Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Avon, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 75ft / 22.7mTotal length
  • $9,523,000Total costs
  • 34,316Total average daily traffic
  • 4,177Total average daily truck traffic
  • 46,610Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Avon
  • No street view available for this location

New bridges in Avon, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 21960-1969
  • 21980-1989
  • 21990-1999
  • 22000-2009
Average Bridge Daily Traffic in Avon, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Very good
  • 40.0%Good
  • 20.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Very good
  • 40.0%Good
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 40.0%Good
  • 60.0%Satisfactory
Find on map >>   Show street view

Structure Number: 1615,  Location: 0.4 MI S OF CO 26 (Lat: 34.843228,  Lng: -87.227978),  Route carried "on" structure: County highway 70,  Year Built: 1937,  Status: Posted for load,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 205 (year 1989),  Truck Traffic: 10%,  Average Future Daily Traffic: 410 (year 2031),  Features Intersected: LEGG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 14.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $327,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $360,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7708,  Location: CO RD 13 TO CO RD 33 (Lat: 31.176067,  Lng: -85.263722),  Route carried "on" structure: County highway 34,  Year Built: 1962,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 355 (year 1993),  Truck Traffic: 7%,  Average Future Daily Traffic: 600 (year 2033),  Features Intersected: WEBB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $369,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $406,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10115,  Location: 3.9 MI N JCT US 431 (Lat: 33.618717,  Lng: -85.657017),  Route carried "on" structure: State highway 281,  Year Built: 1969,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 80 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 112 (year 2040),  Design Load: HS 20,  Features Intersected: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 794.614,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,620,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $1,782,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12073,  Location: 5.3 MI. E. SR 210 (Lat: 31.190250,  Lng: -85.290333),  Route carried "on" structure: US 84,  Year Built: 1927,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 16,230 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 21,773 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 348.782,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.7m (94.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,568,000,  Roadway Improvement Cost: $157,000,  Total Project Cost: $1,725,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13858,  Location: US 84 TO CO RD 26 (Lat: 31.199036,  Lng: -85.287861),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 220 (year 1993),  Truck Traffic: 3%,  Average Future Daily Traffic: 360 (year 2033),  Design Load: HS 20,  Features Intersected: COWARTS CREEK,  Facility Carried by Structure: BLUFF SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $437,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $481,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14528,  Location: 0.5 MI. W. OF ASHFORD (Lat: 31.185511,  Lng: -85.265239),  Route carried "on" structure: US 84,  Year Built: 1988,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 16,530 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 22,176 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 351.251,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,227,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $2,450,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1615,  Location: WEST OF CHURCH (Lat: 31.192342,  Lng: -85.267467),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 280 (year 1995),  Truck Traffic: 5%,  Average Future Daily Traffic: 500 (year 2033),  Design Load: HS 20,  Features Intersected: WEBB CREEK,  Facility Carried by Structure: BLUFF SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.019,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $244,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $268,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16936,  Location: CO RD 33 TO SILCOX RD (Lat: 31.164178,  Lng: -85.267331),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 63 (year 2005),  Average Future Daily Traffic: 240 (year 2033),  Design Load: HS 20,  Features Intersected: WEBB CREEK,  Facility Carried by Structure: DANFORD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17815,  Location: US 84 TO CO RD 26 (Lat: 31.188094,  Lng: -85.266217),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 138 (year 2001),  Truck Traffic: 5%,  Average Future Daily Traffic: 138 (year 2033),  Design Load: HS 20,  Features Intersected: WEBB CREEK,  Facility Carried by Structure: BLUFF SPRINGS RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 82.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $348,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19626,  Location: APPR .19 M EAST OF CR 65 (Lat: 31.176744,  Lng: -85.298161),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 215 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 301 (year 2034),  Design Load: HS 20,  Features Intersected: COWARTS CREEK,  Facility Carried by Structure: PREVATT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 75.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $733,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $806,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Discuss Avon, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.