Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Barwick, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 72ft / 21.9mTotal length
  • $4,220,000Total costs
  • 3,420Total average daily traffic
  • 55Total average daily truck traffic
  • 5,130Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Barwick
  • No street view available for this location

New bridges in Barwick, GA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11950-1959
  • 11960-1969
  • 21970-1979
  • 31980-1989
  • 11990-1999
  • 12000-2009
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 40.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 275044,  Location: APP 3.5 MI S OF BARWICK (Lat: 30.837689,  Lng: -83.726589),  Route carried "on" structure: County highway 195,  Year Built: 1980,  Status: Posted for load,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 220 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 330 (year 2031),  Design Load: HS 15,  Features Intersected: DRY LAKE CREEK,  Facility Carried by Structure: DIXIE-BARWICK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $586,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 275066,  Location: APP 3.3 MI S OF BARWICK (Lat: 30.847258,  Lng: -83.717728),  Route carried "on" structure: County highway 269,  Year Built: 1962,  Status: Posted for load,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 690 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,035 (year 2031),  Design Load: H 15,  Features Intersected: DRY LAKE CREEK,  Facility Carried by Structure: DRY LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $475,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2750052,  Location: APP 3 MI W OF BARWICK (Lat: 30.878908,  Lng: -83.783647),  Route carried "on" structure: County highway 561,  Year Built: 1935,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 730 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,095 (year 2031),  Design Load: H 15,  Features Intersected: PISCOLA CREEK TRIB.,  Facility Carried by Structure: COFFEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $135,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2750053,  Location: APP 2 MI W OF BARWICK (Lat: 30.881150,  Lng: -83.771908),  Route carried "on" structure: County highway 561,  Year Built: 1976,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 730 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,095 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PISCOLA CREEK,  Facility Carried by Structure: COFFEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $254,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $381,000
Find on map >>   Show street view

Structure Number: 2755022,  Location: APP 4 MI NE OF BOSTON (Lat: 30.850089,  Lng: -83.770069),  Route carried "on" structure: County highway 33,  Year Built: 1973,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 320 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 480 (year 2031),  Design Load: H 15,  Features Intersected: PISCOLA CREEK,  Facility Carried by Structure: OZELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.98m (39.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $527,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $791,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2755028,  Location: APP 1 MI NW OF BARWICK (Lat: 30.903919,  Lng: -83.755478),  Route carried "on" structure: County highway 36,  Year Built: 1989,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 150 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 225 (year 2031),  Design Load: H 15,  Features Intersected: PISCOLA CREEK TRIB.,  Facility Carried by Structure: POPE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2755101,  Location: APP 3 MI W OF BARWICK (Lat: 30.887889,  Lng: -83.793908),  Route carried "on" structure: County highway 279,  Year Built: 1989,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 120 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 180 (year 2031),  Design Load: H 15,  Features Intersected: PISCOLA CREEK TRIB.,  Facility Carried by Structure: STEPHENSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2755102,  Location: APP 3 MI SW OF BARWICK (Lat: 30.871647,  Lng: -83.778089),  Route carried "on" structure: County highway 301,  Year Built: 1957,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 110 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 165 (year 2031),  Design Load: H 15,  Features Intersected: PISCOLA CREEK TRIB,  Facility Carried by Structure: SALEM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 2755125,  Location: 2 MILES NORTHWEST OF BARW (Lat: 30.912839,  Lng: -83.763689),  Route carried "on" structure: County highway 36,  Year Built: 1996,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 150 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 225 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PISCOLA CREEK,  Facility Carried by Structure: POPE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: January 2020,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $821,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2755152,  Location: APP. 2.5 MILES NORTHWEST (Lat: 30.915547,  Lng: -83.778819),  Route carried "on" structure: County highway 301,  Year Built: 2005,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 200 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 300 (year 2031),  Design Load: HS 20,  Features Intersected: PISCOLA CREEK TRIB,  Facility Carried by Structure: SALEM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 60.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $469,000,  Deck Structure Type: Concrete Precast Panels
Discuss Barwick, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.