Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Bedford Hills, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 131ft / 40.3mTotal length
  • $50,799,000Total costs
  • 354,101Total average daily traffic
  • 31,072Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bedford Hills
  • No street view available for this location

New bridges in Bedford Hills, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 31940-1949
  • 21950-1959
  • 141960-1969
  • 21990-1999
Reconstructed bridges in Bedford Hills, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 01990-1999
  • 02000-2009
  • 02010-2019
  • 12020-2022
Average Bridge Daily Traffic in Bedford Hills, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 10.0%Very good
  • 50.0%Good
  • 30.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 60.0%Good
  • 10.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.0%Good
  • 50.0%Satisfactory
  • 10.0%Fair
  • 10.0%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 28.6%Satisfactory
  • 42.9%Fair
  • 14.3%Poor
Find on map >>   Show street view

Structure Number: 10372,  Location: 2.5 MI S JCT RTS 117+35 (Lat: 41.236222,  Lng: -73.701653),  Route carried "on" structure: State highway 117,  Year Built: 1942,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 13,871 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,936 (year 2040),  Features Intersected: PARKING ACCESS ROAD, MNR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.577,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.32m (14.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $6,075,000,  Roadway Improvement Cost: $3,557,000,  Total Project Cost: $9,632,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103721,  Location: 2.4 MI S JCT RTS 117+35 (Lat: 41.237731,  Lng: -73.701181),  Route carried "on" structure: State highway 117,  Year Built: 1942,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 13,871 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,936 (year 2040),  Design Load: H 20,  Features Intersected: 987D 987D87012305 SB, RT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.722,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.01m (9.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,342,000,  Roadway Improvement Cost: $2,543,000,  Total Project Cost: $6,885,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 105309,  Location: 1.8 MI N JCT RTS I684+172 (Lat: 41.220108,  Lng: -73.685706),  Route carried "on" structure: Other road ,  Year Built: 1968,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 10.21m (33.50ft),  Average Daily Traffic: 361 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 505 (year 2037),  Design Load: HS 20,  Features Intersected: 684I684I87011144, RTE I6,  Facility Carried by Structure: BROAD BROOK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.21m (33.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,566,000,  Roadway Improvement Cost: $2,674,000,  Total Project Cost: $7,240,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1053101,  Location: 2.2 MI N JCT I684 & SH172 (Lat: 41.225953,  Lng: -73.683656),  Route carried "on" structure: Interstate 684,  Year Built: 1966,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 28,096 (year 2000),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: CR98-BEDFD CTR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.829,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,449,000,  Roadway Improvement Cost: $1,434,000,  Total Project Cost: $3,883,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1053102,  Location: 2.2 MI N JCT I684 & SH172 (Lat: 41.225581,  Lng: -73.683061),  Route carried "on" structure: Interstate 684,  Year Built: 1966,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 26,716 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 45,241 (year 2040),  Design Load: HS 20,  Features Intersected: CR98-BEDFD CTR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.878,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,631,000,  Roadway Improvement Cost: $1,541,000,  Total Project Cost: $4,172,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1053111,  Location: 3.2 MI N JCT RTS I684+172 (Lat: 41.240164,  Lng: -73.675900),  Route carried "on" structure: Interstate 684,  Year Built: 1966,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 28,096 (year 2000),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: HARRIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.535,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,369,000,  Roadway Improvement Cost: $1,973,000,  Total Project Cost: $5,342,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1053112,  Location: 3.2 MI N JCT I684 & SH172 (Lat: 41.239708,  Lng: -73.675300),  Route carried "on" structure: Interstate 684,  Year Built: 1966,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 26,716 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 45,241 (year 2040),  Design Load: HS 20,  Features Intersected: HARRIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.567,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,949,000,  Roadway Improvement Cost: $1,727,000,  Total Project Cost: $4,677,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1091141,  Location: 1.4 MI N I684 - EXIT 4 (Lat: 41.211347,  Lng: -73.685978),  Route carried "on" structure: Interstate 684,  Year Built: 1968,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 28,096 (year 2000),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: BROAD BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.848,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 96.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $381,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $604,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1091142,  Location: 1.4 MI N EXIT 4 OF I684 (Lat: 41.210489,  Lng: -73.685383),  Route carried "on" structure: Interstate 684,  Year Built: 1968,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 26,716 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 45,241 (year 2040),  Design Load: HS 20,  Features Intersected: BROAD BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.188,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 96.