Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Beulah, Wyoming (WY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 174ft / 52.9mTotal length
  • $1,604,000Total costs
  • 32,062Total average daily traffic
  • 5,249Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Beulah
  • No street view available for this location

New bridges in Beulah, WY - historical statistics
  • New bridges - historical statistics
  • 11960-1969
  • 111970-1979
  • 11980-1989
  • 11990-1999
  • 62010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Very good
  • 11.1%Good
  • 38.9%Satisfactory
  • 11.1%Fair
  • 5.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 27.8%Good
  • 33.3%Satisfactory
  • 5.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Very good
  • 50.0%Good
  • 16.7%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.3%Very good
  • 36.4%Good
  • 27.3%Satisfactory
  • 9.1%Fair
Find on map >>   Show street view

Structure Number: DHL,  Location: Sundance - S Dakota Line (Lat: 44.537792,  Lng: -104.144672),  Route carried "on" structure: Interstate 90,  Year Built: 1977,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 2,978 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 4,169 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Machinery Pass
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 328.770,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: DHM,  Location: Sundance - S Dakota Line (Lat: 44.538050,  Lng: -104.144811),  Route carried "on" structure: Interstate 90,  Year Built: 1977,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 3,024 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 4,234 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Machinery Pass
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 328.567,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: DHN,  Location: Sundance - S Dakota Line (Lat: 44.543422,  Lng: -104.093836),  Route carried "on" structure: Interstate 90,  Year Built: 1977,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 2,978 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 4,169 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Cr CR 108 / Rifle Pit Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 332.920,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: DHO,  Location: Sundance - S Dakota Line (Lat: 44.543667,  Lng: -104.093625),  Route carried "on" structure: Interstate 90,  Year Built: 1977,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 3,024 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 4,234 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Cr CR 108 / Rifle Pit Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 332.750,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: DHP,  Location: Sundance - S Dakota Line (Lat: 44.543364,  Lng: -104.092564),  Route carried "on" structure: Interstate 90,  Year Built: 1977,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 2,978 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 4,169 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Sand Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 333.022,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: DHQ,  Location: Sundance - S Dakota Line (Lat: 44.543628,  Lng: -104.092542),  Route carried "on" structure: Interstate 90,  Year Built: 1977,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 3,024 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 4,234 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Sand Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 332.836,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: DHR,  Location: Sundance - S Dakota Line (Lat: 44.543289,  Lng: -104.081061),  Route carried "on" structure: County highway 129,  Year Built: 1977,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 551 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 771 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: I-90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.126,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: DHS,  Location: Sundance - S Dakota Line (Lat: 44.542531,  Lng: -104.069036),  Route carried "on" structure: Interstate 90,  Year Built: 1977,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 2,978 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 4,169 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Machinery Pass
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 334.895,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: DHT,  Location: Sundance - S Dakota Line (Lat: 44.542794,  Lng: -104.069031),  Route carried "on" structure: Interstate 90,  Year Built: 1977,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 3,024 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 4,234 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Machinery Pass
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 334.708,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: DWM,  Location: 1 Mi. S.W. Of Beulah (Lat: 44.537661,  Lng: -104.112417),  Route carried "on" structure: County highway 108,  Year Built: 1965,  Status: Posted for load,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 43 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 60 (year 2041),  Design Load: HS 20,  Features Intersected: Sand Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.962,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 12.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 7.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.25m (20.51ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $42,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: FLC,  Location: Sundance-S.D. State Line (Lat: 44.544542,  Lng: -104.091425),  Route carried "on" structure: ServiceOther road ,  Year Built: 1988,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 712 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 997 (year 2041),  Design Load: HS 20,  Features Intersected: Sand Creek,  Facility Carried by Structure: I-90 Service Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.840,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: KIB,  Location: 1.5 Miles N. Of Beulah (Lat: 44.560444,  Lng: -104.080028),  Route carried "on" structure: County highway 142,  Year Built: 1994,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 74 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 104 (year 2041),  Design Load: HS 20,  Features Intersected: Redwater Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $13,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $44,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: NAR,  Location: 3.4 Mi. S.W Of Beulah (Lat: 44.504692,  Lng: -104.098319),  Route carried "on" structure: County highway 129,  Year Built: 2017,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 112 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 157 (year 2041),  Design Load: HL 93,  Features Intersected: Sand Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.744,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $253,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: NAS,  Location: 3.8 Mi. S.W Of Beulah (Lat: 44.502856,  Lng: -104.098797),  Route carried "on" structure: County highway 129,  Year Built: 2017,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 112 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 157 (year 2041),  Design Load: HL 93,  Features Intersected: Sand Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.964,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $253,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: NAT,  Location: 4.0 Mi. S.W Of Beulah (Lat: 44.498422,  Lng: -104.102481),  Route carried "on" structure: County highway 129,  Year Built: 2017,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 112 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 157 (year 2041),  Design Load: HL 93,  Features Intersected: Sand Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.605,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $253,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: NAU,  Location: 4.0 Mi. S.W Of Beulah (Lat: 44.496119,  Lng: -104.107983),  Route carried "on" structure: County highway 129,  Year Built: 2017,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 112 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 157 (year 2041),  Design Load: HL 93,  Features Intersected: Sand Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.265,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $253,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: NAV,  Location: 4.0 Mi. S.W Of Beulah (Lat: 44.491769,  Lng: -104.107631),  Route carried "on" structure: County highway 129,  Year Built: 2017,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 112 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 157 (year 2041),  Design Load: HL 93,  Features Intersected: Sand Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.828,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $253,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: NAW,  Location: 4.0 Mi. S.W Of Beulah (Lat: 44.487331,  Lng: -104.117456),  Route carried "on" structure: County highway 129,  Year Built: 2017,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 112 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 157 (year 2041),  Design Load: HL 93,  Features Intersected: Sand Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.104,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $253,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: DHR,  Location: Sundance - S Dakota Line (Lat: 44.543289,  Lng: -104.081061),  Route carried "under" structure: Interstate 90,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 3,024 (year 2021),  Truck Traffic: 17%,  Features Intersected: I-90,  Facility Carried by Structure: Cr Cnty Rd 129
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 333.749,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: DHR,  Location: Sundance - S Dakota Line (Lat: 44.543289,  Lng: -104.081061),  Route carried "under" structure: Interstate 90,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 2,978 (year 2021),  Truck Traffic: 17%,  Features Intersected: I-90,  Facility Carried by Structure: Cr Cnty Rd 129
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 333.934,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Discuss Beulah, Wyoming (WY) on our hugely popular Wyoming forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.