Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Como, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 190ft / 58.2mTotal length
  • $6,583,136,000Total costs
  • 113,990Total average daily traffic
  • 24,916Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Como
  • No street view available for this location

New bridges in Como, MS - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 131950-1959
  • 41970-1979
  • 21980-1989
Average Bridge Daily Traffic in Como, MS
Average Bridge Truck Traffic in Como, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.7%Very good
  • 33.3%Good
  • 46.7%Satisfactory
  • 13.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.7%Very good
  • 33.3%Good
  • 20.0%Satisfactory
  • 33.3%Fair
  • 6.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 13.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Good
  • 58.3%Satisfactory
  • 33.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 11000550542576A,  Location: I 55 OVER SR 310 (Lat: 34.510383,  Lng: -89.922494),  Route carried "on" structure: Interstate 55,  Year Built: 1959,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 13,000 (year 2020),  Truck Traffic: 27%,  Average Future Daily Traffic: 16,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SR 310
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.023,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 42.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.03m (19.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $548,000,000,  Roadway Improvement Cost: $55,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000550542576B,  Location: I 55 OVER SR 310 (Lat: 34.509994,  Lng: -89.922056),  Route carried "on" structure: Interstate 55,  Year Built: 1959,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 13,000 (year 2020),  Truck Traffic: 27%,  Average Future Daily Traffic: 16,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SR 310
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.908,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 42.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.03m (19.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $548,000,000,  Roadway Improvement Cost: $55,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000550542595,  Location: 1.9 MI N SR 310 (Lat: 34.535636,  Lng: -89.931478),  Route carried "on" structure: Interstate 55,  Year Built: 1959,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 24,000 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 30,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.882,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 39.0m (128.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $86,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $286,000,000
Find on map >>   Show street view