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $381,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $604,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1091151,  Location: 1.8 MI N RTE I684 INT 4 (Lat: 41.220483,  Lng: -73.685622),  Route carried "on" structure: Interstate 684,  Year Built: 1968,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 28,096 (year 2000),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: BROAD BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.250,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Channel: Fair,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,210,000,  Roadway Improvement Cost: $709,000,  Total Project Cost: $1,919,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1091152,  Location: 1.7 MI N RTE I684 INT 4 (Lat: 41.218731,  Lng: -73.685131),  Route carried "on" structure: Interstate 684,  Year Built: 1968,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 26,716 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 45,241 (year 2040),  Design Load: HS 20,  Features Intersected: BROAD BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.105,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,224,000,  Roadway Improvement Cost: $717,000,  Total Project Cost: $1,942,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334832,  Location: 2.9 MI NE OF MT KISCO (Lat: 41.228383,  Lng: -73.688578),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 4,034 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,991 (year 2040),  Design Load: HS 20,  Features Intersected: BROAD BROOK,  Facility Carried by Structure: BEDFORD CENTER RD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 1.191,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $817,000,  Roadway Improvement Cost: $478,000,  Total Project Cost: $1,295,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 334841,  Location: 4.2 MI NE OF MOUNT KISCO (Lat: 41.231314,  Lng: -73.657747),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 104 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 146 (year 2037),  Features Intersected: BEAVER DAM CREEK,  Facility Carried by Structure: MATTHEWS MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $477,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 550098,  Location: 1.0 MI E JCT RTS SMRP<117 (Lat: 41.245731,  Lng: -73.685283),  Route carried "on" structure: Other road 117,  Year Built: 1954,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 4,579 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,600 (year 2040),  Design Load: HS 20,  Features Intersected: 987DX SB, RTE 987D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.379,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,341,000,  Roadway Improvement Cost: $786,000,  Total Project Cost: $2,127,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 103721,  Location: 2.4 MI S JCT RTS 117+35 (Lat: 41.237731,  Lng: -73.701181),  Route carried "under" structure: Other road 987D,  Year Built: 1942,  Structure Length: 0. m,  Average Daily Traffic: 31,791 (year 2002),  Features Intersected: 987D 987D87012305 SB, RT,  Facility Carried by Structure: RTE 117
Minimum Vertical Clearance: 6.86m (22.51ft),  Kilometerpoint: 35.511,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 105309,  Location: 1.8 MI N JCT RTS I684+172 (Lat: 41.220108,  Lng: -73.685706),  Route carried "under" structure: Interstate 684,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 58,616 (year 2002),  Features Intersected: 684I684I87011144, RTE I6,  Facility Carried by Structure: BROAD BROOK RD
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 23.170,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 1053101,  Location: 2.2 MI N JCT I684 & SH172 (Lat: 41.225953,  Lng: -73.683656),  Route carried "under" structure: County highway ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 2,017 (year 2015),  Truck Traffic: 5%,  Features Intersected: CR98-BEDFD CTR RD,  Facility Carried by Structure: RTE I684
Minimum Vertical Clearance: 4.59m (15.06ft),  Kilometerpoint: 1.673,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 1053102,  Location: 2.2 MI N JCT I684 & SH172 (Lat: 41.225581,  Lng: -73.683061),  Route carried "under" structure: County highway ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 2,017 (year 2015),  Truck Traffic: 5%,  Features Intersected: CR98-BEDFD CTR RD,  Facility Carried by Structure: RTE I684
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 1.689,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 1053111,  Location: 3.2 MI N JCT RTS I684+172 (Lat: 41.240164,  Lng: -73.675900),  Route carried "under" structure: Other road ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 1,021 (year 2016),  Truck Traffic: 3%,  Features Intersected: HARRIS ROAD,  Facility Carried by Structure: RTE I684
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 2.349,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 1053112,  Location: 3.2 MI N JCT I684 & SH172 (Lat: 41.239708,  Lng: -73.675300),  Route carried "under" structure: Other road ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 1,021 (year 2016),  Truck Traffic: 3%,  Features Intersected: HARRIS ROAD,  Facility Carried by Structure: RTE I684
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 2.912,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 550098,  Location: 1.0 MI E JCT RTS SMRP<117 (Lat: 41.245731,  Lng: -73.685283),  Route carried "under" structure: Other road 987D,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 1,550 (year 2021),  Features Intersected: 987DX SB, RTE 987D,  Facility Carried by Structure: RTE 117
Minimum Vertical Clearance: 4.41m (14.47ft),  Kilometerpoint: 45.696,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 771275,  Location: 3.5 MI NE OF MOUNT KISCO (Lat: 41.245136,  Lng: -73.684717),  Route carried "under" structure: Other road ,  Year Built: 1992,  Structure Length: 0. m,  Truck Traffic: 3%,  Features Intersected: HARRIS ROAD,  Facility Carried by Structure: MNRR HA LINE
Minimum Vertical Clearance: 4.41m (14.47ft),  Kilometerpoint: 2.993,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 22.8m (74.8ft)

Discuss Bedford Hills, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.