Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Citronelle, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 190ft / 58.0mTotal length
  • $16,528,000Total costs
  • 18,529Total average daily traffic
  • 2,444Total average daily truck traffic
  • 26,688Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Citronelle
  • No street view available for this location

New bridges in Citronelle, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 31950-1959
  • 11960-1969
  • 11980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Citronelle, AL
Average Bridge Truck Traffic in Citronelle, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 28.6%Good
  • 14.3%Satisfactory
  • 42.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 28.6%Good
  • 57.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 28.6%Good
  • 28.6%Satisfactory
  • 42.9%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 45.5%Good
  • 36.4%Satisfactory
  • 18.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 624,  Location: 0.4 MI S WASH CO LINE (Lat: 31.140408,  Lng: -88.255797),  Route carried "on" structure: US 45,  Year Built: 1929,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 5,297 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 7,946 (year 2038),  Design Load: H 15,  Features Intersected: BENNETTS CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.686,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 70.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $261,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $287,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2318,  Location: 2.3 MI. N. OF FREIBURG (Lat: 31.173897,  Lng: -88.273378),  Route carried "on" structure: US 45,  Year Built: 1940,  Status: Open,  Structure Length: 1.63m (5.35ft),  Average Daily Traffic: 4,750 (year 2013),  Truck Traffic: 18%,  Average Future Daily Traffic: 6,126 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: SR 17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.785,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $413,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $454,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3606,  Location: 3.25 MI E MISS ST LINE (Lat: 31.085400,  Lng: -88.375492),  Route carried "on" structure: County highway ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 18.65m (61.19ft),  Average Daily Traffic: 959 (year 2021),  Truck Traffic: 18%,  Average Future Daily Traffic: 1,425 (year 2041),  Design Load: H 15,  Features Intersected: ESCATAWPA RIVER,  Facility Carried by Structure: BEVERLY JEFFERIES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.500,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 11,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 19.30m (63.32ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $3,572,000,  Roadway Improvement Cost: $357,000,  Total Project Cost: $3,929,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3984,  Location: 4.6 MI E OF CITRONELLE (Lat: 31.109494,  Lng: -88.184586),  Route carried "on" structure: Spur County highway 96,  Year Built: 1951,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,513 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,734 (year 2040),  Design Load: HS 20,  Features Intersected: TRIB. TO CEDAR CREEK,  Facility Carried by Structure: WEST COY SMITH HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $413,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 846,  Location: 8.5 MI N CO RD 63 (Lat: 31.017481,  Lng: -88.347694),  Route carried "on" structure: State highway 217,  Year Built: 1964,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 747 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,121 (year 2038),  Design Load: H 15,  Features Intersected: PUPPY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.361,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,455,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $1,601,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11541,  Location: 4.5 MI E CITRONELLE (Lat: 31.119475,  Lng: -88.165169),  Route carried "on" structure: County highway ,  Year Built: 1950,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 8.93m (29.30ft),  Average Daily Traffic: 2,370 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,522 (year 2040),  Design Load: H 15,  Features Intersected: CEDAR CREEK,  Facility Carried by Structure: WEST COY SMITH HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.500,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.90m (32.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,309,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $2,540,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12942,  Location: 1.8 MI S OF COY SMITH HWY (Lat: 31.106558,  Lng: -88.120428),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 403 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 599 (year 2040),  Design Load: HS 20,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: PATILLO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $485,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1552,  Location: 2.3 MI W US 45 (Lat: 31.056075,  Lng: -88.268167),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 460 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 684 (year 2040),  Design Load: HS 20,  Features Intersected: PUPPY CREEK,  Facility Carried by Structure: RUSSELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.300,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $509,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $560,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15521,  Location: 1.2 MI W US 45 (Lat: 31.056086,  Lng: -88.266525),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 460 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 684 (year 2040),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: RUSSELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.199,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $514,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $565,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18777,  Location: 2.4 MI S OF CO. RD 96 (Lat: 31.048819,  Lng: -88.370792),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 15.18m (49.80ft),  Average Daily Traffic: 449 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 667 (year 2040),  Design Load: HS 20,  Features Intersected: ESCATAWPA RIVER,  Facility Carried by Structure: LOTT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.862,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.2m (23.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.95m (52.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,593,000,  Roadway Improvement Cost: $459,000,  Total Project Cost: $5,052,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20575,  Location: 0.8 MILES N/LONNIE WALKER (Lat: 31.125639,  Lng: -88.284133),  Route carried "on" structure: County highway 229,  Year Built: 2011,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 121 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 180 (year 2040),  Design Load: HS 20,  Features Intersected: BENNET'S CREEK,  Facility Carried by Structure: BILLY WALKER RD E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Discuss Citronelle, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.