Location: 087430304 (Lat: 42.385400,  Lng: -95.835217),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 10 (year 2041),  Features Intersected: SMALL STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.706,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 351625,  Location: 0874307 (Lat: 42.368475,  Lng: -95.889081),  Route carried "on" structure: County highway ,  Year Built: 1920,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 60 (year 2019),  Average Future Daily Traffic: 60 (year 2041),  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.370,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $27,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 351631,  Location: 087431903 (Lat: 42.341850,  Lng: -95.890556),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 10.70m (35.10ft),  Average Daily Traffic: 110 (year 2019),  Average Future Daily Traffic: 110 (year 2041),  Design Load: HS 20,  Features Intersected: LITTLE SIOUX RIVER,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.492,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 35.10m (115.16ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3517,  Location: 087432305 (Lat: 42.342089,  Lng: -95.816342),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 270 (year 2019),  Average Future Daily Traffic: 270 (year 2041),  Design Load: H 20,  Features Intersected: CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.605,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $110,000,  Roadway Improvement Cost: $11,000
Find on map >>   Show street view

Structure Number: 351721,  Location: 087432311 (Lat: 42.338419,  Lng: -95.818489),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Posted for load,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 5 (year 2019),  Average Future Daily Traffic: 5 (year 2041),  Features Intersected: STREAM,  Facility Carried by Structure: 252ND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.513,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Serious,  Channel: Fair,  Operating Rating: 29.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $26,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 35187,  Location: 087440102 (Lat: 42.372394,  Lng: -95.922219),  Route carried "on" structure: County highway ,  Year Built: 1938,  Status: Closed,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 15 (year 2019),  Average Future Daily Traffic: 15 (year 2041),  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.831,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Fair,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $13,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 351991,  Location: 087441101 (Lat: 42.371089,  Lng: -95.926103),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 20 (year 2019),  Average Future Daily Traffic: 20 (year 2041),  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.764,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 31.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $16,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 353251,  Location: 088431502 (Lat: 42.443414,  Lng: -95.844886),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 10 (year 2041),  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.513,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 51.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $16,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 35326,  Location: 088431701 (Lat: 42.443539,  Lng: -95.872453),  Route carried "on" structure: County highway ,  Year Built: 1955,  Status: Posted for load,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 15 (year 2019),  Average Future Daily Traffic: 15 (year 2041),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.854,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Fair,  Operating Rating: 9.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 15.00m (49.21ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $40,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 353271,  Location: 088432105 (Lat: 42.424694,  Lng: -95.853075),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 1.59m (5.22ft),  Average Daily Traffic: 35 (year 2019),  Average Future Daily Traffic: 35 (year 2041),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.672,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 46.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 353282,  Location: 088432107 (Lat: 42.427050,  Lng: -95.845422),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 20 (year 2019),  Average Future Daily Traffic: 20 (year 2041),  Design Load: HL 93,  Features Intersected: LITTLE SIOUX RIVER,  Facility Carried by Structure: MASON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.512,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 353331,  Location: 088433305 (Lat: 42.389483,  Lng: -95.858533),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 10.70m (35.10ft),  Average Daily Traffic: 680 (year 2019),  Truck Traffic: 27%,  Average Future Daily Traffic: 680 (year 2041),  Design Load: HS 20,  Features Intersected: LITTLE SIOUX RIVER,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.907,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 35.10m (115.16ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Other Special Inspection Date: July 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35335,  Location: 088433306 (Lat: 42.388956,  Lng: -95.852122),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 270 (year 2019),  Average Future Daily Traffic: 270 (year 2041),  Design Load: H 20,  Features Intersected: BIG CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.554,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.20m (46.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 353361,  Location: 088433406 (Lat: 42.387072,  Lng: -95.835219),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 10 (year 2038),  Design Load: HL 93,  Features Intersected: BIG WRIGHT CREEK,  Facility Carried by Structure: MICHIGAN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.893,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 353372,  Location: 088433405 (Lat: 42.388972,  Lng: -95.834350),  Route carried "on" structure: County highway ,  Year Built: 2011,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 370 (year 2019),  Truck Traffic: 22%,  Average Future Daily Traffic: 370 (year 2038),  Design Load: HL 93,  Features Intersected: BIG CREEK,  Facility Carried by Structure: D38 (220TH ST)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.922,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35338,  Location: 088433503 (Lat: 42.392442,  Lng: -95.809217),  Route carried "on" structure: County highway ,  Year Built: 1962,  Status: Posted for load-capacity,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 370 (year 2019),  Truck Traffic: 22%,  Average Future Daily Traffic: 370 (year 2041),  Design Load: H 20,  Features Intersected: BIG CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.061,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 12.80m (41.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 353391,  Location: 088433603 (Lat: 42.399444,  Lng: -95.797608),  Route carried "on" structure: County highway ,  Year Built: 1900,  Year Reconstructed: 1980,  Status: Posted for load,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 20 (year 2019),  Average Future Daily Traffic: 20 (year 2041),  Features Intersected: WRIGHT CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.846,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Serious,  Channel: Fair,  Operating Rating: 17.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 15.10m (49.54ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $40,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 3534,  Location: 0884336 (Lat: 42.396503,  Lng: -95.805972),  Route carried "on" structure: County highway ,  Year Built: 1950,  Status: Closed,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 180 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 180 (year 2041),  Design Load: H 15,  Features Intersected: COON CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.778,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Satisfactory,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 15.80m (51.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $427,000,  Roadway Improvement Cost: $43,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 353411,  Location: 0884336 (Lat: 42.391092,  Lng: -95.805986),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 15 (year 2019),  Average Future Daily Traffic: 15 (year 2039),  Design Load: HS 20,  Features Intersected: BIG CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.178,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 14.20m (46.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 35362,  Location: 088443501 (Lat: 42.400069,  Lng: -95.932003),  Route carried "on" structure: County highway ,  Year Built: 1949,  Year Reconstructed: 1980,  Status: Posted for load,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 25 (year 2019),  Average Future Daily Traffic: 25 (year 2041),  Features Intersected: WOLF CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.340,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 25.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 9.00m (29.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $24,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Discuss Anthon, Iowa (IA) on our hugely popular Iowa forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.