Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cambridge, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 407ft / 124mTotal length
  • $128,892,000Total costs
  • 490,797Total average daily traffic
  • 15,792Total average daily truck traffic
  • 914,888Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cambridge
  • No street view available for this location

New bridges in Cambridge, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11900-1909
  • 21920-1929
  • 11930-1939
  • 11940-1949
  • 51950-1959
  • 41980-1989
  • 11990-1999
  • 22000-2009
Reconstructed bridges in Cambridge, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 11980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Cambridge, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 29.4%Good
  • 23.5%Satisfactory
  • 29.4%Fair
  • 11.8%Poor
  • 5.9%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 44.4%Good
  • 11.1%Satisfactory
  • 27.8%Fair
  • 11.1%Poor
  • 5.6%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 27.8%Good
  • 33.3%Satisfactory
  • 33.3%Fair
  • 5.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: C010013F1DOTNBI,  Location: 500 FT W OF JCT SR 28 (Lat: 42.368453,  Lng: -71.074042),  Route carried "on" structure: State highway 3,  Year Built: 1986,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 53,793 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 63,646 (year 2031),  Design Load: HS 20,  Features Intersected: WATER LECHMERE CANAL,  Facility Carried by Structure: HWY LAND BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 10 degrees,  Navigation Control: Yes ( Vertical Clearance: 2.1m (6.9ft), Horizontal Clearance: 12.2m (40.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: March 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $8,284,000,  Roadway Improvement Cost: $829,000,  Total Project Cost: $12,427,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C010084DMDOTNBI,  Location: .16 KM N OF LONGFELLOW BR (Lat: 42.362503,  Lng: -71.078850),  Route carried "on" structure: State highway 3,  Year Built: 1924,  Year Reconstructed: 2000,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 17,600 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 30,007 (year 2031),  Design Load: H 20,  Features Intersected: WATER BROAD CANAL,  Facility Carried by Structure: HWY FIRST ST
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 1.062,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Navigation Control: Yes ( Vertical Clearance: 1.2m (3.9ft), Horizontal Clearance: 12.2m (40.0ft)),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 14.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Underwater Inspection Date: October 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $4,723,000,  Roadway Improvement Cost: $473,000,  Total Project Cost: $7,085,000 ( Estimate for 2022),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: C010114DJDOTNBI,  Location: .32 KM E OF MAGAZINE ST (Lat: 42.353556,  Lng: -71.109000),  Route carried "on" structure: State highway 3,  Year Built: 1906,  Year Reconstructed: 1982,  Status: Temporarily open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 47,200 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 78,175 (year 2032),  Features Intersected: RR CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.7m (90.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 27.7m (90.9ft),  Out-to-Out Width: 31.4m (103.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,851,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $2,777,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: C010123FUDOT634,  Location: .8 KM SE OF JCT SR2A&16 (Lat: 42.388381,  Lng: -71.119492),  Route carried "on" structure: Alternate State highway 2A,  Year Built: 1899,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 13,500 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 47,853 (year 2031),  Design Load: HS 20,  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: ST 2 A/MASS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.9m (32.5ft),  Curb or Sidewalk Widths: Left: 3.3m (10.8ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 28.7m (94.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,353,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $2,030,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: C01013ATEDOT634,  Location: 2.1 KM S OF JCT SR2A&16 (Lat: 42.389331,  Lng: -71.124758),  Route carried "on" structure: City street ,  Year Built: 2009,  Status: Open,  Structure Length: 2.86m (9.38ft),  Average Daily Traffic: 9,500 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,371 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY WALDEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.1m (46.3ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,340,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,011,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C010143FVDOT634,  Location: 2 MI S OF JCT SR2 (Lat: 42.374597,  Lng: -71.150067),  Route carried "on" structure: State highway ,  Year Built: 1955,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 19,000 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 60,803 (year 2031),  Design Load: H 20,  Features Intersected: OTHER GREENWAY M/U PATH,  Facility Carried by Structure: HWY MT AUBURN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 3.1m (10.2ft),  Right: 3.3m (10.8ft),  Curb-To-Curb Width: 40.8m (133.9ft),  Out-to-Out Width: 48.5m (159.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 31.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,668,000,  Roadway Improvement Cost: $267,000,  Total Project Cost: $4,003,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C010153FRDOT634,  Location: 2.4 KM S OF JCT SR2 (Lat: 42.378903,  Lng: -71.147764),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 10,300 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,636 (year 2031),  Design Load: H 20,  Features Intersected: OTHER GREENWAY M/U PATH,  Facility Carried by Structure: HWY HURON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $417,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $626,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C010163FTDOT634,  Location: 150 M JCT SR 16&2 (Lat: 42.380833,  Lng: -71.144639),  Route carried "on" structure: City street ,  Year Built: 1927,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.24m (4.07ft),  Average Daily Traffic: 775 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,527 (year 2032),  Design Load: HS 20,  Features Intersected: OTHER GREENWAY M/U PATH,  Facility Carried by Structure: HWY FRESH PND LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.1m (36.4ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $748,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $1,123,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C010204DHDOTNBI,  Location: .1 MI S OF RINGE AVE (Lat: 42.392131,  Lng: -71.141114),  Route carried "on" structure: US 3,  Year Built: 1996,  Status: Open,  Structure Length: 10.55m (34.61ft),  Average Daily Traffic: 72,000 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 107,392 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA/BMRR
