Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Boxford, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 148ft / 44.5mTotal length
  • $44,952,000Total costs
  • 512,457Total average daily traffic
  • 31,413Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Boxford
  • No street view available for this location

New bridges in Boxford, MA - historical statistics
  • New bridges - historical statistics
  • 121950-1959
  • 71970-1979
  • 11980-1989
  • 12000-2009
  • 12020-2022
Average Bridge Daily Traffic in Boxford, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 30.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 18.2%Good
  • 36.4%Satisfactory
  • 36.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.2%Very good
  • 18.2%Good
  • 36.4%Satisfactory
  • 27.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 83.3%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: B190028REMUNNBI,  Location: 1.1 MILE WEST OF I 95 (Lat: 42.655214,  Lng: -70.999422),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 1,200 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 869 (year 2032),  Design Load: HS 20,  Features Intersected: WATER FISH BROOK,  Facility Carried by Structure: HWY MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.660,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 81.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,056,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,585,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B190032R3MUNNBI,  Location: MILE WEST I 95 (Lat: 42.644667,  Lng: -70.990056),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 300 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,900 (year 2032),  Design Load: H 20,  Features Intersected: WATER FISH BROOK,  Facility Carried by Structure: HWY LOCKWOOD LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.50m (1.64ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: January 2021,  Underwater Inspection Date: March 2019,  Bridge Improvement Cost: $299,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $449,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: B190082VADOTNBI,  Location: .9 MI N IPSWICH RIVER (Lat: 42.634569,  Lng: -70.976997),  Route carried "on" structure: Interstate 95,  Year Built: 1976,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 42,764 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 89,704 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY FULLER LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 115.644,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 19.7m (64.6ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $995,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,493,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B190082VBDOTNBI,  Location: .9 MI N IPSWICH RIVER (Lat: 42.634525,  Lng: -70.977514),  Route carried "on" structure: Interstate 95,  Year Built: 1950,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 42,919 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 89,704 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY FULLER LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 115.644,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 19.7m (64.6ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $995,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,493,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B190092VCDOTNBI,  Location: 1.3 MI N IPSWICH RIVER (Lat: 42.640808,  Lng: -70.976617),  Route carried "on" structure: Interstate 95,  Year Built: 1976,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 43,300 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 91,284 (year 2032),  Design Load: HS 20,  Features Intersected: WATER FISH BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 116.335,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 19.7m (64.6ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 55.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $1,161,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,742,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B190092VDDOTNBI,  Location: 1.3 MI N IPSWICH RIVER (Lat: 42.640892,  Lng: -70.977114),  Route carried "on" structure: Interstate 95,  Year Built: 1950,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 43,600 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 91,284 (year 2032),  Design Load: HS 20,  Features Intersected: WATER FISH BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 116.335,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 19.7m (64.6ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $1,161,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,742,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B1901030BDOTNBI,  Location: 1.4 MI N IPSWICH RIVER (Lat: 42.642231,  Lng: -70.976914),  Route carried "on" structure: State highway ,  Year Built: 1976,  Status: Open,  Structure Length: 7.89m (25.89ft),  Average Daily Traffic: 79,154 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,843 (year 2032),  Design Load: H 20,  Features Intersected: I 95,  Facility Carried by Structure: HWY LOCKWOOD LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.304,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.7m (127.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.90m (25.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $3,910,000,  Roadway Improvement Cost: $392,000,  Total Project Cost: $5,866,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B190112Y5DOTNBI,  Location: 2.1 MI N IPSWICH RIVER (Lat: 42.651164,  Lng: -70.977100),  Route carried "on" structure: State highway ,  Year Built: 1974,  Status: Open,  Structure Length: 11.13m (36.52ft),  Average Daily Traffic: 10,400 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,685 (year 2032),  Design Load: H 20,  Features Intersected: I 95,  Facility Carried by Structure: HWY TOPSFIELD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.012,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 55.0m (180.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.20m (36.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $7,127,000,  Roadway Improvement Cost: $713,000,  Total Project Cost: $10,691,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B1901230CDOTNBI,  Location: BEARHILL RD AT I-95 (Lat: 42.662264,  Lng: -70.976767),  Route carried "on" structure: State highway ,  Year Built: 1974,  Status: Open,  Structure Length: 9.05m (29.69ft),  Average Daily Traffic: 1,600 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 790 (year 2032),  Design Load: H 20,  Features Intersected: I 95,  Facility Carried by Structure: HWY BARE HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.416,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 44.8m (147.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.10m (29.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $3,089,000,  Roadway Improvement Cost: $309,000,  Total Project Cost: $4,634,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B19013C60MUNNBI,  Location: JUST WEST I 95 (Lat: 42.645169,  Lng: -70.989056),  Route carried "on" structure: City street ,  Year Built: 2020,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 5%,  Design Load: HL 93,  Features Intersected: WATER FISH BROOK,  Facility Carried by Structure: HWY LOCKWOOD LN
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B1901430DDOTNBI,  Location: 4.2 MI N IPSWICH RIVER (Lat: 42.683125,  Lng: -70.975083),  Route carried "on" structure: State highway 97,  Year Built: 1974,  Status: Open,  Structure Length: 7.83m (25.69ft),  Average Daily Traffic: 16,100 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 18,004 (year 2032),  Design Load: H 20,  Features Intersected: I 95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.219,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.7m (127.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 7.90m (25.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $9,906,000,  Roadway Improvement Cost: $991,000,  Total Project Cost: $14,860,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B190162R4MUNNBI,  Location: .1 MILES WEST MAIN STREET (Lat: 42.662300,  Lng: -71.018553),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 620 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,053 (year 2032),  Design Load: H 20,  Features Intersected: WATER FISH BROOK,  Facility Carried by Structure: HWY TOWNE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $397,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: B190072Y4DOTNBI,  Location: .3 MI N IPSWICH RIVER (Lat: 42.633333,  Lng: -70.983333),  Route carried "under" structure: Interstate 95,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 0000),  Features Intersected: I 95 SB,  Facility Carried by Structure: HWY ENDICOTT RD
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 114.743,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: B190072Y4DOTNBI,  Location: .3 MILES NO IPSWICH RIVER (Lat: 42.633333,  Lng: -70.983333),  Route carried "under" structure: Interstate 95,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 0000),  Features Intersected: I 95 NB,  Facility Carried by Structure: HWY ENDICOTT RD
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 114.743,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: B1901030BDOTNBI,  Location: 1.4 MI NO IPSWICH RIVER (Lat: 42.650000,  Lng: -70.983333),  Route carried "under" structure: Interstate 95,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 0000),  Features Intersected: I 95 SB,  Facility Carried by Structure: HWY LCKWOOD LN
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 116.484,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: B1901030BDOTNBI,  Location: 1.4 MI N IPSWICH RIVER (Lat: 42.650000,  Lng: -70.983333),  Route carried "under" structure: Interstate 95,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 0000),  Features Intersected: I 95 NB,  Facility Carried by Structure: HWY LCKWOOD LN
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 116.484,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: B190112Y5DOTNBI,  Location: 2.1 MI N IPSWICH RIVER (Lat: 42.650000,  Lng: -70.983333),  Route carried "under" structure: Interstate 95,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 0000),  Features Intersected: I 95 NB,  Facility Carried by Structure: HWY TOPFIELD RD
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 117.448,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 55.2m (181.1ft)

