Bridge Statistics for Bonner-West Riverside, Montana (MT)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 266ft / 81.1mTotal length
  • $2,282,000Total costs
  • 106,432Total average daily traffic
  • 11,911Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bonner-West Riverside
  • No street view available for this location

New bridges in Bonner-West Riverside, MT - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 81960-1969
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Bonner-West Riverside, MT - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 21980-1989
  • 11990-1999
Average Bridge Daily Traffic in Bonner-West Riverside, MT
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 37.5%Good
  • 50.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 25.0%Good
  • 50.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 37.5%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 1434,  Location: 0.6M W BONNER (Lat: 46.871739,  Lng: -113.886933),  Route carried "on" structure: Interstate 90,  Year Built: 2018,  Status: Open,  Structure Length: 14.82m (48.62ft),  Average Daily Traffic: 15,074 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 15,828 (year 2040),  Design Load: HL 93,  Features Intersected: BLACKFOOT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 176.707,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 64.0m (210.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: I00090109+04091,  Location: 1.2M W BONNER (Lat: 46.878183,  Lng: -113.909428),  Route carried "on" structure: Interstate 90,  Year Built: 1965,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 12.46m (40.88ft),  Average Daily Traffic: 16,309 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 17,124 (year 2040),  Design Load: HS 20,  Features Intersected: SEP JUNIPER DR-CLARK FK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 174.668,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 3,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 70.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.30m (43.64ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $770,000,  Roadway Improvement Cost: $385,000,  Total Project Cost: $1,155,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: I00090109+04092,  Location: 1.2M W BONNER (Lat: 46.878331,  Lng: -113.909664),  Route carried "on" structure: Interstate 90,  Year Built: 1965,  Status: Open,  Structure Length: 12.16m (39.90ft),  Average Daily Traffic: 16,309 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 17,124 (year 2040),  Design Load: HS 20,  Features Intersected: SEP JUNIPER DR-CLARK FK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 174.701,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 3,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.00m (42.65ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $751,000,  Roadway Improvement Cost: $376,000,  Total Project Cost: $1,127,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: I00090110+00331,  Location: 0.6M W BONNER (Lat: 46.873608,  Lng: -113.889525),  Route carried "on" structure: Interstate 90,  Year Built: 1963,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 10.02m (32.87ft),  Average Daily Traffic: 15,074 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 15,828 (year 2040),  Design Load: HS 20,  Features Intersected: RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 176.419,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2020,  Other Special Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: I00090110+00332,  Location: 0.6M W BONNER (Lat: 46.873536,  Lng: -113.888994),  Route carried "on" structure: Interstate 90,  Year Built: 1963,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 10.94m (35.89ft),  Average Daily Traffic: 15,074 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 15,828 (year 2040),  Design Load: HS 20,  Features Intersected: RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 176.529,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2020,  Other Special Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P00024000+00001,  Location: 1M W BONNER (Lat: 46.876681,  Lng: -113.893408),  Route carried "on" structure: State highway 200,  Year Built: 1965,  Status: Open,  Structure Length: 7.43m (24.38ft),  Average Daily Traffic: 5,873 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,167 (year 2040),  Design Load: HS 20,  Features Intersected: INT BONNER I 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.012,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: P00024000+05841,  Location: 1M W BONNER (Lat: 46.872961,  Lng: -113.883719),  Route carried "on" structure: State highway 200,  Year Built: 2009,  Status: Open,  Structure Length: 10.59m (34.74ft),  Average Daily Traffic: 5,873 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,167 (year 2040),  Design Load: HL 93,  Features Intersected: BLACKFOOT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.958,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.5m (31.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.7m (127.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S00210000+02131,  Location: BONNER (Lat: 46.866858,  Lng: -113.872400),  Route carried "on" structure: State highway 210,  Year Built: 1929,  Year Reconstructed: 1953,  Status: Open,  Structure Length: 2.70m (8.86ft),  Average Daily Traffic: 1,572 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,651 (year 2040),  Design Load: H 15,  Features Intersected: MRL SPUR (NOT IN USE)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.355,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: I00090109+04091,  Location: 12M W BONNER (Lat: 46.878183,  Lng: -113.909428),  Route carried "under" structure: ServiceCounty highway 32251,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Features Intersected: SEP JUNIPER DR-CLARK FK,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 0.401,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: I00090109+04092,  Location: 12M W BONNER (Lat: 46.878331,  Lng: -113.909664),  Route carried "under" structure: ServiceCounty highway 32251,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Features Intersected: SEP JUNIPER DR-CLARK FK,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 6.63m (21.75ft),  Kilometerpoint: 0.385,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: P00024000+00001,  Location: 1M W BONNER (Lat: 46.876681,  Lng: -113.893408),  Route carried "under" structure: Interstate 90,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 15,074 (year 2020),  Truck Traffic: 13%,  Features Intersected: INT BONNER I 90,  Facility Carried by Structure: S 200
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 175.967,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)