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 80.516,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 3.1m (10.2ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.60m (34.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $4,398,000,  Roadway Improvement Cost: $440,000,  Total Project Cost: $6,598,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C010214DGDOTNBI,  Location: .32 KM N OF RINGE AVE (Lat: 42.396967,  Lng: -71.141100),  Route carried "on" structure: US 3,  Year Built: 1984,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 56,300 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 114,499 (year 2032),  Design Load: H 20,  Features Intersected: HWY ALW STA ACCESS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.000,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m,  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 35.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $959,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $1,439,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: C010234DQDOTNBI,  Location: N END HARVARD BR (Lat: 42.357228,  Lng: -71.092653),  Route carried "on" structure: Alternate State highway 2A,  Year Built: 1931,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 22,500 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 39,482 (year 2032),  Features Intersected: ST 3 MEMORIAL DR,  Facility Carried by Structure: ST 2 A/MASS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.4m (50.5ft),  Curb or Sidewalk Widths: Left: 3.5m (11.5ft),  Right: 3.5m (11.5ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 33.2m (108.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 99.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $177,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $266,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C010264DFDOTNBI,  Location: .2 MI FROM CITY LINE (Lat: 42.354031,  Lng: -71.110294),  Route carried "on" structure: US 3,  Year Built: 1940,  Year Reconstructed: 1982,  Status: Temporarily open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 29,000 (year 2014),  Average Future Daily Traffic: 47,379 (year 2031),  Design Load: H 20,  Features Intersected: HWY BROOKLINE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 19.00m (62.34ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $24,184,000,  Roadway Improvement Cost: $2,419,000,  Total Project Cost: $36,277,000 ( Estimate for 2022),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: C010314DRDOTNBI,  Location: .4 MI N OF CONCORD AVE (Lat: 42.396217,  Lng: -71.140722),  Route carried "on" structure: US 3,  Year Built: 1983,  Status: Posted for load,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 57,550 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 114,499 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: TR RED LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.151,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Fair,  Operating Rating: 34.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $4,336,000,  Roadway Improvement Cost: $434,000,  Total Project Cost: $6,505,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: C010384DPDOTNBI,  Location: JUST S OF LONGFELLOW BR (Lat: 42.360733,  Lng: -71.079625),  Route carried "on" structure: US 3,  Year Built: 1956,  Status: Posted for load-capacity,  Structure Length: 26.76m (87.80ft),  Average Daily Traffic: 13,000 (year 2014),  Average Future Daily Traffic: 34,745 (year 2031),  Design Load: HS 20,  Features Intersected: WATER CHARLES RIVER,  Facility Carried by Structure: HWY MEMORL DR EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 2.9m (9.5ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 26.80m (87.93ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Underwater Inspection Date: August 2019,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $13,475,000,  Roadway Improvement Cost: $1,348,000,  Total Project Cost: $20,213,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: C010394DNDOTNBI,  Location: JUST S OF LONGFELLOW BR (Lat: 42.360881,  Lng: -71.079839),  Route carried "on" structure: US 3,  Year Built: 1956,  Status: Posted for load-capacity,  Structure Length: 15.61m (51.21ft),  Average Daily Traffic: 17,000 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 25,269 (year 2031),  Design Load: HS 20,  Features Intersected: WATER CHARLES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Number Of Approach Spans: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 34.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.70m (51.51ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Underwater Inspection Date: August 2019,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $7,894,000,  Roadway Improvement Cost: $790,000,  Total Project Cost: $11,842,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: C010404DLDOTNBI,  Location: .1 MI N OF LONGFELLOW BR (Lat: 42.362450,  Lng: -71.078372),  Route carried "on" structure: State highway 3,  Year Built: 1956,  Status: Posted for load,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 15,611 (year 2020),  Average Future Daily Traffic: 40,430 (year 2031),  Features Intersected: WATER BROAD CANAL,  Facility Carried by Structure: HWY LAND BLVD
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 1.062,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Navigation Control: Yes ( Vertical Clearance: 1.2m (3.9ft), Horizontal Clearance: 12.2m (40.0ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 29.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Underwater Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $5,297,000,  Roadway Improvement Cost: $530,000,  Total Project Cost: $7,946,000 ( Estimate for 2022),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: C010454DKDOTNBI,  Location: .1 MI S OF LONGFELLOW BR (Lat: 42.360903,  Lng: -71.081667),  Route carried "on" structure: State highway 3,  Year Built: 1957,  Status: Posted for load-capacity,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 20,700 (year 2019),  Average Future Daily Traffic: 78,175 (year 2032),  Features Intersected: ST 3 SB TO LONGFLLW BRG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.131,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,122,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,684,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: C010498YHDOTNBI,  Location: NORTH OF CHARLES RIVER (Lat: 42.371156,  Lng: -71.066908),  Route carried "on" structure: Ramp Interstate 93,  Year Built: 2002,  Status: Open,  Structure Length: 23.77m (77.99ft),  Average Daily Traffic: 15,468 (year 2018),  Truck Traffic: 8%,  Design Load: HS 25 or greater,  Features Intersected: US 1 RAMP LC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 43.7m (143.4ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 88.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.80m (78.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,693,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $4,040,000 ( Estimate for 2022),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Cambridge, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.