Find on map >>   Show street view

Structure Number: B190112Y5DOTNBI,  Location: 2.1 MI NO IPSWICH RIVER (Lat: 42.650000,  Lng: -70.983333),  Route carried "under" structure: Interstate 95,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 0000),  Features Intersected: I 95 SB,  Facility Carried by Structure: HWY TOPFIELD RD
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 117.448,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 55.2m (181.1ft)

Find on map >>   Show street view

Structure Number: B1901230CDOTNBI,  Location: BEARHILL RD AT I 95 (Lat: 42.666667,  Lng: -70.983333),  Route carried "under" structure: Interstate 95,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 0000),  Features Intersected: I 95 SB,  Facility Carried by Structure: HWY BARE HILL RD
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 118.702,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: B1901230CDOTNBI,  Location: BEARHILL RD AT I-95 (Lat: 42.666667,  Lng: -70.983333),  Route carried "under" structure: Interstate 95,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 0000),  Features Intersected: I 95 NB,  Facility Carried by Structure: HWY BARE HILL RD
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 118.702,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: B1901430DDOTNBI,  Location: 4.2 MI N IPSWICH RIVER (Lat: 42.683333,  Lng: -70.983333),  Route carried "under" structure: Interstate 95,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 0000),  Features Intersected: I 95 SB,  Facility Carried by Structure: ST 97 KILLAM HILL
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 121.031,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: B1901430DDOTNBI,  Location: 4.2 MI N IPSWICH RIVER (Lat: 42.683333,  Lng: -70.983333),  Route carried "under" structure: Interstate 95,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 0000),  Features Intersected: I 95 NB,  Facility Carried by Structure: ST 97 KILLAM HILL
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 121.031,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Discuss Boxford, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.