Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Clifton Springs, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 151ft / 46.0mTotal length
  • $22,325,000Total costs
  • 119,342Total average daily traffic
  • 9,979Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Clifton Springs
  • No street view available for this location

New bridges in Clifton Springs, NY - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11940-1949
  • 91950-1959
  • 11980-1989
  • 31990-1999
  • 22000-2009
Reconstructed bridges in Clifton Springs, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 41980-1989
  • 11990-1999
Average Bridge Daily Traffic in Clifton Springs, NY
Average Bridge Truck Traffic in Clifton Springs, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 33.3%Good
  • 20.0%Satisfactory
  • 26.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 46.7%Good
  • 13.3%Satisfactory
  • 20.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 13.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Very good
  • 50.0%Good
  • 33.3%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: 103511,  Location: 3.6 MI E JCT RTS 96 & 21 (Lat: 42.970597,  Lng: -77.158217),  Route carried "on" structure: State highway 96,  Year Built: 1995,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 7,874 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,565 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: FALL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.184,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $520,000,  Roadway Improvement Cost: $304,000,  Total Project Cost: $824,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 331812,  Location: 1.4 MI N CLIFTON SPRING (Lat: 42.981553,  Lng: -77.129411),  Route carried "on" structure: Other road ,  Year Built: 1958,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 674 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 944 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: CANANDAIGUA OUTLT,  Facility Carried by Structure: MCBURNEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $905,000,  Roadway Improvement Cost: $530,000,  Total Project Cost: $1,435,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331813,  Location: 0.2 MI W CLIFTON SPRINGS (Lat: 42.963408,  Lng: -77.152961),  Route carried "on" structure: Other road ,  Year Built: 1935,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 461 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 645 (year 2036),  Design Load: HS 20,  Features Intersected: ROCKY RUN,  Facility Carried by Structure: STEVENS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.381,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $348,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $551,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331839,  Location: 1 1/2 MI NE OF ORLEANS (Lat: 42.938597,  Lng: -77.100275),  Route carried "on" structure: Other road ,  Year Built: 1947,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 567 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 794 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: FLINT CREEK,  Facility Carried by Structure: WHEAT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.639,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $706,000,  Roadway Improvement Cost: $414,000,  Total Project Cost: $1,120,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331853,  Location: 3.4 MI SE OF MANCHESTER (Lat: 42.944878,  Lng: -77.174469),  Route carried "on" structure: Other road ,  Year Built: 2006,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 700 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 980 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: SPRING BROOK,  Facility Carried by Structure: TOWN LINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 81.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $348,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $552,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331864,  Location: 1 MI W OF CLIFTON SPRINGS (Lat: 42.967664,  Lng: -77.157542),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 289 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 405 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ROCKY RUN,  Facility Carried by Structure: KING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $606,000,  Roadway Improvement Cost: $355,000,  Total Project Cost: $960,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331869,  Location: 2.8 MI.NE OF MANCHESTER (Lat: 42.980792,  Lng: -77.179125),  Route carried "on" structure: County highway ,  Year Built: 1939,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 2,919 (year 2017),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,087 (year 2037),  Design Load: HS 20,  Features Intersected: CANANDAIGUA OUTLT,  Facility Carried by Structure: PORT GIBSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.156,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 61.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,211,000,  Roadway Improvement Cost: $709,000,  Total Project Cost: $1,920,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33187,  Location: 4 MI E OF MANCHESTER (Lat: 42.960089,  Lng: -77.154281),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 2,449 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,429 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: SPRING BROOK,  Facility Carried by Structure: COUNTY ROAD 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.843,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $389,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $617,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331874,  Location: 1.0 MI. N. OF CLIFTON (Lat: 42.975361,  Lng: -77.141278),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 5,156 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,218 (year 2040),  Design Load: HS 20,  Features Intersected: CANANDAIGUA OUTLET,  Facility Carried by Structure: FIVE WATERS CLIFTO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,251,000,  Roadway Improvement Cost: $733,000,  Total Project Cost: $1,984,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 331879,  Location: HAMLET OF ORLEANS (Lat: 42.917594,  Lng: -77.111967),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 1,643 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,300 (year 2037),  Design Load: HS 20,  Features Intersected: FLINT CREEK,  Facility Carried by Structure: COUNTY ROAD 23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 53.0m (173.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.45m (17.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,541,000,  Roadway Improvement Cost: $902,000,  Total Project Cost: $2,443,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5510811,  Location: 3.9 MI E OF EXIT 43 90I (Lat: 42.973486,  Lng: -77.157819),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 18,825 (year 2014),  Truck Traffic: 18%,  Design Load: HS 20+Mod,  Features Intersected: FALL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 541.348,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,078,000,  Roadway Improvement Cost: $631,000,  Total Project Cost: $1,709,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5510812,  Location: 3.9 MI E OF EXIT 43 90I (Lat: 42.972950,  Lng: -77.157833),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 13,793 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 19,182 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: FALL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.466,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $991,000,  Roadway Improvement Cost: $580,000,  Total Project Cost: $1,571,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 551096,  Location: 2.7 MI E OF EXIT 43 90I (Lat: 42.973536,  Lng: -77.180369),  Route carried "on" structure: County highway ,  Year Built: 1953,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 2,919 (year 2017),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,611 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 90IX EB,  Facility Carried by Structure: CR 7 PORT GIBSON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.352,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Toll Authority,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.41m (14.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,060,000,  Roadway Improvement Cost: $621,000,  Total Project Cost: $1,680,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 551097,  Location: 4.7 MI E OF EXIT 43 90I (Lat: 42.972992,  Lng: -77.140631),  Route carried "on" structure: County highway ,  Year Built: 1953,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 9.08m (29.79ft),  Average Daily Traffic: 5,156 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,379 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: CR 25 KENDALL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,069,000,  Roadway Improvement Cost: $1,211,000,  Total Project Cost: $3,280,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5511,  Location: 2.7 MI E OF EXIT 43 90I (Lat: 42.974369,  Lng: -77.180197),  Route carried "on" structure: County highway ,  Year Built: 1954,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 2,919 (year 2017),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,045 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE I90,  Facility Carried by Structure: CR 7 PORT GIBSON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Toll Authority,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.41m (14.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,059,000,  Roadway Improvement Cost: $620,000,  Total Project Cost: $1,679,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 551096,  Location: 2.7 MI E OF EXIT 43 90I (Lat: 42.973536,  Lng: -77.180369),  Route carried "under" structure: Interstate ,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 17,666 (year 1977),  Features Intersected: 90IX EB,  Facility Carried by Structure: CR 7 PORT GIBSON
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 542.989,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 551097,  Location: 4.7 MI E OF EXIT 43 90I (Lat: 42.972992,  Lng: -77.140631),  Route carried "under" structure: Interstate 90,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 17,666 (year 1977),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: CR 25 KENDALL RD
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 539.739,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 5511,  Location: 2.7 MI E OF EXIT 43 90I (Lat: 42.974369,  Lng: -77.180197),  Route carried "under" structure: Interstate 90,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 17,666 (year 1977),  Features Intersected: RTE I90,  Facility Carried by Structure: CR 7 PORT GIBSON
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 543.005,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Discuss Clifton Springs, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.