Structure Number: 11000550542598A,  Location: 2.1 MI N SR 310 (Lat: 34.539397,  Lng: -89.933161),  Route carried "on" structure: Interstate 55,  Year Built: 1959,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 12,000 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 15,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: COMPRESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.659,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 42.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.03m (19.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $548,000,000,  Roadway Improvement Cost: $55,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000550542598B,  Location: 2.1 MI N SR 310 (Lat: 34.539006,  Lng: -89.932722),  Route carried "on" structure: Interstate 55,  Year Built: 1959,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 12,000 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 15,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: COMPRESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.273,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 42.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.03m (19.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $548,000,000,  Roadway Improvement Cost: $55,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31003100540305,  Location: 0.2 MI E US 51 (Lat: 34.510431,  Lng: -89.945711),  Route carried "on" structure: State highway 310,  Year Built: 1988,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 3,000 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,000 (year 2040),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.237,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 42.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 31003100540332,  Location: 1.7 MI E I 55 (Lat: 34.510169,  Lng: -89.891692),  Route carried "on" structure: State highway 310,  Year Built: 1950,  Status: Posted for load,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 1,800 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,800 (year 2040),  Design Load: H 15,  Features Intersected: MATTIE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.201,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 32.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.15m (20.18ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $562,000,000,  Roadway Improvement Cost: $56,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31003100540336,  Location: 2.1 MI E I 55 (Lat: 34.510042,  Lng: -89.886064),  Route carried "on" structure: State highway 310,  Year Built: 1950,  Status: Posted for load,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 1,800 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,800 (year 2040),  Design Load: H 15,  Features Intersected: NELSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.717,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.15m (20.18ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $562,000,000,  Roadway Improvement Cost: $56,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31003100540344,  Location: 2.9 MI E I 55 (Lat: 34.509975,  Lng: -89.871578),  Route carried "on" structure: State highway 310,  Year Built: 1970,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 1,800 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,800 (year 2040),  Design Load: HS 20,  Features Intersected: NELSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.048,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 64.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 41000550542555,  Location: 3.1 MI N SR 315 (Lat: 34.480842,  Lng: -89.911889),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 40 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 60 (year 2040),  Design Load: HS 15,  Features Intersected: I 55,  Facility Carried by Structure: HOLLSTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.251,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $54,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $295,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA5400000000008,  Location: SEC 25 T 6S R 7W B (Lat: 34.539208,  Lng: -89.895706),  Route carried "on" structure: County highway 116,  Year Built: 1973,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 400 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 600 (year 2038),  Design Load: HS 15,  Features Intersected: NELSON CREEK,  Facility Carried by Structure: COMPRESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.115,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5400000000009,  Location: SEC 26 T 6S R 7W B (Lat: 34.539253,  Lng: -89.899117),  Route carried "on" structure: County highway 116,  Year Built: 1973,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 400 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 600 (year 2038),  Design Load: HS 15,  Features Intersected: WILBORN CREEK,  Facility Carried by Structure: COMPRESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.793,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA540000000001,  Location: SEC 28 T 6S R 7W B (Lat: 34.539253,  Lng: -89.934975),  Route carried "on" structure: County highway 116,  Year Built: 1973,  Status: Posted for load,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 400 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 600 (year 2038),  Design Load: HS 15,  Features Intersected: CREEK,  Facility Carried by Structure: COMPRESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.243,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.33m (10.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $273,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $410,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5400000000011,  Location: SEC 29 T 6S R 7W (Lat: 34.539167,  Lng: -89.957750),  Route carried "on" structure: County highway 121,  Year Built: 1958,  Status: Posted for load,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 150 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 225 (year 2043),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: ABE CHAPEL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.988,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.4m (14.4ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 12.3m (40.4ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 5.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $213,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $384,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA5400000000012,  Location: SEC_30_T 6S_R 7W (Lat: 34.524833,  Lng: -89.983944),  Route carried "on" structure: County highway 122,  Year Built: 1980,  Status: Posted for load,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 120 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 180 (year 2043),  Features Intersected: CREEK,  Facility Carried by Structure: COMPRESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.1m (85.6ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 7.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $322,000,  Roadway Improvement Cost: $258,000,  Total Project Cost: $580,000 ( Estimate for 2021),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA5400000000013,  Location: SEC_33_T 6S_R 7W (Lat: 34.524667,  Lng: -89.950389),  Route carried "on" structure: County highway 42,  Year Built: 1945,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 220 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 330 (year 2043),  Features Intersected: PORTER CREEK,  Facility Carried by Structure: COMPRESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.482,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 5.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $233,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA5400000000041,  Location: SEC 18 T 7S R 7W (Lat: 34.466639,  Lng: -89.976083),  Route carried "on" structure: County highway 168,  Year Built: 1939,  Status: Posted for load,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 60 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 90 (year 2043),  Features Intersected: CREEK,  Facility Carried by Structure: PEAGRAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 18.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.34m (10.96ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $297,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $535,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11000550542576A,  Location: I 55 OVER SR 310 (Lat: 34.510200,  Lng: -89.922419),  Route carried "under" structure: State highway 310,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 2,900 (year 2017),  Truck Traffic: 8%,  Features Intersected: SR 310,  Facility Carried by Structure: I 55
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 25.378,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 11000550542576B,  Location: I 55 OVER SR 310 (Lat: 34.510200,  Lng: -89.922131),  Route carried "under" structure: State highway 310,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 2,900 (year 2017),  Truck Traffic: 8%,  Features Intersected: SR 310,  Facility Carried by Structure: I 55
Minimum Vertical Clearance: 4.59m (15.06ft),  Kilometerpoint: 25.405,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 41000550542555,  Location: 3.1 MI N SR 315 (Lat: 34.480839,  Lng: -89.911639),  Route carried "under" structure: US 55,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2017),  Truck Traffic: 30%,  Features Intersected: I 55,  Facility Carried by Structure: HOLLSTON ROAD
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 8.449,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 41000550542555,  Location: 3.1 MI N SR 315 (Lat: 34.480839,  Lng: -89.911361),  Route carried "under" structure: US 55,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2017),  Truck Traffic: 30%,  Features Intersected: I 55,  Facility Carried by Structure: HOLLSTON ROAD
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 35.529,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.3m (69.9ft)

Discuss Como, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.