Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Candler-McAfee, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 141ft / 42.5mTotal length
  • $14,855,000Total costs
  • 1,146,290Total average daily traffic
  • 17,031Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Candler-McAfee
  • No street view available for this location

New bridges in Candler-McAfee, GA - historical statistics
  • New bridges - historical statistics
  • 61950-1959
  • 61960-1969
  • 11980-1989
  • 11990-1999
  • 12000-2009
Reconstructed bridges in Candler-McAfee, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 21970-1979
Average Bridge Daily Traffic in Candler-McAfee, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 80.0%Good
  • 20.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Very good
  • 60.0%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 40.0%Good
  • 40.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 10.0%Very good
  • 70.0%Good
  • 20.0%Satisfactory
Find on map >>   Show street view

Structure Number: 890057,  Location: 8 MI SE OF DECATUR (Lat: 33.714119,  Lng: -84.236800),  Route carried "on" structure: Interstate 20,  Year Built: 1958,  Year Reconstructed: 1966,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 180,950 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 271,425 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: COBB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 107.826,  Lanes on structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 46.3m (151.9ft),  Skew: 39 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $559,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $839,000
Find on map >>   Show street view

Structure Number: 890092,  Location: 7 MI SE OF DECATUR (Lat: 33.724842,  Lng: -84.234356),  Route carried "on" structure: Interstate 285,  Year Built: 1966,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 166,570 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 249,855 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: M-9123 SNAPFINGER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 72.421,  Lanes on structure: 9,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 42.7m (140.1ft),  Skew: 39 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 42.7m (140.1ft),  Out-to-Out Width: 44.4m (145.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,978,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $2,967,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890093,  Location: 7.6 MI SE OF DECATUR (Lat: 33.718078,  Lng: -84.240069),  Route carried "on" structure: Ramp Interstate 285,  Year Built: 1966,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 25,900 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 38,850 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: COBB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.030,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $193,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $290,000
Find on map >>   Show street view

Structure Number: 890094,  Location: 7.5 MI SE OF DECATUR (Lat: 33.717403,  Lng: -84.239000),  Route carried "on" structure: Interstate 285,  Year Built: 1966,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 166,570 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 249,855 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: COBB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.030,  Lanes on structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 48.2m (158.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $597,000
Find on map >>   Show street view

Structure Number: 890095,  Location: I-285 & I-20 INT. (Lat: 33.716708,  Lng: -84.241439),  Route carried "on" structure: Ramp Interstate 285,  Year Built: 1965,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 48,800 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 73,200 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ABANDONED RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.030,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 890163,  Location: 4.5 MI SE OF DECATUR (Lat: 33.728908,  Lng: -84.237808),  Route carried "on" structure: City street 9123,  Year Built: 1960,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 7,030 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,545 (year 2031),  Design Load: H 15,  Features Intersected: COBB CREEK,  Facility Carried by Structure: SNAPFINGER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $217,000
Find on map >>   Show street view

Structure Number: 890192,  Location: 3.2 MI SE OF DECATUR (Lat: 33.731650,  Lng: -84.267028),  Route carried "on" structure: City street 9236,  Year Built: 1950,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 7,200 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,800 (year 2031),  Design Load: H 15,  Features Intersected: SHOAL CREEK,  Facility Carried by Structure: MCAFEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 890257,  Location: 8 MI SE OF DECATUR (Lat: 33.714444,  Lng: -84.239033),  Route carried "on" structure: Ramp Interstate 20,  Year Built: 1984,  Status: Open,  Structure Length: 8.14m (26.71ft),  Average Daily Traffic: 15,270 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 22,905 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 107.826,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,043,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,565,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 890315,  Location: 6 MI S OF DECATUR (Lat: 33.715208,  Lng: -84.305619),  Route carried "on" structure: City street 9122,  Year Built: 1992,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 11,130 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,695 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-20,  Facility Carried by Structure: FLAT SHOALS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 4,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,316,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,975,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 895008,  Location: 2 MI SE OF DECATUR (Lat: 33.720528,  Lng: -84.265578),  Route carried "on" structure: County highway 388,  Year Built: 1960,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: SHOAL CREEK,  Facility Carried by Structure: TONEY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 895099,  Location: 1.5 MI S OF DECATUR (Lat: 33.721069,  Lng: -84.296108),  Route carried "on" structure: County highway 187,  Year Built: 1950,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: DOOLITTLE CREEK,  Facility Carried by Structure: W. TILSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.7m (5.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $158,000
Find on map >>   Show street view

Structure Number: 8951,  Location: 1.5 MI SOF DECATUR (Lat: 33.722883,  Lng: -84.297719),  Route carried "on" structure: County highway 199,  Year Built: 1957,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: DOOLITTLE CREEK,  Facility Carried by Structure: TILSON CIRCLE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $133,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $199,000
Find on map >>   Show street view

Structure Number: 895101,  Location: 3.7 MI SE OF DECATUR (Lat: 33.723947,  Lng: -84.258006),  Route carried "on" structure: County highway 367,  Year Built: 1958,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: SHOAL CREEK TRIB,  Facility Carried by Structure: SHAMROCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.5m (4.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 895102,  Location: 3.7 MI SE OF DECATUR (Lat: 33.728058,  Lng: -84.255797),  Route carried "on" structure: County highway 453,  Year Built: 1958,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: SHOAL CREEK TRIB,  Facility Carried by Structure: IRISH LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 895156,  Location: 10.5 MILES WEST OF LITHON (Lat: 33.711606,  Lng: -84.217356),  Route carried "on" structure: County highway 5196,  Year Built: 2006,  Status: Open,  Structure Length: 9.39m (30.81ft),  Average Daily Traffic: 31,460 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 47,190 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-20 EAST/WEST,  Facility Carried by Structure: WESLEY CHAPEL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 8,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 32.3m (106.0ft),  Out-to-Out Width: 36.6m (120.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 304.80m (1000.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,173,000,  Roadway Improvement Cost: $317,000,  Total Project Cost: $4,759,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890092,  Location: 7 MI SE OF DECATUR (Lat: 33.724842,  Lng: -84.234356),  Route carried "under" structure: City street 9123,  Structure Length: 0. m,  Average Daily Traffic: 11,800 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-285 (SR 407),  Facility Carried by Structure: I-285
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 1.609,  Lanes on structure: 9,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 890257,  Location: 8 MI SE OF DECATUR (Lat: 33.714444,  Lng: -84.239033),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 184,800 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-20 RAMP
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 107.826,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 890315,  Location: 6 MI S OF DECATUR (Lat: 33.715208,  Lng: -84.305619),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 138,500 (year 1999),  Truck Traffic: 1%,  Features Intersected: M-9122 FLAT SHOALS ROAD,  Facility Carried by Structure: FLAT SHOALS ROAD
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 101.389,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 895156,  Location: 10.5 MILES WEST OF LITHON (Lat: 33.711606,  Lng: -84.217356),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 139,300 (year 2006),  Truck Traffic: 5%,  Features Intersected: M-9015 WESLEY CHAPEL RD,  Facility Carried by Structure: WESLEY CHAPEL ROAD
Minimum Vertical Clearance: 5.81m (19.06ft),  Kilometerpoint: 111.045,  Lanes on structure: 8,  Length of Maximum Span: 0.0m

Discuss Candler-McAfee, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.